{"id":39746,"date":"2015-05-31T21:41:15","date_gmt":"2015-05-31T18:41:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=39746"},"modified":"2015-05-31T21:41:15","modified_gmt":"2015-05-31T18:41:15","slug":"ruzgar-enerjisinde-yeni-projeler-hizla-hayata-gecebilecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ruzgar-enerjisinde-yeni-projeler-hizla-hayata-gecebilecek\/","title":{"rendered":"(Turkish) &#8221;R\u00fczgar Enerjisinde Yeni Projeler H\u0131zla Hayata Ge\u00e7ebilecek!&#8221;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/39746\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye R\u00fczgar Enerjisi Birli\u011fi (T\u00dcREB) Ba\u015fkan\u0131 Mustafa Serdar Ataseven yeni geli\u015fmeler sayesinde T\u00fcrkiye r\u00fczgar enerjisi sekt\u00f6r\u00fcn\u00fcn stabil hale gelerek yat\u0131r\u0131m yap\u0131labilir projelerin h\u0131zla hayata ge\u00e7ebilece\u011fini kaydetti.<\/strong><\/p>\n<p>T\u00dcREB taraf\u0131ndan yap\u0131lan yaz\u0131l\u0131 a\u00e7\u0131klama de\u011ferlendirmeleri yer alan Ataseven yeni r\u00fczgar enerjisi yat\u0131r\u0131mlar\u0131 i\u00e7in 7 y\u0131ld\u0131r yat\u0131r\u0131m izni ba\u015fvurusu al\u0131nmad\u0131\u011f\u0131n\u0131 hat\u0131rlat\u0131rken, Enerji Piyasas\u0131 D\u00fczenleme Kurumu (EPDK) taraf\u0131ndan nisan ay\u0131n\u0131n so<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/ruzgar-enerjisinde-yeni-projeler-hizla-hayata-gecebilecek.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-39747\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/ruzgar-enerjisinde-yeni-projeler-hizla-hayata-gecebilecek-300x163.jpg\" alt=\"ruzgar-enerjisinde-yeni-projeler-hizla-hayata-gecebilecek\" width=\"300\" height=\"163\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/ruzgar-enerjisinde-yeni-projeler-hizla-hayata-gecebilecek-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/ruzgar-enerjisinde-yeni-projeler-hizla-hayata-gecebilecek-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/ruzgar-enerjisinde-yeni-projeler-hizla-hayata-gecebilecek.jpg 460w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>n haftas\u0131nda, 3.000 MW\u2019l\u0131k \u00fcst s\u0131n\u0131r ile ger\u00e7ekle\u015ftirilen ba\u015fvuru s\u00fcrecinde ise yat\u0131r\u0131mc\u0131lar\u0131n toplam kurulu g\u00fc\u00e7leri 42.273,65 MW olacak 1.096 adet proje ba\u015fvurusu yapt\u0131\u011f\u0131n\u0131n alt\u0131n\u0131 \u00e7izdi.<\/p>\n<p>Mustafa Serdar Ataseven bu d\u00f6nem i\u00e7erisinde r\u00fczgar enerjisi yat\u0131r\u0131mc\u0131lar\u0131n\u0131n tecr\u00fcbe kazan\u0131rken, kamu taraf\u0131n\u0131n ise sekt\u00f6re destek olmak ad\u0131na yasal d\u00fczenlemeleri revize etti\u011fini bu sayede yat\u0131r\u0131mc\u0131lar\u0131n \u00f6n\u00fcnde halen izin s\u00fcre\u00e7leri ve har\u00e7lar ile ilgili s\u0131k\u0131nt\u0131lar bulunsa da sekt\u00f6rdeki bir \u00e7ok sorunun \u00e7\u00f6z\u00fcld\u00fc\u011f\u00fcn\u00fc ifade etti.<\/p>\n<p>T\u00dcREB Ba\u015fkan\u0131\u2019na g\u00f6re TE\u0130A\u015e taraf\u0131ndan may\u0131s ay\u0131n\u0131n ba\u015f\u0131nda a\u00e7\u0131klanan 2.000 MW\u2019l\u0131k yeni kapasite T\u00fcrkiye\u2019de s\u00fcrd\u00fcr\u00fclebilir bir r\u00fczgar enerjisi sekt\u00f6r\u00fc oldu\u011funu vurgularken, EPDK\u2019n\u0131n bu yeni kapasite i\u00e7in d\u00fczenli bir \u015fekilde ba\u015fvuru almas\u0131 ve Yenilenebilir Enerji Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc\u2019n\u00fcn de teknik incelemeleri k\u0131sa s\u00fcrede yapmas\u0131 halinde y\u00fcksek bedeller ile lisans alma s\u00fcreci sona erecek. Bu durum ise r\u00fczgar enerjisi sekt\u00f6r\u00fcndeki lisans ticaretinin kalkmas\u0131n\u0131 ve daha net bir \u015fekilde ortaya \u00e7\u0131kacak yat\u0131r\u0131m s\u00fcreci ve olu\u015facak g\u00fcven ortam\u0131nda yat\u0131r\u0131m yap\u0131labilir projelerin h\u0131zl\u0131 bir \u015fekilde hayata ge\u00e7mesini sa\u011flayacak.<\/p>\n<p>2005 y\u0131l\u0131 sonunda 20,01 MW kurulu g\u00fcce sahip olan T\u00fcrkiye r\u00fczgar enerjisi sekt\u00f6r\u00fc ge\u00e7en y\u0131l ger\u00e7ekle\u015fen 803,65 MW\u2019l\u0131k yeni kurulu g\u00fc\u00e7 art\u0131\u015f\u0131 ile\u00a0 2015\u2019e 3.762,10 MW\u2019l\u0131k g\u00fc\u00e7 ile girmi\u015fti.<\/p>\n<p>Kaynak: Ye\u015fil Ekonomi<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye R\u00fczgar Enerjisi Birli\u011fi (T\u00dcREB) Ba\u015fkan\u0131 Mustafa Serdar Ataseven yeni geli\u015fmeler sayesinde T\u00fcrkiye r\u00fczgar enerjisi sekt\u00f6r\u00fcn\u00fcn stabil hale gelerek yat\u0131r\u0131m yap\u0131labilir projelerin h\u0131zla [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":39747,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[63,67,1009,2698,165,3388,474,3563,69,16,231,23137,430,1682,3390],"views":714,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39746"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=39746"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39746\/revisions"}],"predecessor-version":[{"id":39748,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39746\/revisions\/39748"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/39747"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=39746"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=39746"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=39746"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}