{"id":40033,"date":"2015-06-07T15:46:30","date_gmt":"2015-06-07T12:46:30","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=40033"},"modified":"2015-06-07T15:46:30","modified_gmt":"2015-06-07T12:46:30","slug":"trabzona-3394-mwlik-akca-hidro-elektrik-santrali-hes-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/trabzona-3394-mwlik-akca-hidro-elektrik-santrali-hes-kurulacak\/","title":{"rendered":"(Turkish) Trabzon`a 3,394 MW`l\u0131k Ak\u00e7a Hidro Elektrik Santrali (HES) Kurulacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/40033\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kalkavan Enerji, Trabzon`da 3,394 MW kurulu g\u00fcce sahip Ak\u00e7a Hidroelektrik Santrali kuracak.<\/strong><\/p>\n<p>Kalkavan Enerji Elektrik \u00dcretim Ltd. \u015eti. taraf\u0131ndan Trabzon \u0130li, Vakf\u0131kebir \u0130l\u00e7esi, Dereg\u00f6z\u00fc k\u00f6y\u00fc s\u0131n\u0131rlar\u0131 <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/trabzona-3394-mwlik-akca-hidro-elektrik-santrali-hes-kurulacak.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-40034\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/trabzona-3394-mwlik-akca-hidro-elektrik-santrali-hes-kurulacak-300x144.jpg\" alt=\"trabzona-3394-mwlik-akca-hidro-elektrik-santrali-hes-kurulacak\" width=\"300\" height=\"144\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/trabzona-3394-mwlik-akca-hidro-elektrik-santrali-hes-kurulacak-300x144.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/trabzona-3394-mwlik-akca-hidro-elektrik-santrali-hes-kurulacak-500x241.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/trabzona-3394-mwlik-akca-hidro-elektrik-santrali-hes-kurulacak-80x38.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/trabzona-3394-mwlik-akca-hidro-elektrik-santrali-hes-kurulacak.jpg 615w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>i\u00e7inde Kirazl\u0131k deresi \u00fczerinde Ak\u00e7a reg\u00fclat\u00f6r\u00fcn\u00fcn ve hidroelektrik santralinin kurulup i\u015fletilmesi planlan\u0131yor.<\/p>\n<p>Yap\u0131m s\u00fcresi 2 y\u0131l olarak planlanan santralde tahmini y\u0131ll\u0131k ortalama 10.342 GWh ` l\u0131k enerji \u00fcretilmesi \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p><strong>PROJE \u0130LE \u0130LG\u0130L\u0130 \u00c7ED S\u00dcREC\u0130 BA\u015eLADI<\/strong><\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`n\u00fcn internet sitesinde konu ile ilgili yap\u0131lan a\u00e7\u0131klamada, proje ile ilgili \u00c7evresel Etki De\u011ferlendirmesi s\u00fcrecinin ba\u015flad\u0131\u011f\u0131 duyuruldu. \u00c7ED S\u00fcreci tamamlanana kadar s\u00fcre\u00e7 ile ilgili her t\u00fcrl\u00fc bilgiler ve projeye ili\u015fkin g\u00f6r\u00fc\u015f, soru ve \u00f6neriler Trabzon Valili\u011fi`ne (\u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc) veya \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131na g\u00f6nderilebilecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/trabzona-3394-mwlik-akca-hes-kurulacak_13942.html#.VXRBQ9Ltmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kalkavan Enerji, Trabzon`da 3,394 MW kurulu g\u00fcce sahip Ak\u00e7a Hidroelektrik Santrali kuracak. Kalkavan Enerji Elektrik \u00dcretim Ltd. \u015eti. taraf\u0131ndan Trabzon \u0130li, Vakf\u0131kebir \u0130l\u00e7esi, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40034,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[23329,5927,63,67,1009,2698,165,35370,23125,23124,23328,4000],"views":2629,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40033"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=40033"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40033\/revisions"}],"predecessor-version":[{"id":40035,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40033\/revisions\/40035"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40034"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=40033"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=40033"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=40033"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}