{"id":40074,"date":"2015-06-08T17:26:44","date_gmt":"2015-06-08T14:26:44","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=40074"},"modified":"2015-06-08T17:26:45","modified_gmt":"2015-06-08T14:26:45","slug":"besa-insaat-karamanda-8-mwlik-gunes-enerjisi-santrali-ges-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/besa-insaat-karamanda-8-mwlik-gunes-enerjisi-santrali-ges-kuracak\/","title":{"rendered":"(Turkish) Besa \u0130n\u015faat Karaman`da 8 MW`l\u0131k G\u00fcne\u015f Enerjisi Santrali (GES) Kuracak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/40074\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Besa \u0130n\u015faat taraf\u0131ndan Karaman`da 8MW`l\u0131k G\u00fcne\u015f Enerjisi Santrali (GES) kurulumu yap\u0131lacak. Besa \u0130n\u015faat A.\u015e. taraf\u0131ndan Karaman \u0130li, Merkez \u0130l\u00e7esi, Urgan Mahallesi Mevkii, 166, 167, 168, 174, 175 ve 176 nolu parseller \u00fczerinde 7,95 MW kurulu g\u00fcce sahip `Karaman BESA G\u00fcne\u015f, Enerji Santrali` kurulmas\u0131 ve i\u015fletilmesi planlan\u0131yor.<\/strong><\/p>\n<p>Proje kapsam\u0131nda her biri yakla\u015f\u0131k 1 MW kurulu g\u00fcc\u00fcnde olan 8 adet GES kurulmas\u0131 ve toplam maliyetinin de 25 milyon 200 bin TL olmas\u0131 planlan\u0131yor.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/besa-insaat-karamanda-8-mwlik-gunes-enerjisi-santrali-ges-kuracak.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-40075\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/besa-insaat-karamanda-8-mwlik-gunes-enerjisi-santrali-ges-kuracak-300x198.jpg\" alt=\"besa-insaat-karamanda-8-mwlik-gunes-enerjisi-santrali-ges-kuracak\" width=\"300\" height=\"198\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/besa-insaat-karamanda-8-mwlik-gunes-enerjisi-santrali-ges-kuracak-300x198.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/besa-insaat-karamanda-8-mwlik-gunes-enerjisi-santrali-ges-kuracak-500x331.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/besa-insaat-karamanda-8-mwlik-gunes-enerjisi-santrali-ges-kuracak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/besa-insaat-karamanda-8-mwlik-gunes-enerjisi-santrali-ges-kuracak.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Yine proje kapsam\u0131nda, Karaman BESA GES 1 kapsam\u0131ndaki KARBES 1, 2, 3, 4 GES yat\u0131r\u0131m projelerinin \u00f6ncelikle bitirilmesi, bu yat\u0131r\u0131m\u0131n devreye al\u0131nmas\u0131 ve \u00fcretimin izlenmesinden sonra ise Karaman BESA GES 2 kapsam\u0131ndaki KARBES 5, 6, 7, 8 GES yat\u0131r\u0131m projelerine ba\u015flan\u0131lmas\u0131 ve i\u015fletmeye al\u0131nmas\u0131 planlan\u0131yor.<\/p>\n<p><strong>KAPAS\u0130TE<\/strong><\/p>\n<p>Proje kapsam\u0131nda herbir \u00fcnite i\u00e7in 260 Wp Polikristal G\u00fcne\u015f Panelleri kullan\u0131larak her bir \u00fcnitenin (1144 kWp\/1000 kWe) 1.950.000 kWh\/y\u0131l elektrik \u00fcretmesi \u00f6ng\u00fcr\u00fcl\u00fcyor. Karaman Besa GES-1 projesi kapsam\u0131nda 7.702.000 kWh\/y\u0131l, Karaman Besa GES-2 projesi kapsam\u0131nda ise 7.800.000 kWh\/y\u0131l olmak \u00fczere toplamda 15.502.500 kWh\/y\u0131l elektrik enerjisi elde edilmesi planlan\u0131yor.<\/p>\n<p>Kurulacak trafo tesisi ile de \u00fcretilen elektrik enerjisi 34,5 kV olarak elektrik \u015febekesine verilecek.<\/p>\n<p><strong>PROJEYE \u00c7ED GEREKL\u0130 G\u00d6R\u00dcLMED\u0130<\/strong><\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`n\u00fcn internet sitesinde konu ile ilgili yap\u0131lan a\u00e7\u0131klamada, proje ile ilgili olarak Bakanl\u0131\u011fa sunulan dosyan\u0131n incelenip de\u011ferlendirilerek, Karaman Valili\u011fi taraf\u0131ndan `\u00c7evresel Etki De\u011ferlendirmesi Gerekli De\u011fildir` karar\u0131 verildi\u011fi belirtildi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/besa-insaat-karamanda-8-mwlik-ges-kuracak_13959.html#.VXWqRdLtmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Besa \u0130n\u015faat taraf\u0131ndan Karaman`da 8MW`l\u0131k G\u00fcne\u015f Enerjisi Santrali (GES) kurulumu yap\u0131lacak. Besa \u0130n\u015faat A.\u015e. taraf\u0131ndan Karaman \u0130li, Merkez \u0130l\u00e7esi, Urgan Mahallesi Mevkii, 166, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40075,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[23350,23332,63,67,1009,2698,165,2326,21886,227,13,2569,21768,1679],"views":1614,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40074"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=40074"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40074\/revisions"}],"predecessor-version":[{"id":40076,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40074\/revisions\/40076"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40075"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=40074"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=40074"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=40074"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}