{"id":39738,"date":"2015-05-30T14:35:07","date_gmt":"2015-05-30T11:35:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=39738"},"modified":"2015-05-30T14:35:07","modified_gmt":"2015-05-30T11:35:07","slug":"akkuyudan-cek-cumhuriyetine-nukleer-ziyareti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyudan-cek-cumhuriyetine-nukleer-ziyareti\/","title":{"rendered":"(Turkish) Akkuyu`dan \u00c7ek Cumhuriyeti`ne N\u00fckleer Ziyareti!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/39738\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u00c7ek Cumhuriyeti`nde bulunan Temelin N\u00fckleer Santrali\u2019nin (NGS) kap\u0131lar\u0131 ilk kez T\u00fcrkiye\u2019den gelen bir heyete a\u00e7\u0131ld\u0131. Avrupa\u2019n\u0131n en \u00f6nemli enerji \u015firketlerinden biri olan CEZ Grup\u2019a ait Rus tasar\u0131ml\u0131 Temelin N\u00fckleer Santrali\u2019nin (NGS) kap\u0131lar\u0131 ilk kez T\u00fcrkiye\u2019den gelen bir heyete a\u00e7\u0131ld\u0131.<\/strong><\/p>\n<p>Akkuyu N\u00fckleer yetkilileri ve T\u00fcrk gazetecilerin yer ald\u0131\u011f\u0131 heyete acil durum kontrol odas\u0131, sim\u00fclasyon odas\u0131, korumal\u0131 b\u00f6lge, reakt\u00f6r binas\u0131, t\u00fcrbin binalar\u0131 ve so\u011futma kulesi gezdirildi. Bu gezi s\u0131ras\u0131nda, normal zamanlarda giri\u015f iz<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/akkuyudan-cek-cumhuriyetine-nukleer-ziyareti.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-39739\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/akkuyudan-cek-cumhuriyetine-nukleer-ziyareti-300x191.jpg\" alt=\"akkuyudan-cek-cumhuriyetine-nukleer-ziyareti\" width=\"300\" height=\"191\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/akkuyudan-cek-cumhuriyetine-nukleer-ziyareti-300x191.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/akkuyudan-cek-cumhuriyetine-nukleer-ziyareti-78x50.jpg 78w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/akkuyudan-cek-cumhuriyetine-nukleer-ziyareti.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ni verilmeyen b\u00f6l\u00fcmler \u00f6zellikle T\u00fcrk gazeteciler i\u00e7in a\u00e7\u0131ld\u0131. Santralin kalbi olarak bilinen \u201ckorumal\u0131 b\u00f6lge\u201dyi de gezen T\u00fcrk gazeteciler y\u0131lda bir defa ger\u00e7ekle\u015ftirilen yak\u0131t de\u011fi\u015fimi olay\u0131n\u0131 izleme \u015fans\u0131na sahip oldu.<\/p>\n<p>Gazetecilere korumal\u0131 b\u00f6lgeye girerken dozimetre (radyasyon \u00f6l\u00e7\u00fcm cihaz\u0131) verildi. Gezi s\u0131ras\u0131nda bu dozimetrelerdeherhangi bir art\u0131\u015f\u0131n olmad\u0131\u011f\u0131 da g\u00f6r\u00fcld\u00fc. Gezinin ilgin\u00e7 anlar\u0131ndan biri de so\u011futma kulesine ger\u00e7ekle\u015ftirilen turdu. So\u011futma kulesinin i\u00e7ine girme imkan\u0131da bulan gazeteciler, daha \u00f6nce buradan \u00e7\u0131kan\u0131n duman oldu\u011funu d\u00fc\u015f\u00fcnd\u00fcklerini ancak su buhar\u0131 ile kar\u015f\u0131la\u015f\u0131nca \u015fa\u015f\u0131rd\u0131klar\u0131n\u0131 ifade ettiler.<\/p>\n<p>Gezinin ard\u0131ndan Temelin NGS N\u00fckleer Enerji \u0130leti\u015fim M\u00fcd\u00fcr\u00fc PetrSuler, \u00c7ek Cumhuriyeti\u2019nde bulunan Dukovany NGS ve Temelin NGS\u2019nin sahibi ve i\u015fletmecisi olan \u00c7ek enerji devi CEZ \u015eirketi hakk\u0131nda detayl\u0131 bir sunum yapt\u0131. CEZ Grup\u2019un Orta Avrupa ve Do\u011fu \u00fclkelerinde g\u00fc\u00e7l\u00fc bir konuma sahip uluslararas\u0131 bir kamu \u015firketi oldu\u011funu belirten Suler, CEZ Grub\u2019un Polonya,T\u00fcrkiye, Romanya ve Bulgaristan\u2019da elektrik santralleri in\u015fa etti\u011fini s\u00f6yledi.Ayr\u0131ca \u015firketlerinin kurulu g\u00fc\u00e7 ve m\u00fc\u015fteri say\u0131s\u0131 a\u00e7\u0131s\u0131ndan Avrupa`n\u0131n en b\u00fcy\u00fck 10 enerji \u015firketi aras\u0131nda yer ald\u0131\u011f\u0131n\u0131 kaydetti. Suler, \u015fu anda \u00c7ek Cumhuriyeti\u2019nde Rus tasar\u0131m\u0131na g\u00f6re \u00e7al\u0131\u015fan Dukovany NGS (VVER-440 teknolojisine sahip 4 \u00fcnite) ve Temelin NGS (VVER-1000 teknolojisine sahip 2 \u00fcnite) olmak \u00fczere toplam 2 n\u00fckleer g\u00fc\u00e7 santralinin faaliyet g\u00f6sterdi\u011fini ve bu iki santralin \u00fclkenin elektrik ihtiyac\u0131n\u0131n yakla\u015f\u0131k %40\u2019\u0131n\u0131 kar\u015f\u0131lad\u0131\u011f\u0131n\u0131 s\u00f6yledi.<\/p>\n<p><strong>&#8220;RUS TASARIMLARI G\u00dcVEN\u0130L\u0130R&#8221;<\/strong><\/p>\n<p>Suler, Temelin N\u00fckleer Santrali\u2019nin Avrupa Birli\u011fi\u2019nin t\u00fcm stres testlerinden ba\u015far\u0131yla ge\u00e7ti\u011fine dikkat \u00e7ekerek, \u201cTemelin d\u00fcnyan\u0131n en g\u00fcvenli n\u00fckleer santrallerinden biri ve santralle ilgili gerekli kurum ve kurulu\u015flara s\u00fcrekli rapor veriliyor. Ayr\u0131ca \u015fu an 2 \u00fcnitesi bulunan Temelin NGS\u2019nin geni\u015fletilmesi planlan\u0131yor\u201d dedi.Suler daha sonra konu\u015fmas\u0131na \u015f\u00f6yle devam etti:<\/p>\n<p>\u201cSantralde g\u00fcvenlik k\u00fclt\u00fcr\u00fcn\u00fcn olu\u015fturulmas\u0131 \u015fart, s\u00fcrekli denetimler yap\u0131lmak zorunda. Ba\u011f\u0131ms\u0131z uzmanlar ve Avrupa Birli\u011fi\u2019nin yapt\u0131\u011f\u0131 stres testlerinden ba\u015far\u0131yla \u00e7\u0131kt\u0131k. Santralimizin g\u00fcvenli oldu\u011funa ili\u015fkin bir karar al\u0131nd\u0131. G\u00fcvenlik bizim i\u00e7in olmazsa olmaz. Temelin NGS Avrupa Birli\u011fi standartlar\u0131na uymak zorunda. Temelin NGS\u2019ninbulundu\u011fu b\u00f6lge tsunamive deprem b\u00f6lgesi olmamas\u0131na ra\u011fmen biz santrali herhangi bir tsunami etkisine ve depreme kar\u015f\u0131 da dayan\u0131kl\u0131 olarak dizayn etmek zorunday\u0131z. Rus tasar\u0131m\u0131 santraller \u00f6zellikle Fuku\u015fima kazas\u0131ndan sonra en dayan\u0131kl\u0131 n\u00fckleer santraller se\u00e7ildi.\u201d<\/p>\n<p>Temelin NGS\u2019de radyasyondan korunma sonu\u00e7lar\u0131n\u0131n d\u00fcnya ortalamas\u0131ndan 8 kat daha iyi oldu\u011funun alt\u0131n\u0131 \u00e7izen PetrSuler, Fuku\u015fima kazas\u0131ndan sonra g\u00fcvenlik konusunda iyile\u015ftirilmeler yap\u0131ld\u0131\u011f\u0131n\u0131 ve santralde ek g\u00fcvenlik \u00f6nlemlerinin al\u0131nd\u0131\u011f\u0131n\u0131 anlatt\u0131. Temelin NGS Bilgilendirme Merkezi hakk\u0131nda da bilgi veren Suler, merkezi her y\u0131l yakla\u015f\u0131k 30.000 ki\u015finin ziyaret etti\u011fini ve bunlardan %6\u2019s\u0131n\u0131n yabanc\u0131 oldu\u011funu a\u00e7\u0131klad\u0131.<\/p>\n<p>T\u00fcrk gazetecilerden gelen sorulara da cevap veren PetrSuler, \u201cyak\u0131t\u0131 nereden temin ettiklerine\u201d dair soru \u00fczerine, \u201cSar\u0131 pastay\u0131 (uranyumun i\u015flem g\u00f6rm\u00fc\u015f hali)\u00fclkemizden ya da Kazakistan ve Avusturalya\u2019dan al\u0131yoruz. Ancak bunun yak\u0131t demetleri haline getirebilmesi i\u00e7in Rus n\u00fckleer yak\u0131t \u015firketi TVEL\u2019e g\u00f6nderiyoruz\u201d dedi. Gazetecilerden gelen di\u011fer bir soruda santral kurulmadan \u00f6nce ve sonra b\u00f6lgenin de\u011fi\u015fimine ili\u015fkin oldu. Suler, santral kurulmadan \u00f6nce de o b\u00f6lgede yo\u011fun bir n\u00fcfusun oldu\u011funu ancak kurulduktan sonra santralde \u00e7al\u0131\u015fanlarla birlikte n\u00fcfusun daha da artt\u0131\u011f\u0131n\u0131 ve geli\u015fmenin ivme kazand\u0131\u011f\u0131n\u0131 vurgulad\u0131.<\/p>\n<p><strong>\u00c7EK HEYET AKKUYU`YU GE\u00c7EN YIL Z\u0130YARET ETM\u0130\u015eT\u0130<\/strong><\/p>\n<p>\u00c7ek Cumhuriyeti\u2019nin farkl\u0131 b\u00f6lgelerinde ya\u015fayan belediye ba\u015fkanlar\u0131, yerel y\u00f6neticiler, b\u00fcrokratlar, i\u015f\u00e7iler ve sivil toplum \u00f6rg\u00fct\u00fc \u00fcyeleri ile gazetecilerden olu\u015fan bir heyet, ge\u00e7en y\u0131l Akkuyu N\u00fckleer Santral Projesi\u2019ne ili\u015fkin \u00e7al\u0131\u015fmalar\u0131 yerinde g\u00f6rmek i\u00e7in Mersin\u2019e gelmi\u015fti. Heyet ilk olarak Akkuyu N\u00fckleer A.\u015e Mersin Bilgilendirme Merkezi\u2019ni ziyaret etmi\u015fti.<\/p>\n<p>Bilgilendirme Merkezi\u2019ndeki maketler, bilgilendirme panolar\u0131 ve haz\u0131rlanan di\u011fer d\u00fczenekler e\u015fli\u011finde proje hakk\u0131nda bilgilendirilen heyet \u00fcyeleri daha sonra G\u00fclnar \u0130l\u00e7esi\u2019ne ge\u00e7mi\u015fti. B\u00fcy\u00fckeceli Mahallesi\u2019nde bulunan Bilgilendirme Merkezi\u2019nde kat\u0131l\u0131mc\u0131lara, merkez faaliyetleri hakk\u0131nda bilgilendirme yap\u0131lm\u0131\u015ft\u0131. Heyet son olarak Akkuyu NGS Sahas\u0131\u2019n\u0131 ziyaret etmi\u015f, burada Saha Ba\u015f M\u00fchendisi MichailCherdantsev taraf\u0131ndan projeye ili\u015fkin yap\u0131lan sunumu dinlemi\u015fti.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/akkuyudan-cek-cumhuriyetine-nukleer-ziyareti_13817.html#.VWmkmtLtmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00c7ek Cumhuriyeti`nde bulunan Temelin N\u00fckleer Santrali\u2019nin (NGS) kap\u0131lar\u0131 ilk kez T\u00fcrkiye\u2019den gelen bir heyete a\u00e7\u0131ld\u0131. Avrupa\u2019n\u0131n en \u00f6nemli enerji \u015firketlerinden biri olan CEZ [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":39739,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[13600,63,67,1009,2698,165,71,21,23134,9517,19356,23135,9965],"views":958,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39738"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=39738"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39738\/revisions"}],"predecessor-version":[{"id":39740,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39738\/revisions\/39740"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/39739"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=39738"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=39738"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=39738"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}