{"id":40099,"date":"2015-06-09T11:59:13","date_gmt":"2015-06-09T08:59:13","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=40099"},"modified":"2015-06-09T11:59:13","modified_gmt":"2015-06-09T08:59:13","slug":"omala-hes-tokat-sulama-sularini-turbinleyecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/omala-hes-tokat-sulama-sularini-turbinleyecek\/","title":{"rendered":"(Turkish) Omala HES Tokat Sulama Sular\u0131n\u0131 T\u00fcrbinleyecek!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/40099\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Adsel Elektrik taraf\u0131ndan Tokat`ta tap\u0131lmas\u0131 planlanan Omala Baraj\u0131 ve HES, Atak\u00f6y HES projesinden b\u0131rak\u0131lan ve Tokat Sulamas\u0131 kapsam\u0131nda kullan\u0131lan sular\u0131n\u0131 t\u00fcrbinleyecek.<\/strong><\/p>\n<p>Adsel Elektrik Enerji \u00dcretim A.\u015e. taraf\u0131ndan Tokat \u0130li, Merkez \u0130l\u00e7e ve Almus \u0130l\u00e7esi\u2019nde Ye\u015fil\u0131rmak Havzas\u0131nda Ye\u015fil\u0131rmak \u00fczerinde 5.37 MW kurulu g\u00fcc\u00fcnde Omala Baraj\u0131 ve HES Projesi yap\u0131m\u0131 planlan\u0131yor. Ayr\u0131ca \u015firket, proje e k<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/omala-hes-tokat-sulama-sularini-turbinleyecek.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-40100\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/omala-hes-tokat-sulama-sularini-turbinleyecek-300x162.jpg\" alt=\"omala-hes-tokat-sulama-sularini-turbinleyecek\" width=\"300\" height=\"162\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/omala-hes-tokat-sulama-sularini-turbinleyecek-300x162.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/omala-hes-tokat-sulama-sularini-turbinleyecek-500x271.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/omala-hes-tokat-sulama-sularini-turbinleyecek-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/omala-hes-tokat-sulama-sularini-turbinleyecek.jpg 699w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>apsam\u0131nda in\u015faat i\u015flerinde kullan\u0131lmak \u00fczere 1 adet Beton santrali ve bir adet Y\u0131kama Eleme Tesisinin i\u015fletilmesi planl\u0131yor.<\/p>\n<p>Bedeli 88.107.550,51 TL olarak planlanan Omala Baraj\u0131 ve HES projesi ile Karakaya HES ve0.72 MW`l\u0131k Tokmakkaya HES Projesinin de sulama pompaj giderlerinin kar\u015f\u0131lanmas\u0131 tek bir proje alt\u0131nda yap\u0131lmas\u0131 planlan\u0131yor.<\/p>\n<p>Omala Baraj\u0131 ve HES Projesinde Atak\u00f6y HES projesinden b\u0131rak\u0131lan ve Tokat Sulamas\u0131 kapsam\u0131nda kullan\u0131lan sular\u0131n t\u00fcrbinlenmesi hedefleniyor. Projenin in\u015faat i\u015flemlerinin 24 ayda tamamlanarak 2017 y\u0131l\u0131nda \u00fcretime ge\u00e7ilmesi planlan\u0131yor.<\/p>\n<p>Omala HES ve Karakaya HES santrallerinden senkron jenerat\u00f6rlerden 6,3 kV gerilim seviyesinde \u00fcretilen enerji, \u00fcnite transformat\u00f6rleri vas\u0131tas\u0131 ile 34.5 kV gerilim seviyesine y\u00fckseltildikten sonra 34.5 kV kapal\u0131 \u015falt donan\u0131m\u0131na aktar\u0131l\u0131p \u00f6ncelikle Tokmakkaya HES ve Karakaya HES\u2019den yakla\u015f\u0131k 14 km\u2019lik bir hatla Omala HES\u2019e, buradan \u00fc\u00e7 santralden gelen hatlar birle\u015ftirilerek yakla\u015f\u0131k 7 km lik bir hatla Almus TM\u2019ye ba\u011flanacak.<\/p>\n<p><strong>KIRMA ELEKME YIKAMA TES\u0130S\u0130 VE BETON SANTRAL\u0130 KURULACAK<\/strong><\/p>\n<p>Adsel Elektrik Enerji \u00dcretim A.\u015e. taraf\u0131ndan Omala Baraj\u0131 ve HES \u0130n\u015faat\u0131nda Kullan\u0131lacak Olan K\u0131rma-Eleme- Y\u0131kama Tesisi (kapasite 370.000 ton\/y\u0131l) ve Beton Santrali (Kapasite 90 m\u00b3\/sa) yap\u0131lmas\u0131 planlan\u0131yor. 850 bin TL de\u011ferindeki bu proje ile ilgili de \u00c7ED S\u00fcreci ba\u015flad\u0131.<\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`n\u00fcn internet sitesinde konu ile ilgili yap\u0131lan a\u00e7\u0131klamada, proje ile ilgili \u00c7evresel Etki De\u011ferlendirmesi s\u00fcrecinin ba\u015flad\u0131\u011f\u0131 duyuruldu. \u00c7ED S\u00fcreci tamamlanana kadar s\u00fcre\u00e7 ile ilgili her t\u00fcrl\u00fc bilgiler ve projeye ili\u015fkin g\u00f6r\u00fc\u015f, soru ve \u00f6neriler Tokat Valili\u011fi`ne (\u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc) veya \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131`na g\u00f6nderilebilecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/omala-hes-tokat-sulama-sularini-turbinleyecek_13962.html#.VXavH9Ltmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Adsel Elektrik taraf\u0131ndan Tokat`ta tap\u0131lmas\u0131 planlanan Omala Baraj\u0131 ve HES, Atak\u00f6y HES projesinden b\u0131rak\u0131lan ve Tokat Sulamas\u0131 kapsam\u0131nda kullan\u0131lan sular\u0131n\u0131 t\u00fcrbinleyecek. Adsel Elektrik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40100,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[23361,23363,23365,5927,63,67,1009,2698,165,35370,1090,23364,23362,23360],"views":2282,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40099"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=40099"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40099\/revisions"}],"predecessor-version":[{"id":40101,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40099\/revisions\/40101"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40100"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=40099"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=40099"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=40099"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}