{"id":40267,"date":"2015-06-13T17:10:34","date_gmt":"2015-06-13T14:10:34","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=40267"},"modified":"2015-06-13T17:10:34","modified_gmt":"2015-06-13T14:10:34","slug":"res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi-2","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi-2\/","title":{"rendered":"(Turkish) RES ve GES`lere 3.7 GW`lik Lisanss\u0131z Kapasite Tahsisi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/40267\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Haziran ay\u0131 lisanss\u0131z g\u00fcne\u015f ve r\u00fczgar enerjisi yat\u0131r\u0131mlar\u0131 i\u00e7in toplam 3746,7MW`l\u0131k kapasite tahsisi yap\u0131ld\u0131.<\/strong><\/p>\n<p>T\u00fcrkiye Elektrik \u0130letim A.\u015e. ( TE\u0130A\u015e)`\u0131n a\u00e7\u0131klad\u0131\u011f\u0131 Haziran-2015 lisanss\u0131z RES-GES kapasite verilerine g<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi-2.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-40268\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi-2-300x198.jpg\" alt=\"res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi-2\" width=\"300\" height=\"198\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi-2-300x198.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi-2-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi-2.jpg 500w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\u00f6re, 49 ildeki trafo merkezlerinde tahsis edilen g\u00fcne\u015f ve r\u00fczgar enerjisi kapasitesi 3746,7 MW iken, maksimum kapasite 5312,8 MW olarak a\u00e7\u0131kland\u0131.<\/p>\n<p>TE\u0130A\u015e bir \u00f6nceki May\u0131s ay\u0131nda g\u00fcne\u015f ve r\u00fczgar enerjisi kapasitesini 3711,7 MW, maksimum kapasiteyi de 5249,8 MW olarak a\u00e7\u0131klam\u0131\u015ft\u0131.<\/p>\n<p>Listede, bug\u00fcne kadar da\u011f\u0131t\u0131m \u015firketleri ve organize sanayi b\u00f6lgeleri taraf\u0131ndan y\u00f6netmelik\u00e7e tahsis edilen 2 MW kapasiteye ilave talebin bulunmad\u0131\u011f\u0131 merkezler yer almad\u0131. Bu merkezlere ait olu\u015fabilecek ilave veriler gelecek talepler \u00e7er\u00e7evesinde listeye eklenecek.<\/p>\n<p>TE\u0130A\u015e, lisanss\u0131z GES ve RES ba\u011flant\u0131 kapasiteleri listesini her ay\u0131n ilk haftas\u0131nda g\u00fcncelleyerek kendi internet sitesinde yay\u0131mlamaya devam edecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/res-ve-geslere-37-gwlik-lisanssiz-kapasite-tahsisi_14043.html#.VXw-EPntmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Haziran ay\u0131 lisanss\u0131z g\u00fcne\u015f ve r\u00fczgar enerjisi yat\u0131r\u0131mlar\u0131 i\u00e7in toplam 3746,7MW`l\u0131k kapasite tahsisi yap\u0131ld\u0131. T\u00fcrkiye Elektrik \u0130letim A.\u015e. ( TE\u0130A\u015e)`\u0131n a\u00e7\u0131klad\u0131\u011f\u0131 Haziran-2015 lisanss\u0131z [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40268,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,50],"tags":[63,67,1009,2698,165,2326,2569,23461,23460,474,231,1582,105],"views":1164,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40267"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=40267"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40267\/revisions"}],"predecessor-version":[{"id":40269,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40267\/revisions\/40269"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40268"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=40267"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=40267"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=40267"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}