{"id":38763,"date":"2015-04-29T16:05:21","date_gmt":"2015-04-29T13:05:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=38763"},"modified":"2015-04-29T16:05:21","modified_gmt":"2015-04-29T13:05:21","slug":"teias-ges-4-paket-yarismasi-sonuclandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/teias-ges-4-paket-yarismasi-sonuclandi\/","title":{"rendered":"(Turkish) TE\u0130A\u015e GES 4. Paket Yar\u0131\u015fmas\u0131 Sonu\u00e7land\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/38763\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #000000;\"><strong>T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e), g\u00fcne\u015f enerjisine dayal\u0131 \u00fcretim tesisi kurmak \u00fczere yap\u0131lan \u00f6nlisans ba\u015fvurular\u0131na ili\u015fkin 4. yar\u0131\u015fma paketini\u00a0bug\u00fcn d\u00fczenlendi.\u00a0G\u00fcne\u015f enerjisine dayal\u0131 \u00fcretim tesisi kurmak \u00fczere yap\u0131lan \u00f6nlisans ba\u015fvurusunda bulunanan bir\u00e7ok\u00a0firma yar\u0131\u015ft\u0131. Toplam 4 b\u00f6lgede 5 yat\u0131r\u0131mc\u0131\u00a0\u00f6nlisans almaya hak kazand\u0131.<\/strong><span id=\"more-71301\"><\/span><\/p>\n<p style=\"color: #000000;\">Yar\u0131\u015fmaya kat\u0131lan \u015firketlerin teklifleri, \u00fcretim tesisinin ilk \u00fcnitesinin ge\u00e7ici kabul\u00fcn\u00fcn yap\u0131ld\u0131\u011f\u0131 tarihten ba\u015flamak \u00fczere en fazla 3 y\u0131l i\u00e7erisinde birim megavat ba\u015f\u0131na TE\u0130A\u015e\u2019a katk\u0131 pay\u0131 \u00f6deme taahh\u00fcd\u00fcne g\u00f6re de\u011ferlendiriliyor.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/teias-ges-4-paket-yarismasi-sonuclandi.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-38764 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/teias-ges-4-paket-yarismasi-sonuclandi-300x145.jpg\" alt=\"teias-ges-4-paket-yarismasi-sonuclandi\" width=\"300\" height=\"145\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/teias-ges-4-paket-yarismasi-sonuclandi-300x145.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/teias-ges-4-paket-yarismasi-sonuclandi-500x242.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/teias-ges-4-paket-yarismasi-sonuclandi-80x38.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/teias-ges-4-paket-yarismasi-sonuclandi.jpg 870w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p style=\"color: #000000;\">\u015eirketler, katk\u0131 pay\u0131 tutar\u0131n\u0131, \u00fcretim tesisinin ilk \u00fcnitesinin ge\u00e7ici kabul\u00fcn\u00fcn yap\u0131ld\u0131\u011f\u0131 tarihten ba\u015flamak \u00fczere 3 y\u0131l i\u00e7erisinde ve y\u0131ll\u0131k e\u015fit taksitler \u015feklinde TE\u0130A\u015e\u2019a \u00f6deyecek.<\/p>\n<p style=\"color: #000000;\">Yenilenebilir enerji kaynaklar\u0131n\u0131n desteklenmesi kapsam\u0131nda\u00a0g\u00fcne\u015f enerjisi\u00a0santrali yat\u0131r\u0131mlar\u0131nda, sisteme elektrik verilmeye ba\u015fland\u0131\u011f\u0131 tarihten itibaren 10 y\u0131l s\u00fcreyle\u00a0<strong>13,3 dolar cent<\/strong>\u00a0\u00fczerinden al\u0131m garantisi bulunuyor. Bu s\u00fcrenin ilk be\u015f y\u0131l\u0131nda, yerli ekipman kullan\u0131lmas\u0131 halinde bu miktar 22 dolar cente kadar \u00e7\u0131kabiliyor.Ancak, miktar \u015fu anda\u00a0<strong>14,1 dolar cent<\/strong>\u00a0d\u00fczeyinde kal\u0131yor. Yerli ekipman kullan\u0131lmas\u0131 durumunda bunun \u201dYerli \u0130malat Durum Belgesi\u201d ile belgelendirilmesi gerekiyor. T\u00fcrkiye\u2019de kurulu panel fabrika bulunmas\u0131na ra\u011fmen bunlar daha \u00e7ok yerli montaj \u015feklinde \u00fcretim yap\u0131yor. Bu panel \u00fcreticilerinin \u201dYerli \u0130malat Durum Belgesi\u201d alma y\u00f6n\u00fcnde \u00e7al\u0131\u015fmalar\u0131 s\u00fcr\u00fcyor.<\/p>\n<blockquote style=\"color: #000000;\"><p>4.Paket yar\u0131\u015fma duyurusu i\u00e7in\u00a0<a style=\"color: #c75615;\" title=\"teias ges 4.paket yar\u0131\u015fma duyurusu\" href=\"http:\/\/www.teias.gov.tr\/\/duyurular\/4.PAKET-DUYURU.pdf\" target=\"_blank\" rel=\"nofollow\">t\u0131klay\u0131n\u0131z<\/a>.<\/p>\n<p>Ge\u00e7mi\u015f yar\u0131\u015fma sonu\u00e7lar\u0131 i\u00e7in\u00a0<a style=\"color: #c75615;\" href=\"http:\/\/enerjienstitusu.com\/tag\/teias-yarisma\/\" target=\"_blank\">t\u0131klay\u0131n\u0131z<\/a>.<\/p><\/blockquote>\n<blockquote style=\"color: #000000;\">\n<h3 style=\"color: #232323;\">Paket 4 Sonu\u00e7lar\u0131<\/h3>\n<ul>\n<li><strong>Adana Osmaniye B\u00f6lgesi \u2013 9MW<\/strong><\/li>\n<\/ul>\n<p>Aten Elektrik (Aktepe GES) \u2013\u00a02.004.999 TL\/MW<\/p>\n<ul>\n<li><strong>Sivas B\u00f6lgesi \u2013 9MW<\/strong><\/li>\n<\/ul>\n<p>YBT Enerji (Hamal GES) \u2013\u00a01.888.008 TL\/MW<\/p>\n<ul>\n<li><strong>Kayseri B\u00f6lgesi \u2013 25MW<\/strong><\/li>\n<\/ul>\n<p>1- \u00d6zkoyuncu Enerji (\u00d6zkoyunlu Ye\u015filhisar GES) \u2013\u00a02.511.051 TL\/MW (Kazan\u0131lan Kapasite: 15MW)<\/p>\n<p>2- Uluder Elektrik (Edikli GES) \u2013\u00a01.957.000 TL\/MW\u00a0(Kazan\u0131lan Kapasite: 10MW)<\/p>\n<ul>\n<li><strong>Ni\u011fde Nev\u015fehir Aksaray B\u00f6lgesi \u2013 26MW<\/strong><\/li>\n<\/ul>\n<p>C\u0131ng\u0131ll\u0131 Organik Tar\u0131m (C\u0131ng\u0131ll\u0131 GES) \u2013\u00a02.720.000 TL\/MW<\/p><\/blockquote>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e), g\u00fcne\u015f enerjisine dayal\u0131 \u00fcretim tesisi kurmak \u00fczere yap\u0131lan \u00f6nlisans ba\u015fvurular\u0131na ili\u015fkin 4. yar\u0131\u015fma paketini\u00a0bug\u00fcn d\u00fczenlendi.\u00a0G\u00fcne\u015f enerjisine dayal\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":38764,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,2698,165,2326,20439,20440,20441,227,13,2569,20442,20443,20444,275,20445,22619,22620,22621,20446,20447],"views":1272,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38763"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=38763"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38763\/revisions"}],"predecessor-version":[{"id":38765,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38763\/revisions\/38765"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/38764"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=38763"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=38763"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=38763"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}