{"id":40062,"date":"2015-06-08T17:07:09","date_gmt":"2015-06-08T14:07:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=40062"},"modified":"2015-06-08T17:07:09","modified_gmt":"2015-06-08T14:07:09","slug":"akkuyu-nukleer-santrali-2016da-vitrine-cikacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-nukleer-santrali-2016da-vitrine-cikacak\/","title":{"rendered":"(Turkish) Akkuyu N\u00fckleer Santrali 2016\u2019da Vitrine \u00c7\u0131kacak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/40062\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #000000;\"><strong>Ruslar, Akkuyu N\u00fckleer Santrali\u2019ne ortak alacak. \u015eirketin Genel M\u00fcd\u00fcr\u00fc Akhundov, \u201c2016\u2019da y\u00fczde 49\u2019u vitrine \u00e7\u0131kar\u0131yoruz\u201d dedi.<\/strong><\/p>\n<p style=\"color: #000000;\">Mersin\u2019de in\u015fa edilecek olan Akkuyu N\u00fckleer Santral projesinde Ruslar, 2016\u2019y\u0131 bekliyor.<span id=\"more-71974\"><\/span>Sabah Gazetesi\u2019nden Kerim \u00dclker\u2019in haberine g\u00f6re, Rus devlet \u015firketi Rosatom\u2019un in\u015fa edece\u011fi Akkuyu N\u00fckleer A.\u015e.\u2019nin Genel M\u00fcd\u00fcr\u00fc Fuad Akhundov, tamam\u0131 Rosatom taraf\u0131ndan yap\u0131lacak olan projede gelecek y\u0131l hisse sat\u0131\u015f\u0131 d\u00fc\u015f\u00fcnd\u00fcklerini s\u00f6yledi. Akhundov, \u201cY\u00fczde 100\u2019\u00fc Rusya\u2019ya ait Akkuyu\u2019da ana hissedar Rosatom olacak.<\/p>\n<p style=\"color: #000000;\">Ama 2016\u2019da plan\u0131m\u0131z y\u00fczde 49\u2019u satmak. T\u00fcrk \u015firketlerinin de olaca\u011f\u0131 uluslararas\u0131 yat\u0131r\u0131mc\u0131lar\u0131n dave<img loading=\"lazy\" class=\"alignright size-medium wp-image-40063\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/akkuyu-nukleer-santrali-2016da-vitrine-cikacak-300x199.jpg\" alt=\"akkuyu-nukleer-santrali-2016da-vitrine-cikacak\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/akkuyu-nukleer-santrali-2016da-vitrine-cikacak-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/akkuyu-nukleer-santrali-2016da-vitrine-cikacak-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/akkuyu-nukleer-santrali-2016da-vitrine-cikacak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/akkuyu-nukleer-santrali-2016da-vitrine-cikacak.jpg 870w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>t edilece\u011fi bir \u00e7al\u0131\u015fma planl\u0131yoruz\u201d diye konu\u015ftu. 4 bin 800 megavat kurulu g\u00fcce sahip olacak Akkuyu N\u00fckleer Santrali yakla\u015f\u0131k 20 milyar dolara mal olacak. Akhundov, \u201cT\u00fcrk \u015firketlerine 6-8 milyar dolarl\u0131k bir i\u015f hacmi yaratacak\u201d dedi. Fuad Akhundov, Rusya\u2019n\u0131n \u015fimdiye kadar 3 milyar dolarl\u0131k bir yat\u0131r\u0131m yapt\u0131\u011f\u0131n\u0131 s\u00f6yledi.<\/p>\n<p style=\"color: #000000;\"><strong>NOVOVORONEJ\u2019DEN G\u00dcVENL\u0130<\/strong><\/p>\n<p style=\"color: #000000;\">Projenin ekipman maliyetinin 1.7 milyar dolar olaca\u011f\u0131n\u0131 s\u00f6yleyen Akhundov, \u201cAkkuyu N\u00fckleer Santrali son nesil teknolojiyle \u00e7al\u0131\u015facak. Bu santral, Rusya\u2019n\u0131n \u015fu ana kadar yapt\u0131\u011f\u0131 en son proje olan Novovoronej N\u00fckleer Santrali\u2019nden daha g\u00fcvenli olacak\u201d diye konu\u015ftu. Akhundov, Akkuyu\u2019da \u00f6zellikle g\u00fcvenlik konusunda \u00e7ok hassas davran\u0131ld\u0131\u011f\u0131n\u0131 dile getirdi. Akhundov, \u201cNovovoronej, 7 b\u00fcy\u00fckl\u00fc\u011f\u00fcnde depreme g\u00f6re yap\u0131ld\u0131. 20 tonluk bir u\u00e7a\u011f\u0131n \u00e7arpmas\u0131 o santralde tehlike olu\u015fturabilir. Ancak Akkuyu\u2019da Fukushima\u2019da ya\u015fananlar\u0131 g\u00f6z \u00f6n\u00fcne alarak daha tedbirli \u00e7al\u0131\u015faca\u011f\u0131z. Akkuyu N\u00fckleer Santrali, 9 b\u00fcy\u00fckl\u00fc\u011f\u00fcnde bir depreme dayan\u0131kl\u0131 bir proje olacak\u201d dedi.<\/p>\n<p style=\"color: #000000;\"><strong>400 TONLUK U\u00c7AK \u00c7ARPSA B\u0130R \u015eEY OLMAYACAK<\/strong><\/p>\n<p style=\"color: #000000;\">Risk analiz \u00e7al\u0131\u015fmas\u0131 yapan Rus \u015firket Rosatom\u2019un ter\u00f6r sald\u0131r\u0131lar\u0131n\u0131 da g\u00f6z \u00f6n\u00fcne ald\u0131\u011f\u0131n\u0131 dile getiren Akhundov, \u201cAkkuyu, 400 ton a\u011f\u0131rl\u0131\u011f\u0131nda bir u\u00e7a\u011f\u0131n \u00e7arpma ihtimalini bile kald\u0131racak g\u00fc\u00e7te. Bu da bir yolcu u\u00e7a\u011f\u0131n\u0131n a\u011f\u0131rl\u0131\u011f\u0131ndan daha fazla\u201d diye konu\u015ftu.<\/p>\n<p style=\"color: #000000;\">Haberin Devam\u0131 i\u00e7in\u00a0<a style=\"color: #c75615;\" href=\"http:\/\/www.sabah.com.tr\/ekonomi\/2015\/06\/08\/akkuyu-2016da-vitrine-cikacak\" target=\"_blank\" rel=\"nofollow\">t\u0131klay\u0131n\u0131z&gt;&gt;&gt;<\/a><\/p>\n<p style=\"color: #000000;\">Kaynak: Sabah<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ruslar, Akkuyu N\u00fckleer Santrali\u2019ne ortak alacak. \u015eirketin Genel M\u00fcd\u00fcr\u00fc Akhundov, \u201c2016\u2019da y\u00fczde 49\u2019u vitrine \u00e7\u0131kar\u0131yoruz\u201d dedi. Mersin\u2019de in\u015fa edilecek olan Akkuyu N\u00fckleer [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40063,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[1026,63,67,1009,2698,165,20869,23345,71,21,3767,3093,2587,885],"views":999,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40062"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=40062"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40062\/revisions"}],"predecessor-version":[{"id":40064,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40062\/revisions\/40064"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40063"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=40062"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=40062"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=40062"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}