{"id":39256,"date":"2015-05-12T17:11:26","date_gmt":"2015-05-12T14:11:26","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=39256"},"modified":"2015-05-23T14:52:55","modified_gmt":"2015-05-23T11:52:55","slug":"izmire-10-mwlik-alapinar-jes-kuruluyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/izmire-10-mwlik-alapinar-jes-kuruluyor\/","title":{"rendered":"(Turkish) \u0130zmir`e 10 MW`l\u0131k Alap\u0131nar JES Kuruluyor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/39256\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u00c7avu\u015f Bir Jeotermal Enerji, \u0130zmir`de 10 MW`l\u0131k Alap\u0131nar Jeotermal Enerji Santrali kuracak. \u0130zmir \u0130li, Sel\u00e7uk \u0130l\u00e7esi, G\u00f6k\u00e7ealan K\u00f6y\u00fc Civar\u0131nda, \u00c7avu\u015f Bir Jeotermal Enerji Ve Elektrik \u00dcretim A.\u015e. taraf\u0131ndan 10 MW`l\u0131k Alap\u0131nar Jeotermal Enerji Santrali kurulacak.<\/strong><\/p>\n<p>\u00c7avu\u015f Bir Jeotermal Enerji Ve Elektrik \u00dcretim A.\u015e.\u2019ye ait 2011\/96 i\u015fletme ruhsat numaral\u0131 1 530,49 Ha\u2019l\u0131k \u201c<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/izmire-10-mwlik-alapinar-jes-kuruluyor.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-39257\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/izmire-10-mwlik-alapinar-jes-kuruluyor-300x240.jpg\" alt=\"izmire-10-mwlik-alapinar-jes-kuruluyor\" width=\"300\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/izmire-10-mwlik-alapinar-jes-kuruluyor-300x240.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/izmire-10-mwlik-alapinar-jes-kuruluyor-62x50.jpg 62w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/izmire-10-mwlik-alapinar-jes-kuruluyor.jpg 419w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>Jeotermal Kaynaklar ve Do\u011fal Mineralli Sular \u0130\u015fletme Ruhsat\u0131\u201d s\u0131n\u0131rlar\u0131 i\u00e7inde 9 900 m2 alan \u00fczerinde kurulmas\u0131 planlanan 10 MWe g\u00fcc\u00fcnde Jeotermal Enerji Santrali (Alap\u0131nar JES) tesisinde y\u0131lda 67 320 000 kWh elektrik enerjisi \u00fcretilmesi hedefleniyor.<\/p>\n<p>Proje kapsam\u0131nda planlanan ALP_1,ALP_2 ve ALP_3 jeotermal \u00fcretim sondajlar\u0131 Ayd\u0131n \u0130l S\u0131n\u0131rlar\u0131 i\u00e7erisinde kalmakta olup, santral alan\u0131, ALP_4 jeotermal \u00fcretim sondaj\u0131 ve R_ALP_1, R_ALP_2 ve R_ALP_3 re-enjeksiyon sondajlar\u0131 \u0130zmir \u0130l S\u0131n\u0131rlar\u0131 i\u00e7erisinde kalmakta.<\/p>\n<p>Proje bedeli ise40 000 000 (K\u0131rkMilyon T\u00fcrkLiras\u0131) olarak belirlendi.<\/p>\n<p><strong>PROJE \u0130LE \u0130LG\u0130L\u0130 \u00c7ED S\u00dcREC\u0130 BA\u015eLADI<\/strong><\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fcn\u00fcn internet sitesinde konu ile ilgili yap\u0131lan a\u00e7\u0131klamada, proje ile ilgili olarak \u0130zmir Valili\u011fi`ne sunulan dosyay\u0131 PTD Dosyas\u0131 \u00c7evresel Etki De\u011ferlendirmesi Y\u00f6netmeli\u011fi`nin 17. maddesi do\u011frultusunda incelenip uygun bulundu\u011fu ve projeye ili\u015fkin \u00c7ED S\u00fcrecinin ba\u015flad\u0131\u011f\u0131 bildirildi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/izmire-10-mwlik-alapinar-jes-kurulacak_13532.html#.VVIOLY7tmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00c7avu\u015f Bir Jeotermal Enerji, \u0130zmir`de 10 MW`l\u0131k Alap\u0131nar Jeotermal Enerji Santrali kuracak. \u0130zmir \u0130li, Sel\u00e7uk \u0130l\u00e7esi, G\u00f6k\u00e7ealan K\u00f6y\u00fc Civar\u0131nda, \u00c7avu\u015f Bir Jeotermal Enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":39257,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[],"views":1051,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39256"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=39256"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39256\/revisions"}],"predecessor-version":[{"id":39258,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39256\/revisions\/39258"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/39257"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=39256"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=39256"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=39256"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}