{"id":39491,"date":"2015-05-24T12:00:17","date_gmt":"2015-05-24T09:00:17","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=39491"},"modified":"2015-05-24T12:01:20","modified_gmt":"2015-05-24T09:01:20","slug":"usta-enerji-antalyada-12-mw-hes-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/usta-enerji-antalyada-12-mw-hes-kuracak\/","title":{"rendered":"(Turkish) Usta Enerji Antalya`da 12 MW HES Kuracak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/39491\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Usta Enerji, Antalya`da 12,38 MW kurulu g\u00fcc\u00fcnde Co\u015fkun Reg\u00fclat\u00f6r\u00fc, HES-1, G\u00f6k\u00e7ay ve \u00c7etince Reg\u00fclat\u00f6rleri, HES-2 projesini hayata ge\u00e7irmeyi planl\u0131yor.<\/strong><\/p>\n<p>Usta Enerji Sanayi ve Ticaret Ltd. \u015eti. taraf\u0131ndan Antalya\u2019n\u0131n Serik il\u00e7esi s\u0131n\u0131rlar\u0131 dahilinde, P\u0131narg\u00f6<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/usta-enerji-antalyada-12-mw-hes-kuracak.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-39492\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/usta-enerji-antalyada-12-mw-hes-kuracak-300x144.jpg\" alt=\"usta-enerji-antalyada-12-mw-hes-kuracak\" width=\"300\" height=\"187\" \/><\/a>z\u00fc, G\u00f6k\u00e7ay ve \u00c7etince Deresi \u00fczerinde Co\u015fkun Reg\u00fclat\u00f6r\u00fc, HES-1 (9,39 MWm \/ 8,98 MWe), G\u00f6k\u00e7ay ve \u00c7etince Reg\u00fclat\u00f6rleri, HES-2 (3,54 MWm \/ 3,4 MWe), Malzeme Ocaklar\u0131, K\u0131rma-Eleme-Y\u0131kama Tesisi ve K\u0131rma-Eleme Tesisi projesinin hayata ge\u00e7irilmesi planlan\u0131yor.<\/p>\n<p>Proje kapsam\u0131nda Co\u015fkun Reg\u00fclat\u00f6r\u00fcnden \u00e7evrilen sular ile HES-1\u2019de,<br \/>\n\u00c7etince ve G\u00f6k\u00e7ay Reg\u00fclat\u00f6rlerinden \u00e7evrilen sular ile HES-2\u2019de elektrik \u00fcretilecek ve 12,38 MW toplam kurulu g\u00fcc\u00fcnde olacak HES-1 ve HES-2 ile y\u0131ll\u0131k toplam 30,72 GWh elektrik enerjisi \u00fcretilecek.<\/p>\n<p>\u0130n\u015faat a\u015famas\u0131nda (2 y\u0131l) y\u0131lda 12 ay, ayda 25 g\u00fcn, g\u00fcnde 12 saat \u00e7al\u0131\u015f\u0131lacak. \u0130n\u015faat faaliyetleri esnas\u0131nda toplam 200 personelin, projenin i\u015fletmeye al\u0131nmas\u0131 ile bak\u0131m ve kontrol i\u015flerinde 10 personelin \u00e7al\u0131\u015ft\u0131r\u0131lmas\u0131 planlan\u0131yor.<\/p>\n<p><strong>PROJEYE \u00c7ED GEREKL\u0130 G\u00d6R\u00dcLMED\u0130<\/strong><\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`n\u00fcn internet sitesinde konu ile ilgili yap\u0131lan a\u00e7\u0131klamada, proje ile ilgili olarak Bakanl\u0131\u011fa sunulan dosyan\u0131n incelenip de\u011ferlendirilerek, Antalya Valili\u011fi taraf\u0131ndan `\u00c7evresel Etki De\u011ferlendirmesi Gereklidir` karar\u0131 verildi\u011fi belirtildi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/usta-enerji-antalyada-12-mw-hes-kuracak_13699.html\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Usta Enerji, Antalya`da 12,38 MW kurulu g\u00fcc\u00fcnde Co\u015fkun Reg\u00fclat\u00f6r\u00fc, HES-1, G\u00f6k\u00e7ay ve \u00c7etince Reg\u00fclat\u00f6rleri, HES-2 projesini hayata ge\u00e7irmeyi planl\u0131yor. Usta Enerji Sanayi ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":39492,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[5201,22971,22967,63,67,1009,2698,165,22969,35370,22965,22968,22970,1090,22966],"views":1311,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39491"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=39491"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39491\/revisions"}],"predecessor-version":[{"id":39493,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39491\/revisions\/39493"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/39492"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=39491"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=39491"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=39491"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}