{"id":39735,"date":"2015-05-30T14:29:57","date_gmt":"2015-05-30T11:29:57","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=39735"},"modified":"2015-05-30T14:29:57","modified_gmt":"2015-05-30T11:29:57","slug":"anadolu-grubundan-gurcistana-hes-yatirimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/anadolu-grubundan-gurcistana-hes-yatirimi\/","title":{"rendered":"(Turkish) Anadolu Grubu`ndan G\u00fcrcistan`a HES Yat\u0131r\u0131m\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/39735\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Anadolu Grubu, G\u00fcr<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/anadolu-grubundan-gurcistana-hes-yatirimi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-39736\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/anadolu-grubundan-gurcistana-hes-yatirimi-300x144.jpg\" alt=\"anadolu-grubundan-gurcistana-hes-yatirimi\" width=\"300\" height=\"144\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/anadolu-grubundan-gurcistana-hes-yatirimi-300x144.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/anadolu-grubundan-gurcistana-hes-yatirimi-500x241.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/anadolu-grubundan-gurcistana-hes-yatirimi-80x38.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/anadolu-grubundan-gurcistana-hes-yatirimi.jpg 615w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>cistan`a yakla\u015f\u0131k 100 milyon dolarl\u0131k Hidroelektrik Santrali yat\u0131r\u0131m\u0131 yapacak.<\/strong><\/p>\n<p>Anadolu Grubu ile G\u00fcrcistan Enerji Bakanl\u0131\u011f\u0131 aras\u0131nda Kheledula 3 Hidroelektrik Santrali`ne ili\u015fkin yakla\u015f\u0131k 100 milyon dolarl\u0131k anla\u015fma imzaland\u0131.<\/p>\n<p>Kheledula 3 santrali y\u0131ll\u0131k yakla\u015f\u0131k 232,8milyon kilovatsaat (kWh) elektrik \u00fcretim kapasitesinde olacak.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/anadolu-grubundan-gurcistana-hes-yatirimi_13846.html#.VWmjhNLtmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Anadolu Grubu, G\u00fcrcistan`a yakla\u015f\u0131k 100 milyon dolarl\u0131k Hidroelektrik Santrali yat\u0131r\u0131m\u0131 yapacak. Anadolu Grubu ile G\u00fcrcistan Enerji Bakanl\u0131\u011f\u0131 aras\u0131nda Kheledula 3 Hidroelektrik Santrali`ne ili\u015fkin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":39736,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[5052,63,67,1009,2698,165,3405,35370,23125,1090,23124],"views":1306,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39735"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=39735"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39735\/revisions"}],"predecessor-version":[{"id":39737,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39735\/revisions\/39737"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/39736"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=39735"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=39735"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=39735"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}