{"id":39548,"date":"2015-05-25T15:20:22","date_gmt":"2015-05-25T12:20:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=39548"},"modified":"2015-05-25T15:20:47","modified_gmt":"2015-05-25T12:20:47","slug":"en-buyuk-yuzer-gunes-enerjisi-santrali-ges-kurulumu-tamamlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/en-buyuk-yuzer-gunes-enerjisi-santrali-ges-kurulumu-tamamlandi\/","title":{"rendered":"(Turkish) En B\u00fcy\u00fck Y\u00fczer G\u00fcne\u015f Enerjisi Santrali ( GES ) Kurulumu Tamamland\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/39548\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kyocera ve Century Tokyo Leasing, d\u00fcnyan\u0131n en b\u00fcy\u00fck y\u00fczer g\u00fcne\u015f enerjisi santralinin y<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/dunyanin-en-buyuk-yuzer-gesi-tamamlandi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-39549\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/dunyanin-en-buyuk-yuzer-gesi-tamamlandi-300x174.jpg\" alt=\"dunyanin-en-buyuk-yuzer-gesi-tamamlandi\" width=\"300\" height=\"174\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/dunyanin-en-buyuk-yuzer-gesi-tamamlandi-300x174.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/dunyanin-en-buyuk-yuzer-gesi-tamamlandi-80x46.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/dunyanin-en-buyuk-yuzer-gesi-tamamlandi.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ap\u0131m\u0131n\u0131 tamamlad\u0131.<\/strong><\/p>\n<p>Kyocera Corp.`dan yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, Century Tokyo Leasing Corp. ile birlikte yap\u0131m\u0131 y\u00fcr\u00fct\u00fclen Japonya`daki d\u00fcnyan\u0131n en b\u00fcy\u00fck y\u00fczer g\u00fcne\u015f enerjisi santrali tamamland\u0131.<\/p>\n<p>A\u00e7\u0131klamaya g\u00f6re Japonya`n\u0131n Hyogo b\u00f6lgesinde bir baraj g\u00f6l\u00fcn\u00fcn \u00fczerine kurulan 2,3 megawatt g\u00fcc\u00fcndeki g\u00fcne\u015f enerjisi santrali, su \u00fczerine kurulan en b\u00fcy\u00fck g\u00fcne\u015f enerjisi santrali \u00fcnvan\u0131n\u0131 ald\u0131.<\/p>\n<p>Kyocera ve Century ortakl\u0131\u011f\u0131 bu y\u0131l i\u00e7inde Hyogo b\u00f6lgesinde 1,7 megawatt ve 1,2 megawatt g\u00fcc\u00fcnde 2 y\u00fczer g\u00fcne\u015f enerjisi santrali daha kurmu\u015flard\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/dunyanin-en-buyuk-yuzer-gesi-tamamlandi_13752.html#.VWMXHtLtmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kyocera ve Century Tokyo Leasing, d\u00fcnyan\u0131n en b\u00fcy\u00fck y\u00fczer g\u00fcne\u015f enerjisi santralinin yap\u0131m\u0131n\u0131 tamamlad\u0131. Kyocera Corp.`dan yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, Century Tokyo Leasing Corp. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":39549,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,2698,165,2326,21886,227,13,2569,21768,1547,23001,23002],"views":2162,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39548"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=39548"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39548\/revisions"}],"predecessor-version":[{"id":39550,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39548\/revisions\/39550"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/39549"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=39548"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=39548"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=39548"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}