{"id":38790,"date":"2015-04-30T11:54:12","date_gmt":"2015-04-30T08:54:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=38790"},"modified":"2015-04-30T11:54:12","modified_gmt":"2015-04-30T08:54:12","slug":"teias-ges-5-paket-yarismasinda-10-yatirimci-onlisans-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/teias-ges-5-paket-yarismasinda-10-yatirimci-onlisans-aldi\/","title":{"rendered":"(Turkish) TE\u0130A\u015e GES 5.Paket Yar\u0131\u015fmas\u0131nda 10 Yat\u0131r\u0131mc\u0131 \u00d6nlisans Ald\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/38790\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #000000;\"><strong>T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e) taraf\u0131ndan d\u00fczenlenen GES yar\u0131\u015fmalar\u0131 ikinci g\u00fcn\u00fcnde devam etti. G\u00fcne\u015f enerjisine dayal\u0131 \u00fcretim tesisi kurmak \u00fczere yap\u0131lan \u00f6nlisans ba\u015fvurular\u0131na ili\u015fkin 5. yar\u0131\u015fma paketini\u00a0bug\u00fcn d\u00fczenlendi. Toplam 4 b\u00f6lgede 10 yat\u0131r\u0131mc\u0131\u00a0\u00f6nlisans almaya hak kazand\u0131.<\/strong><span id=\"more-71327\"><\/span><\/p>\n<p style=\"color: #000000;\">Yar\u0131\u015fmaya kat\u0131lan \u015firketlerin teklifleri, \u00fcretim tesisinin ilk \u00fcnitesinin ge\u00e7ici kabul\u00fcn\u00fcn yap\u0131ld\u0131\u011f\u0131 tarihten ba\u015flamak \u00fczere en fazla 3 y\u0131l i\u00e7erisinde birim megavat ba\u015f\u0131na TE\u0130A\u015e\u2019a katk\u0131 pay\u0131 \u00f6deme taahh\u00fcd\u00fcne g\u00f6re de\u011ferlendiriliyor.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/teias-ges-5-paket-yarismasinda-10-yatirimci-onlisans-aldi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-38791\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/teias-ges-5-paket-yarismasinda-10-yatirimci-onlisans-aldi-300x165.jpg\" alt=\"teias-ges-5-paket-yarismasinda-10-yatirimci-onlisans-aldi\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/teias-ges-5-paket-yarismasinda-10-yatirimci-onlisans-aldi-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/teias-ges-5-paket-yarismasinda-10-yatirimci-onlisans-aldi-500x275.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/teias-ges-5-paket-yarismasinda-10-yatirimci-onlisans-aldi-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/teias-ges-5-paket-yarismasinda-10-yatirimci-onlisans-aldi.jpg 870w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p style=\"color: #000000;\">\u015eirketler, katk\u0131 pay\u0131 tutar\u0131n\u0131, \u00fcretim tesisinin ilk \u00fcnitesinin ge\u00e7ici kabul\u00fcn\u00fcn yap\u0131ld\u0131\u011f\u0131 tarihten ba\u015flamak \u00fczere 3 y\u0131l i\u00e7erisinde ve y\u0131ll\u0131k e\u015fit taksitler \u015feklinde TE\u0130A\u015e\u2019a \u00f6deyecek.<\/p>\n<p style=\"color: #000000;\">Yenilenebilir enerji kaynaklar\u0131n\u0131n desteklenmesi kapsam\u0131nda\u00a0g\u00fcne\u015f enerjisi\u00a0santrali yat\u0131r\u0131mlar\u0131nda, sisteme elektrik verilmeye ba\u015fland\u0131\u011f\u0131 tarihten itibaren 10 y\u0131l s\u00fcreyle 13,3 dolar cent \u00fczerinden al\u0131m garantisi bulunuyor. Bu s\u00fcrenin ilk be\u015f y\u0131l\u0131nda, yerli ekipman kullan\u0131lmas\u0131 halinde bu miktar 22 dolar cente kadar \u00e7\u0131kabiliyor.Ancak, miktar \u015fu anda 14,1 dolar cent d\u00fczeyinde kal\u0131yor. Yerli ekipman kullan\u0131lmas\u0131 durumunda bunun \u201dYerli \u0130malat Durum Belgesi\u201d ile belgelendirilmesi gerekiyor. T\u00fcrkiye\u2019de kurulu panel fabrika bulunmas\u0131na ra\u011fmen bunlar daha \u00e7ok yerli montaj \u015feklinde \u00fcretim yap\u0131yor. Bu panel \u00fcreticilerinin \u201dYerli \u0130malat Durum Belgesi\u201d alma y\u00f6n\u00fcnde \u00e7al\u0131\u015fmalar\u0131 s\u00fcr\u00fcyor.<\/p>\n<blockquote style=\"color: #000000;\"><p>5.Paket yar\u0131\u015fma duyurusu i\u00e7in\u00a0<a style=\"color: #c75615;\" title=\"teias ges 4.paket yar\u0131\u015fma duyurusu\" href=\"http:\/\/www.teias.gov.tr\/\/duyurular\/5.PAKET-DUYURU.pdf\" target=\"_blank\" rel=\"nofollow\">t\u0131klay\u0131n\u0131z<\/a>.<\/p>\n<p>Ge\u00e7mi\u015f yar\u0131\u015fma sonu\u00e7lar\u0131 i\u00e7in\u00a0<a style=\"color: #c75615;\" href=\"http:\/\/enerjienstitusu.com\/tag\/teias-yarisma\/\" target=\"_blank\">t\u0131klay\u0131n\u0131z<\/a>.<\/p><\/blockquote>\n<blockquote style=\"color: #000000;\">\n<h3 style=\"color: #232323;\">Paket 5 Sonu\u00e7lar\u0131:<\/h3>\n<ul>\n<li><strong>Kayramanmara\u015f Ad\u0131yaman \u2013 27MW<\/strong><\/li>\n<\/ul>\n<p>1- KAROMAD MADENC\u0130L\u0130K \u0130N\u015e.ELEKTR\u0130K MALZ.MAK\u0130NE NAKL\u0130YE SAN.VE T\u0130C.LTD.\u015eT\u0130.<br \/>\nB\u00dcGET GES<br \/>\n<strong>2.345.000 TL\/MW<\/strong>\u00a0(Kazan\u0131lan Kapasite: 7 MW)<\/p>\n<p>2-ULUDER ELEKTR\u0130K \u00dcRET\u0130M A.\u015e.<br \/>\nB\u00dcGET GES<br \/>\n<strong>2.118.000 TL\/MW<\/strong>\u00a0(Kazan\u0131lan Kapasite: 10 MW)<\/p>\n<p>3-SOLAR VENTURES SARI.EN.YAT.SAN.VE T\u0130C.A.\u015e<br \/>\nELB\u0130STAN 1 GES<br \/>\n<strong>2.100.000 TL\/MW<\/strong>\u00a0(Ba\u015fvuru 26,96 MW \u2013 Kazan\u0131lan Kapasite: 10 MW)<\/p>\n<ul>\n<li><strong>Malatya Ad\u0131yaman \u2013 22MW<\/strong><\/li>\n<\/ul>\n<p>1-\u0130OTA G\u00dcNE\u015e ENERJ\u0130S\u0130 ELEKTR\u0130K \u00dcRET\u0130M VE T\u0130C.LTD.\u015eT\u0130.<br \/>\n\u0130OTA M.FIRINCI GES<br \/>\n<strong>2.960.000 TL\/MW<\/strong>\u00a0(Kazan\u0131lan Kapasite: 9,95 MW)<\/p>\n<p>2-\u00d6ZG\u00dc\u00c7L\u00dc ENERJ\u0130 SAN.VE T\u0130C.A.\u015e.<br \/>\n\u00d6ZG\u00dc\u00c7L\u00dc GES<br \/>\n<strong>2.311.000 TL\/MW<\/strong>\u00a0(Kazan\u0131lan Kapasite: 10 MW)<\/p>\n<p>3-DESUN ENERJ\u0130 ELEKTR\u0130K \u00dcRET\u0130M A.\u015e.<br \/>\nDESUN ADIYAMAN GES<br \/>\n<strong>2.025.000 TL\/MW<\/strong>\u00a0(Kazan\u0131lan Kapasite: 2,05 MW)<\/p>\n<ul>\n<li><strong>Van A\u011fr\u0131 \u2013 77MW<\/strong><\/li>\n<\/ul>\n<p>1-OM\u0130CRON G\u00dcNE\u015e ENERJ\u0130S\u0130 ELEKTR\u0130K \u00dcRET\u0130M VE \u00a0T\u0130C.LTD.\u015eT\u0130.<br \/>\n<strong>2.960.000 TL\/MW<\/strong><br \/>\n2-G\u00dcN G\u00dcNE\u015e ENERJ\u0130S\u0130 ELEKTR\u0130K \u00dcRET\u0130M SAN.VE T\u0130C.A.\u015e.<br \/>\n<strong>1.915.000 TL\/MW<\/strong><br \/>\n3-TU\u015eBA ENERJ\u0130 \u00dcRET\u0130M PAZ.SAN.VE T\u0130C.LTD.\u015eT\u0130.<br \/>\n<strong>1.665.000 TL\/MW<\/strong><\/p>\n<ul>\n<li><strong>Bitlis \u2013 16MW<\/strong><\/li>\n<\/ul>\n<p>1-ALAGES ELEKTR\u0130K \u00dcRET\u0130M LTD.\u015eT\u0130.<br \/>\nALAGES AD\u0130LCEVAZ GES<br \/>\n<strong>150.000 TL\/MW<\/strong><\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p><\/blockquote>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e) taraf\u0131ndan d\u00fczenlenen GES yar\u0131\u015fmalar\u0131 ikinci g\u00fcn\u00fcnde devam etti. G\u00fcne\u015f enerjisine dayal\u0131 \u00fcretim tesisi kurmak \u00fczere yap\u0131lan \u00f6nlisans [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":38791,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,2698,165,2326,21886,227,13,2569,21768],"views":1253,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38790"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=38790"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38790\/revisions"}],"predecessor-version":[{"id":38792,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38790\/revisions\/38792"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/38791"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=38790"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=38790"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=38790"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}