{"id":40009,"date":"2015-06-07T15:11:03","date_gmt":"2015-06-07T12:11:03","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=40009"},"modified":"2015-06-07T15:11:03","modified_gmt":"2015-06-07T12:11:03","slug":"milres-prototipinin-haziran-ayinda-devreye-girecegi-bildirildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/milres-prototipinin-haziran-ayinda-devreye-girecegi-bildirildi\/","title":{"rendered":"(Turkish) M\u0130LRES Prototipinin Haziran Ay\u0131nda Devreye Girece\u011fi Bildirildi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/40009\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #444444;\"><strong>2011 y\u0131l\u0131nda ba\u015flat\u0131lan ve tamamen yerli kaynaklar ile 2.5 MW g\u00fcc\u00fcnde bir r\u00fczgar t\u00fcrbini \u00fcretilebilmesinin hedeflendi\u011fi M\u0130LRES projesi ile ilgili bir tan\u0131t\u0131m toplant\u0131s\u0131 ger\u00e7ekle\u015ftirildi.<\/strong><\/p>\n<p style=\"color: #444444;\">Sabanc\u0131 \u00dcniversitesi taraf\u0131ndan yap\u0131lan yaz\u0131l\u0131 a\u00e7\u0131klamada \u0130stanbul Ula\u015f\u0131m A.\u015e. de ger\u00e7ekle\u015ftirilen toplant\u0131ya Bilim Sanayi ve Teknoloji Bakan\u0131\u00a0<strong>Fikri Is\u0327\u0131k<\/strong>, Enerji ve Tabii Kaynaklar Bakan\u0131\u00a0<strong>Taner Y\u0131ld\u0131z<\/strong>, Sabanc\u0131 U\u0308niversitesi Kurucu Mu\u0308tevelli Heyeti Bas\u0327kan\u0131<strong>Gu\u0308ler Sabanc\u0131<\/strong>, Rekto\u0308r\u00a0<strong>Nihat Berker<\/strong>, Mu\u0308hendislik ve Dog\u0306a Bilimleri Faku\u0308ltesi (MDBF) Dekan\u0131\u00a0<strong>Yusuf Mencelog\u0306lu<\/strong>, Aras\u0327t\u0131r<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/milres-prototipinin-haziran-ayinda-devreye-girecegi-bildirildi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-40010\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/milres-prototipinin-haziran-ayinda-devreye-girecegi-bildirildi-300x163.jpg\" alt=\"milres-prototipinin-haziran-ayinda-devreye-girecegi-bildirildi\" width=\"300\" height=\"163\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/milres-prototipinin-haziran-ayinda-devreye-girecegi-bildirildi-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/milres-prototipinin-haziran-ayinda-devreye-girecegi-bildirildi-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/milres-prototipinin-haziran-ayinda-devreye-girecegi-bildirildi.jpg 460w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ma ve Lisansu\u0308stu\u0308 Politikalar Direkto\u0308ru\u0308\u00a0<strong>Volkan O\u0308zgu\u0308z<\/strong>\u2019u\u0308n yan\u0131 s\u0131ra projenin dig\u0306er ortaklar\u0131 TUSAS\u0327\/TAI\u0307, I\u0307stanbul Ulas\u0327\u0131m AS\u0327, TU\u0308BI\u0307TAK MAM ve I\u0307TU\u0308\u2019den yetkililer kat\u0131ld\u0131\u011f\u0131 ve Sabanc\u0131 U\u0308niversitesi MDBF O\u0308g\u0306retim U\u0308yesi ve MI\u0307LRES Proje Yo\u0308neticisi\u00a0<strong>Mahmut Aks\u0327it<\/strong>\u00a0taraf\u0131ndan bir sunum ger\u00e7ekle\u015ftirildi\u011fi bildirildi.<\/p>\n<p style=\"color: #444444;\">Prof. Ak\u015fit taraf\u0131ndan verilen bilgilere g\u00f6re 2011 y\u0131l\u0131n\u0131n Temmuz ay\u0131nda ba\u015flat\u0131lan M\u0130LRES projesi TU\u0308BI\u0307TAK Kamu Kurumlar\u0131 Aras\u0327t\u0131rma ve Gelis\u0327tirme Projeleri Destekleme Program\u0131 (1007 Program\u0131) taraf\u0131ndan tamamen yerli imkanlarla desteklenen, m\u00fc\u015fteri kurumu Enerji ve Tabii Kaynaklar Bakanl\u0131g\u0306\u0131 olan ve 55 milyon TL\u2019lik \u00f6ng\u00f6r\u00fclen b\u00fct\u00e7esi ile ba\u015flad\u0131\u011f\u0131 tarih itibari ile Cumhuriyet tarihinin en b\u00fcy\u00fck b\u00fct\u00e7eli sivil Ar-Ge projesi.<\/p>\n<p style=\"color: #444444;\">2013 y\u0131l\u0131nda bitmesi \u00f6ng\u00f6r\u00fclen ilk a\u015fama i\u00e7in T\u00dcB\u0130TAK taraf\u0131ndan 10 milyon TL\u2019lik b\u00fct\u00e7e ayr\u0131l\u0131rken, daha sonra bu a\u015famaya s\u00fcre eklenerek b\u00fct\u00e7esi 11.5 milyon TL olarak revize edildi. Bu b\u00fct\u00e7enin 3.832.469 TL si Sabanc\u0131 U\u0308niversitesi\u2019nin kullan\u0131m\u0131na tahsis edildi.<\/p>\n<p style=\"color: #444444;\">Projede Sabanc\u0131 U\u0308niversitesi &#8220;Proje Yo\u0308netimi, Mekanik Sistemler&#8221; ana is\u0327 paketinden, TUSAS\u0327\/TAI\u0307 &#8220;Tu\u0308rbin Kanatlar\u0131&#8221; ana is\u0327 paketinden, I\u0307stanbul Ulas\u0327\u0131m AS\u0327 &#8220;Kontrol ve Elektronik Sistemler&#8221; ana is\u0327 paketinden, TU\u0308BI\u0307TAK MAM &#8220;Generato\u0308r ve Elektrik Sistemleri&#8221;, I\u0307stanbul Teknik U\u0308niversitesi ise &#8220;Ru\u0308zgar Analizi ve Yap\u0131 Sistemleri&#8221; ana is\u0327 paketinden sorumlu bulunuyor.<\/p>\n<p style=\"color: #444444;\">Projenin 500 kW\u2019l\u0131k t\u00fcrbin \u00fcretimi hedefleyen birinci as\u0327amas\u0131nda 9 deg\u0306is\u0327ik u\u0308niversiteden ve kurumdan 20\u2019si Sabanc\u0131 U\u0308niversitesi\u2019nden olmak u\u0308zere 98 aras\u0327t\u0131rmac\u0131 ile 13\u2019u\u0308 Sabanc\u0131 U\u0308niversitesi\u2019nden olmak u\u0308zere 23 lisansu\u0308stu\u0308 o\u0308g\u0306renci go\u0308rev al\u0131yor.<\/p>\n<p style=\"color: #444444;\">A\u00e7\u0131klamaya g\u00f6re projenin bu a\u015famas\u0131nda gerekli tu\u0308m biles\u0327enlerin u\u0308retimi, montajlar\u0131 ve yer testleri tamamlan\u0131rken, Haziran ay\u0131 i\u00e7inde 500 kW g\u00fcc\u00fcnde olacak ilk prototip t\u00fcrbinin kurulumunun Terkos go\u0308lu\u0308nu\u0308n k\u0131y\u0131s\u0131ndaki I\u0307SKI\u0307 tesislerinin arazisinde ger\u00e7ekle\u015ftirilmesi planlan\u0131yor.<\/p>\n<p style=\"color: #444444;\">Projenin birinci a\u015famas\u0131n\u0131n ba\u015far\u0131l\u0131 \u015fekilde sonu\u00e7lanmas\u0131n\u0131n ard\u0131ndan, 2.5 MW g\u00fcc\u00fcnde t\u00fcrbin \u00fcretimini hedefleyen ikinci a\u015famaya ge\u00e7ilecek.<\/p>\n<p style=\"color: #444444;\">Toplant\u0131da konu\u015fan Bilim, Sanayi ve Teknoloji Bakan\u0131 Fikri I\u015f\u0131k projenin ba\u015far\u0131ya ula\u015fmas\u0131 ile 15 milyar dolarl\u0131k bir d\u00f6vizin T\u00fcrkiye\u2019de kalmas\u0131n\u0131n sa\u011flanaca\u011f\u0131 ve proje ile do\u011frudan 100 bin, dolayl\u0131 olarak ise 250 bin ki\u015filik istihdam sa\u011flanaca\u011f\u0131n\u0131 s\u00f6yledi.<\/p>\n<p style=\"color: #444444;\">Enerji ve Tabii Kaynaklar Bakan\u0131 Taner Y\u0131ld\u0131z ise \u015funlar\u0131 kaydetti; &#8220;Bir trakto\u0308r yaklas\u0327\u0131k 5 bin parc\u0327adan, binek araba 10 bin 200 civar\u0131nda parc\u0327adan, nu\u0308kleer gu\u0308c\u0327 santrali ise 515 bin parc\u0327adan olus\u0327uyor. Bunlar\u0131n hepsini biz yapacag\u0306\u0131z. I\u0307sterse 10 y\u0131l, isterse 20 y\u0131l su\u0308rsu\u0308n ama sonuc\u0327ta bir genc\u0327 kardes\u0327im bizim yas\u0327lar\u0131m\u0131za geldig\u0306inde art\u0131k bu\u0308tu\u0308n bunlar\u0131n hepsi yerli kaynaklardan yap\u0131lm\u0131s\u0327 olacak.&#8221;<\/p>\n<p style=\"color: #444444;\">Kaynak: Ye\u015fil Ekonomi<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 2011 y\u0131l\u0131nda ba\u015flat\u0131lan ve tamamen yerli kaynaklar ile 2.5 MW g\u00fcc\u00fcnde bir r\u00fczgar t\u00fcrbini \u00fcretilebilmesinin hedeflendi\u011fi M\u0130LRES projesi ile ilgili bir tan\u0131t\u0131m [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40010,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[63,67,1009,2698,165,2772,69,16,23318,4784,324],"views":657,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40009"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=40009"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40009\/revisions"}],"predecessor-version":[{"id":40011,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40009\/revisions\/40011"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40010"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=40009"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=40009"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=40009"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}