{"id":39253,"date":"2015-05-12T17:05:44","date_gmt":"2015-05-12T14:05:44","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=39253"},"modified":"2015-05-23T14:53:06","modified_gmt":"2015-05-23T11:53:06","slug":"res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi\/","title":{"rendered":"(Turkish) RES ve GES`lere 3.7 GW`l\u0131k Lisanss\u0131z Kapasite Tahsisi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/39253\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>May\u0131s ay\u0131 lisanss\u0131z g\u00fcne\u015f ve r\u00fczgar enerjisi yat\u0131r\u0131mlar\u0131 i\u00e7in toplam3711,7MW`l\u0131k kapasite tahsisi yap\u0131ld\u0131.<\/strong><\/p>\n<p>T\u00fcrkiye Elektrik \u0130letim A.\u015e. ( TE\u0130A\u015e)`\u0131n a\u00e7\u0131klad\u0131\u011f\u0131 May\u0131s-2015 lisanss\u0131z RES-GES kapasite verilerine g\u00f6re, 49 ildeki trafo merkezlerinde tahsis edilen g\u00fcne\u015f ve r\u00fczgar enerjisi kapasitesi 3711,7 MW iken, maksimum kapasite 5249,8 M<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-39254\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi-300x198.jpg\" alt=\"res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi\" width=\"300\" height=\"198\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi-300x198.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi.jpg 500w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>W olarak a\u00e7\u0131kland\u0131.<\/p>\n<p>Yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, tahsis edilen kapasite tahsisinde 66 trafo i\u00e7in belirlenmi\u015f olan kapasite nihai de\u011fil. Yine, a\u00e7\u0131klanan tabloda 509 MW kapasite tahsisi ile Konya ili ilk s\u0131rada yer al\u0131rken, 5 MW kapasite tahsisi ile Tekirda\u011f son s\u0131rada bulunuyor.<\/p>\n<p>Listede, bug\u00fcne kadar da\u011f\u0131t\u0131m \u015firketleri ve organize sanayi b\u00f6lgeleri taraf\u0131ndan y\u00f6netmelik\u00e7e tahsis edilen 2 MW kapasiteye ilave talebin bulunmad\u0131\u011f\u0131 merkezler yer almad\u0131. Bu merkezlere ait olu\u015fabilecek ilave veriler gelecek talepler \u00e7er\u00e7evesinde listeye eklenecek.<\/p>\n<p>TE\u0130A\u015e, lisanss\u0131z GES ve RES ba\u011flant\u0131 kapasiteleri listesini her ay\u0131n ilk haftas\u0131nda g\u00fcncelleyerek kendi internet sitesinde yay\u0131mlamaya devam edecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/res-ve-geslere-37-gwlik-lisanssiz-kapasite-tahsisi_13577.html#.VVINDY7tmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.May\u0131s ay\u0131 lisanss\u0131z g\u00fcne\u015f ve r\u00fczgar enerjisi yat\u0131r\u0131mlar\u0131 i\u00e7in toplam3711,7MW`l\u0131k kapasite tahsisi yap\u0131ld\u0131. T\u00fcrkiye Elektrik \u0130letim A.\u015e. ( TE\u0130A\u015e)`\u0131n a\u00e7\u0131klad\u0131\u011f\u0131 May\u0131s-2015 lisanss\u0131z RES-GES [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":39254,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,50],"tags":[],"views":833,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39253"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=39253"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39253\/revisions"}],"predecessor-version":[{"id":39255,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39253\/revisions\/39255"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/39254"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=39253"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=39253"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=39253"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}