{"id":39782,"date":"2015-06-01T14:35:38","date_gmt":"2015-06-01T11:35:38","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=39782"},"modified":"2015-06-01T14:36:29","modified_gmt":"2015-06-01T11:36:29","slug":"harmanlik-koru-ve-mut-ruzgar-enerjisi-santrali-res-artik-uretimde","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/harmanlik-koru-ve-mut-ruzgar-enerjisi-santrali-res-artik-uretimde\/","title":{"rendered":"(Turkish) Harmanl\u0131k, Koru ve Mut R\u00fczgar Enerjisi Santrali (RES) Art\u0131k \u00dcretimde!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/39782\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Borusan EnBW Enerji, toplam 158.4 MW`lik Harmanl\u0131k, Koru ve Mut r\u00fczgar enerjisi santrallerini (RES) devreye ald\u0131.<\/strong><\/p>\n<p>Borusan EnBW Enerji\u2019nin yat\u0131r\u0131m\u0131n\u0131 tamamlad\u0131\u011f\u0131, toplam 158.4 MW`lik \u00fc\u00e7 \u00f6nemli r\u00fczg\u00e2r en<img loading=\"lazy\" class=\"alignleft wp-image-39783 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/harmanlik-koru-ve-mut-ruzgar-enerjisi-santrali-res-artik-uretimde-300x174.jpg\" alt=\"harmanlik-koru-ve-mut-ruzgar-enerjisi-santrali-res-artik-uretimde\" width=\"300\" height=\"174\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/harmanlik-koru-ve-mut-ruzgar-enerjisi-santrali-res-artik-uretimde-300x174.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/harmanlik-koru-ve-mut-ruzgar-enerjisi-santrali-res-artik-uretimde-500x290.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/harmanlik-koru-ve-mut-ruzgar-enerjisi-santrali-res-artik-uretimde-80x46.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/harmanlik-koru-ve-mut-ruzgar-enerjisi-santrali-res-artik-uretimde.jpg 600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>erjisi santrali (RES) daha faaliyete ge\u00e7ti. S\u00f6z konusu RES`lerden ikisi y\u00fczde 100, biri de k\u0131smen \u00fcretimde&#8230;<\/p>\n<p><strong>HARMANLIK VE KORU TAM KAPAS\u0130TE DEVREDE<\/strong><\/p>\n<p>Bakanl\u0131k ge\u00e7ici kabulleri tamamlanan Harmanl\u0131k RES toplam 50 MWe\u2019l\u0131k kurulu g\u00fcc\u00fcyle 6 May\u0131s 2015`te resmi olarak ticari i\u015fletmeye al\u0131nd\u0131. Koru RES de bakanl\u0131k ge\u00e7ici kabullerinin ard\u0131ndan 23 May\u0131s 2015 itibariyle toplam 50 MWe\u2019l\u0131k kurulu g\u00fcc\u00fcyle ticari i\u015fletmeye ge\u00e7ti.<\/p>\n<p><strong>MUT RES KISMEN \u00dcRET\u0130ME GE\u00c7T\u0130<\/strong><\/p>\n<p>Toplam 50 MW kurulu g\u00fcce sahip Mut RES\u2019in ise ilk 6 t\u00fcrbini kapsayan 19.8 MWe`lik k\u0131sm\u0131 bakanl\u0131k ge\u00e7ici kabul\u00fcn\u00fcn ard\u0131ndan 23 May\u0131s 2015`te ticari \u00fcretime ba\u015flad\u0131. K\u0131sa zamanda tesisin tamam\u0131n\u0131n (50 MWe) devreye al\u0131nmas\u0131 planlan\u0131yor.<\/p>\n<p>Haberin <a href=\"http:\/\/enerjigunlugu.net\/harmanlik-koru-ve-mut-res-uretimde_13865.html#.VWxHa9Ltmko\" target=\"_blank\" rel=\"nofollow\">Devam\u0131 \u0130\u00e7in TIKLAYIN&gt;&gt;&gt;<\/a><\/p>\n<p>Kaynak: Enerji G\u00fcnl\u00fc\u011f\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Borusan EnBW Enerji, toplam 158.4 MW`lik Harmanl\u0131k, Koru ve Mut r\u00fczgar enerjisi santrallerini (RES) devreye ald\u0131. Borusan EnBW Enerji\u2019nin yat\u0131r\u0131m\u0131n\u0131 tamamlad\u0131\u011f\u0131, toplam 158.4 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":39783,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[829,14225,1556,63,67,1009,2698,165,23160,23161,23162,22653,69,16,231,22631,105,5844],"views":1607,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39782"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=39782"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39782\/revisions"}],"predecessor-version":[{"id":39785,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39782\/revisions\/39785"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/39783"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=39782"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=39782"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=39782"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}