{"id":38769,"date":"2015-04-29T16:16:43","date_gmt":"2015-04-29T13:16:43","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=38769"},"modified":"2015-04-29T16:16:43","modified_gmt":"2015-04-29T13:16:43","slug":"ngpi-turkiyede-100-mwlik-jeotermal-enerji-santrali-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ngpi-turkiyede-100-mwlik-jeotermal-enerji-santrali-kuracak\/","title":{"rendered":"(Turkish) NGPI, T\u00fcrkiye\u2019de 100 MW\u2019l\u0131k Jeotermal Enerji Santrali Kuracak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/38769\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #000000;\"><strong>ABD\u2019li enerji \u015firketi NGPI, 400 milyon $ yat\u0131r\u0131mla T\u00fcrkiye`de jeotermal enerji santrali kuracak. Projenin 10 MW`l\u0131k k\u0131sm\u0131 bu y\u0131l sonu devreye al\u0131nacak.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/ngpi-turkiyede-100-mwlik-jeotermal-enerji-santrali-kuracak.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-38770 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/ngpi-turkiyede-100-mwlik-jeotermal-enerji-santrali-kuracak-300x184.jpg\" alt=\"ngpi-turkiyede-100-mwlik-jeotermal-enerji-santrali-kuracak\" width=\"300\" height=\"184\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/ngpi-turkiyede-100-mwlik-jeotermal-enerji-santrali-kuracak-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/ngpi-turkiyede-100-mwlik-jeotermal-enerji-santrali-kuracak-500x308.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/ngpi-turkiyede-100-mwlik-jeotermal-enerji-santrali-kuracak-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/ngpi-turkiyede-100-mwlik-jeotermal-enerji-santrali-kuracak.jpg 870w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p style=\"color: #000000;\">ABD\u2019li enerji \u015firketi New Generation Power International (NGPI), 400 milyon dolara yak\u0131n yat\u0131r\u0131mla T\u00fcrkiye\u2019de 100 megawatt (MW) g\u00fcc\u00fcnde jeotermal enerji santrali kurmak i\u00e7in Y\u0131lsan Holding, Mineks International ve DCM Energy \u015firketleriyle birlikte ortakl\u0131k kurdu.<span id=\"more-71310\"><\/span><\/p>\n<p style=\"color: #000000;\">ABD\u2019li \u015firketin yay\u0131mlad\u0131\u011f\u0131 b\u00fcltende, projenin 10 MW\u2019lik b\u00f6l\u00fcm\u00fcn\u00fcn bu y\u0131l sonu, buna ek 40 MW b\u00f6l\u00fcm\u00fcn 2016 sonu, kalan 50 MW b\u00f6l\u00fcm\u00fcn ise 2017 sonunda devreye al\u0131naca\u011f\u0131 belirtildi. A\u00e7\u0131klamada 20 y\u0131l s\u00fcreyle faaliyette kalmas\u0131 beklenen santralin T\u00fcrkiye\u2019nin kuzeybat\u0131s\u0131nda kurulaca\u011f\u0131 ifade edildi.<\/p>\n<p style=\"color: #000000;\">Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. ABD\u2019li enerji \u015firketi NGPI, 400 milyon $ yat\u0131r\u0131mla T\u00fcrkiye`de jeotermal enerji santrali kuracak. Projenin 10 MW`l\u0131k k\u0131sm\u0131 bu y\u0131l sonu devreye al\u0131nacak. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":38770,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[19474,22628,63,67,1009,2698,165,117,58,56,10686,6322,5313,22629,22630],"views":1615,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38769"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=38769"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38769\/revisions"}],"predecessor-version":[{"id":38771,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38769\/revisions\/38771"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/38770"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=38769"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=38769"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=38769"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}