{"id":39722,"date":"2015-05-30T14:09:54","date_gmt":"2015-05-30T11:09:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=39722"},"modified":"2015-05-30T14:09:54","modified_gmt":"2015-05-30T11:09:54","slug":"baydar-elektrik-giresunda-hes-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/baydar-elektrik-giresunda-hes-kuracak\/","title":{"rendered":"(Turkish) Baydar Elektrik Giresun`da HES Kuracak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/39722\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Baydar Elektrik, Giresun Avutmu\u015f \u00c7ay\u0131 \u00fczerinde 8.52 MW`l\u0131k \u0130limsu I-II Baraj\u0131 Ve HES kuracak.<\/strong><\/p>\n<p>Baydar Elektrik \u00dcretim San. ve Tic. Ltd. \u015eti. taraf\u0131ndan Giresun \u0130li, Alucra \u0130l\u00e7esi, Avutmu\u015f \u00c7ay\u0131 \u00fczerinde<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/baydar-elektrik-giresunda-hes-kuracak.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-39723 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/baydar-elektrik-giresunda-hes-kuracak-300x162.jpg\" alt=\"baydar-elektrik-giresunda-hes-kuracak\" width=\"300\" height=\"162\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/baydar-elektrik-giresunda-hes-kuracak-300x162.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/baydar-elektrik-giresunda-hes-kuracak-500x271.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/baydar-elektrik-giresunda-hes-kuracak-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/baydar-elektrik-giresunda-hes-kuracak.jpg 699w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>, H41-a3 paftas\u0131 i\u00e7erisinde yer alan saha i\u00e7erisinde 8.52 MW`l\u0131k \u0130limsu I-II Baraj\u0131 Ve HES kurulmas\u0131 planlan\u0131yor.<\/p>\n<p>Ekonomik \u00f6mr\u00fc 2 y\u0131l s\u00fcrecek in\u015faat faaliyetlerinden sonra 50 y\u0131l olarak hesaplanan proje kapsam\u0131nda in\u015faat a\u015famas\u0131nda 60 ki\u015fi ve i\u015fletme a\u015famas\u0131nda ise 7 ki\u015finin \u00e7al\u0131\u015ft\u0131r\u0131lmas\u0131 ve 2 y\u0131lda tamamlanmas\u0131 planlan\u0131yor.<\/p>\n<p>Proje ile y\u0131ll\u0131k ortalama 29.893 GWh elektrik \u00fcretilmesi planlan\u0131yor.<\/p>\n<p><strong>PROJE \u0130LE \u0130LG\u0130L\u0130 \u00c7ED S\u00dcREC\u0130 BA\u015eLADI<\/strong><\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`n\u00fcn internet sitesinde konu ile ilgili yap\u0131lan a\u00e7\u0131klamada, kapasite artt\u0131r\u0131m projesi ile ilgili \u00c7evresel Etki De\u011ferlendirmesi s\u00fcrecinin ba\u015flad\u0131\u011f\u0131 duyuruldu. \u00c7ED S\u00fcreci tamamlanana kadar s\u00fcre\u00e7 ile ilgili her t\u00fcrl\u00fc bilgiler ve projeye ili\u015fkin g\u00f6r\u00fc\u015f, soru ve \u00f6neriler Giresun Valili\u011fi`ne (\u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc) veya \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131na g\u00f6nderilebilecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/baydar-elektrik-giresunda-hes-kuracak_13829.html#.VWmeINLtmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Baydar Elektrik, Giresun Avutmu\u015f \u00c7ay\u0131 \u00fczerinde 8.52 MW`l\u0131k \u0130limsu I-II Baraj\u0131 Ve HES kuracak. Baydar Elektrik \u00dcretim San. ve Tic. Ltd. \u015eti. taraf\u0131ndan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":39723,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[23127,23126,5927,63,67,1009,2698,165,4640,35370,23125,1090,23124,23128],"views":1778,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39722"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=39722"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39722\/revisions"}],"predecessor-version":[{"id":39724,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39722\/revisions\/39724"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/39723"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=39722"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=39722"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=39722"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}