{"id":39069,"date":"2015-05-07T12:21:00","date_gmt":"2015-05-07T09:21:00","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=39069"},"modified":"2015-05-23T14:34:05","modified_gmt":"2015-05-23T11:34:05","slug":"soke-ovasinin-tarim-atiklari-elektrige-donusecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/soke-ovasinin-tarim-atiklari-elektrige-donusecek\/","title":{"rendered":"(Turkish) S\u00f6ke Ovas\u0131`n\u0131n Tar\u0131m At\u0131klar\u0131 Elektri\u011fe D\u00f6n\u00fc\u015fecek&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/39069\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Mavi Bayrak Enerji, Ayd\u0131n S\u00f6ke`de 12 MW`l\u0131k Biyok\u00fctle Enerji Santrali kuracak.<\/strong><\/p>\n<p>Mavi Bayrak Enerji \u00dcretim A.\u015e. taraf\u0131ndan Ayd\u0131n ili, S\u00f6ke \u0130l\u00e7esi, S\u00f6ke Organize Sanayi B\u00f6lgesi i\u00e7erisinde 12 MWe (52,48 MWt) g\u00fcc\u00fcnde Biyok\u00fctleye Dayal\u0131 Elektrik \u00dcretim Tesisi kurulacak.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/soke-ovasinin-tarim-atiklari-elektrige-donusecek.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-39070 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/soke-ovasinin-tarim-atiklari-elektrige-donusecek-300x224.jpg\" alt=\"soke-ovasinin-tarim-atiklari-elektrige-donusecek\" width=\"300\" height=\"224\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/soke-ovasinin-tarim-atiklari-elektrige-donusecek-300x224.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/soke-ovasinin-tarim-atiklari-elektrige-donusecek-66x50.jpg 66w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/soke-ovasinin-tarim-atiklari-elektrige-donusecek.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Proje kapsam\u0131nda, S\u00f6ke ovas\u0131nda pamuk ve m\u0131s\u0131r hasat\u0131ndan sonra tarlalarda kalan \u00fcr\u00fcn saplar\u0131 biyok\u00fctle olarak kullan\u0131larak elektrik enerjisi \u00fcretilecek.<\/p>\n<p>Tesis yat\u0131r\u0131m\u0131, tesise hammadde olacak yak\u0131tlar\u0131n toplanaca\u011f\u0131 tarlalara yak\u0131nl\u0131\u011f\u0131 nedeni ile S\u00f6ke kent merkezine 3 km. uzakl\u0131kta bulunan S\u00f6ke Organize Sanayi B\u00f6lgesi`nde yap\u0131lacak.Bu \u00e7er\u00e7evede tesis, S\u00f6ke Organize Sanayi B\u00f6lgesi i\u00e7erisinde 17 ada, 2, 3, 4 ve 5 numaral\u0131 d\u00f6rt adet sanayi parselinden olu\u015fan 43.688 m\u00b2 b\u00fcy\u00fckl\u00fckteki alanda yap\u0131lacak.<\/p>\n<p>Elektrik \u00fcretmek i\u00e7in kazanda saatte 12-13 ton pamuk ve \/ veya m\u0131s\u0131r sap\u0131 yak\u0131larak 60 bar, 480\u00b0C, 45 t\/h buhar \u00fcretimi ile 12 MWe bir g\u00fc\u00e7 elde edip \u00fcretilen elektrik Ulusal Elektrik \u015eebekesine verilecek.<\/p>\n<p><strong>PROJEYE \u00c7ED GEREKL\u0130 G\u00d6R\u00dcLMED\u0130<\/strong><\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`n\u00fcn internet sitesinde konu ile ilgili yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, proje ile ilgili olarak Ayd\u0131n Valili\u011fi &#8220;\u00c7evresel Etki De\u011ferlendirmesi Gerekli De\u011fildir&#8221; karar\u0131 verdi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/soke-ovasinin-tarim-atiklari-elektrige-donusecek_13489.html#.VUsy147tmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Mavi Bayrak Enerji, Ayd\u0131n S\u00f6ke`de 12 MW`l\u0131k Biyok\u00fctle Enerji Santrali kuracak. Mavi Bayrak Enerji \u00dcretim A.\u015e. taraf\u0131ndan Ayd\u0131n ili, S\u00f6ke \u0130l\u00e7esi, S\u00f6ke Organize [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":39070,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[],"views":1881,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39069"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=39069"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39069\/revisions"}],"predecessor-version":[{"id":39071,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/39069\/revisions\/39071"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/39070"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=39069"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=39069"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=39069"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}