{"id":39851,"date":"2015-06-03T13:35:31","date_gmt":"2015-06-03T10:35:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=39851"},"modified":"2015-06-03T13:35:44","modified_gmt":"2015-06-03T10:35:44","slug":"turkiye-gurcistan-elektrik-enterkonneksiyonuna-bakanlar-kurulundan-onay","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiye-gurcistan-elektrik-enterkonneksiyonuna-bakanlar-kurulundan-onay\/","title":{"rendered":"(Turkish) T\u00fcrkiye-G\u00fcrcistan Elektrik Enterkonneksiyonuna Bakanlar Kurulu\u2019ndan Onay!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/39851\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #000000;\"><strong>T\u00fcrkiye ile G\u00fcrcistan aras\u0131nda elektrik enterkonneksiyonlar\u0131n\u0131n geli\u015ftirilmesi i\u00e7in imzalanan mutabakat zapt\u0131 Bakanlar Kurulu taraf\u0131ndan onayland\u0131.<\/strong><\/p>\n<p style=\"color: #000000;\">Mutabakat Zapt\u0131\u2019n\u0131n onay\u0131na ili\u015fkin<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/turkiye-gurcistan-elektrik-enterkonneksiyonuna-bakanlar-kurulundan-onay.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-39852\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/turkiye-gurcistan-elektrik-enterkonneksiyonuna-bakanlar-kurulundan-onay-300x200.jpg\" alt=\"turkiye-gurcistan-elektrik-enterkonneksiyonuna-bakanlar-kurulundan-onay\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/turkiye-gurcistan-elektrik-enterkonneksiyonuna-bakanlar-kurulundan-onay-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/turkiye-gurcistan-elektrik-enterkonneksiyonuna-bakanlar-kurulundan-onay-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/turkiye-gurcistan-elektrik-enterkonneksiyonuna-bakanlar-kurulundan-onay-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/turkiye-gurcistan-elektrik-enterkonneksiyonuna-bakanlar-kurulundan-onay.jpg 870w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> Bakanlar Kurulu Karar\u0131, Resmi Gazete\u2019de\u00a0yay\u0131mland\u0131.<span id=\"more-71908\"><\/span><\/p>\n<p style=\"color: #000000;\">Buna g\u00f6re, Bakanlar Kurulu, 29 Temmuz 2009\u2019da Ankara\u2019da imzalanan, \u201cT\u00fcrkiye Cumhuriyeti Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 ve G\u00fcrcistan Enerji Bakanl\u0131\u011f\u0131 Aras\u0131nda T\u00fcrkiye-G\u00fcrcistan Elektrik Enterkonneksiyonlar\u0131n\u0131n Geli\u015ftirilmesi Hakk\u0131nda Mutabakat Zapt\u0131\u201dn\u0131 onaylad\u0131.<\/p>\n<p style=\"color: #000000;\">Mutabakat zapt\u0131na g\u00f6re, taraflar iki \u00fclke aras\u0131nda kurulacak iletim hatt\u0131 \u00fczerinden \u00f6nce net 650 megavat kapasiteye kadar enerji transfer edecek. Daha sonra bu transfer \u00fclkelerin enerji talebinin geli\u015fimine g\u00f6re bin megavata \u00e7\u0131kar\u0131lacak.<\/p>\n<p style=\"color: #000000;\">Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye ile G\u00fcrcistan aras\u0131nda elektrik enterkonneksiyonlar\u0131n\u0131n geli\u015ftirilmesi i\u00e7in imzalanan mutabakat zapt\u0131 Bakanlar Kurulu taraf\u0131ndan onayland\u0131. Mutabakat Zapt\u0131\u2019n\u0131n onay\u0131na ili\u015fkin Bakanlar Kurulu Karar\u0131, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":39852,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[15745,68,61,23215,63,67,1009,2698,165,988,1972,15746,1388,13260],"views":835,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39851"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=39851"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39851\/revisions"}],"predecessor-version":[{"id":39854,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39851\/revisions\/39854"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/39852"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=39851"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=39851"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=39851"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}