{"id":40186,"date":"2015-06-11T12:36:33","date_gmt":"2015-06-11T09:36:33","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=40186"},"modified":"2015-06-11T12:36:33","modified_gmt":"2015-06-11T09:36:33","slug":"tekirdaga-350-mwlik-termik-santral-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tekirdaga-350-mwlik-termik-santral-yapilacak\/","title":{"rendered":"(Turkish) Tekirda\u011f`a 350 MW`l\u0131k Termik Santral Yap\u0131lacak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/40186\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kaptan Demir \u00c7elik End. Ve Tic. A. \u015e., Tekirda\u011f \u0130li, Ergene \u0130l\u00e7esi, Ergene-1 OSB i\u00e7erisinde 350 MW`l\u0131k termik santral kurmay\u0131 planl\u0131yor.<\/strong><\/p>\n<p>Kaptan Demir \u00c7elik End. Ve Tic. A. \u015e. taraf\u0131ndan Tekirda\u011f \u0130li, Ergene \u0130l\u00e7esi, Ergene-1 OSB i\u00e7erisinde, 346 <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/tekirdaga-350-mwlik-termik-santral-yapilacak.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-40187 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/tekirdaga-350-mwlik-termik-santral-yapilacak-300x220.jpg\" alt=\"tekirdaga-350-mwlik-termik-santral-yapilacak\" width=\"300\" height=\"220\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/tekirdaga-350-mwlik-termik-santral-yapilacak-300x220.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/tekirdaga-350-mwlik-termik-santral-yapilacak-500x368.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/tekirdaga-350-mwlik-termik-santral-yapilacak-67x50.jpg 67w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/tekirdaga-350-mwlik-termik-santral-yapilacak.jpg 580w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>Ada, 1 Nolu Parselde ithal k\u00f6m\u00fcr yak\u0131tl\u0131 \u201cKaptan Termik Santrali Projesi (350 MWe\/853MWt)\u201d planlan\u0131yor.<\/p>\n<p>Proje kapsam\u0131nda termik santral, \u015falt sahas\u0131, k\u00f6m\u00fcr depolama sahas\u0131, ge\u00e7ici k\u00fcl depolama sahas\u0131 ve kalker depolama sahas\u0131 yap\u0131lacak ve ihtiya\u00e7 duyulan k\u00f6m\u00fcr firman\u0131n sahibi oldu\u011fu Marmara Ere\u011flisi\u2019nde bulunan liman tesislerinden getirilecek. Sisteme k\u00f6m\u00fcr verilme i\u015flemine ba\u015flanana kadar ise tesiste yard\u0131mc\u0131 yak\u0131t olarak do\u011falgaz kullan\u0131lmas\u0131 planlan\u0131yor.<\/p>\n<p>Kaptan Termik Santrali ile y\u0131ll\u0131k ortalama 2.537.500 MWh elektrik enerjisi \u00fcretilmesi planlan\u0131yor. Tesiste \u00fcretilen elektrik enerjisi ile Ergene-1 OSB y\u00f6netiminin elektrik ihtiyac\u0131n\u0131n kar\u015f\u0131lanmas\u0131, \u00fcretilen buhar ile de Ergene-1 OSB i\u00e7erisinde yer alan tekstil fabrikalar\u0131n\u0131n buhar ihtiyac\u0131n\u0131n kar\u015f\u0131lanmas\u0131 ama\u00e7lan\u0131yor.<\/p>\n<p>\u00d6mr\u00fc 49 y\u0131l, maliyeti ise 400 milyon TL olarak planlanan projenin in\u015faat a\u015famas\u0131nda toplam 500, i\u015fletme a\u015famas\u0131nda ise toplam 250 personelin g\u00f6rev almas\u0131 ve personelin olabildi\u011fince y\u00f6re halk\u0131ndan temin edilmesi planlan\u0131yor.<\/p>\n<p><strong>PROJE \u0130LE \u0130LG\u0130L\u0130 \u00c7ED S\u00dcREC\u0130 BA\u015eLADI<\/strong><\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`n\u00fcn internet sitesinde konu ile ilgili yap\u0131lan a\u00e7\u0131klamada, proje ile ilgili \u00c7evresel Etki De\u011ferlendirmesi s\u00fcrecinin ba\u015flad\u0131\u011f\u0131 duyuruldu. \u00c7ED S\u00fcreci tamamlanana kadar s\u00fcre\u00e7 ile ilgili her t\u00fcrl\u00fc bilgiler ve projeye ili\u015fkin g\u00f6r\u00fc\u015f, soru ve \u00f6neriler Tekirda\u011f Valili\u011fi`ne (\u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc) veya \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131na g\u00f6nderilebilecek.<\/p>\n<p>Kaynak: Enerji\u00a0G\u00fcnl\u00fc\u011f\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kaptan Demir \u00c7elik End. Ve Tic. A. \u015e., Tekirda\u011f \u0130li, Ergene \u0130l\u00e7esi, Ergene-1 OSB i\u00e7erisinde 350 MW`l\u0131k termik santral kurmay\u0131 planl\u0131yor. Kaptan Demir [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40187,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[5927,63,67,1009,2698,165,23414,23415,1675,4513,437],"views":1486,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40186"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=40186"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40186\/revisions"}],"predecessor-version":[{"id":40188,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40186\/revisions\/40188"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40187"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=40186"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=40186"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=40186"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}