{"id":38802,"date":"2015-04-30T12:08:13","date_gmt":"2015-04-30T09:08:13","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=38802"},"modified":"2015-04-30T12:08:13","modified_gmt":"2015-04-30T09:08:13","slug":"vestas-abdden-78-mw-siparis-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/vestas-abdden-78-mw-siparis-aldi\/","title":{"rendered":"(Turkish) Vestas, ABD`den 78 MW Sipari\u015f Ald\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/38802\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Vestas, Amerika`da kurulacak 78 MW`l\u0131k Black Oak RES i\u00e7in Sempra U.S. Gas &amp; Power \u015firketine r\u00fczgar t\u00fcrbini sa\u011flayacak.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/vestas-abdden-78-mw-siparis-aldi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-38803\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/vestas-abdden-78-mw-siparis-aldi-300x168.jpg\" alt=\"vestas-abdden-78-mw-siparis-aldi\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/vestas-abdden-78-mw-siparis-aldi-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/vestas-abdden-78-mw-siparis-aldi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/vestas-abdden-78-mw-siparis-aldi.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>Danimarkal\u0131 r\u00fczgar t\u00fcrbini \u00fcreticisi Vestas, Amerika`n\u0131n Minnesota b\u00f6lgesinde Sempra U.S. Gas &amp; Power \u015firketi taraf\u0131ndan kurulacak olan Black Oak RES R\u00fczgar Santrali i\u00e7in 39 adet V110-2.0 MW t\u00fcrbin sa\u011flamak i\u00e7in bir anla\u015fma imzalad\u0131\u011f\u0131n\u0131 duyurdu.<\/p>\n<p>Anla\u015fmaya g\u00f6re, Vestas 2016 y\u0131l\u0131 ikinci\u00e7eyre\u011finde t\u00fcrbin sevkiyat\u0131na ba\u015flayacak ve 2016 y\u0131l\u0131 son \u00e7eyre\u011finde tamamlayacak.Anla\u015fma ile ayr\u0131ca Vestas, santralin kurulumunu yapacak, SCADA sistemini kuracak ve 5 y\u0131ll\u0131k tam bak\u0131m hizmeti sunacak.<\/p>\n<p>Kaynak: Enerji G\u00fcnl\u00fc\u011f\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Vestas, Amerika`da kurulacak 78 MW`l\u0131k Black Oak RES i\u00e7in Sempra U.S. Gas &amp; Power \u015firketine r\u00fczgar t\u00fcrbini sa\u011flayacak. Danimarkal\u0131 r\u00fczgar t\u00fcrbini \u00fcreticisi Vestas, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":38803,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[3512,1768,22654,63,67,1009,2698,165,474,22653,69,16,231,22631,22655,4734],"views":955,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38802"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=38802"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38802\/revisions"}],"predecessor-version":[{"id":38804,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38802\/revisions\/38804"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/38803"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=38802"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=38802"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=38802"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}