{"id":38654,"date":"2015-04-26T18:17:33","date_gmt":"2015-04-26T15:17:33","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=38654"},"modified":"2015-04-26T18:17:44","modified_gmt":"2015-04-26T15:17:44","slug":"limak-ilk-gunes-santraliyle-23-gigavatsaat-uretim-hedefliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/limak-ilk-gunes-santraliyle-23-gigavatsaat-uretim-hedefliyor\/","title":{"rendered":"(Turkish) Limak, \u0130lk G\u00fcne\u015f Santraliyle 23 Gigavatsaat \u00dcretim Hedefliyor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/38654\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Limak Enerji \u0130cra Kurulu Ba\u015fkan\u0131 Erg\u00fcven, &#8220;G\u00fcne\u015f alan\u0131ndaki ba\u015flang\u0131\u00e7 noktam\u0131z olan Konya&#8217;daki Apa GES projemizin, en ge\u00e7 2017&#8217;de \u00e7al\u0131\u015f\u0131r duruma ge\u00e7mesini ve 23 gigavatsaat \u00fcretim yapmay\u0131 hedefliyoruz&#8221; dedi.<\/strong><\/p>\n<p>Limak Enerji&#8217;nin yenilenebilir yat\u0131r\u0131mlar\u0131n\u0131 ve bu alandaki hedeflerini anlatan Limak Enerji \u0130cra Kurulu Ba\u015fkan\u0131 Birol Erg\u00fcven, 3 bin megavat seviyesindeki kurulu g\u00fc\u00e7lerinin 700 megavat\u0131n\u0131 yenilenebilir kaynaklar\u0131n olu\u015fturdu\u011funu s\u00f6yledi. Erg\u00fcven, \u015firket olarak kaynak \u00e7e\u015fitlili\u011fine b\u00fcy\u00fck \u00f6nem verdiklerini ve yenilenebilir portf\u00f6y\u00fcn\u00fcn tamam\u0131na yak\u0131n\u0131n\u0131n rezerv<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/limak-ilk-gunes-santraliyle-23-gigavatsaat-uretim-hedefliyor.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-38655 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/limak-ilk-gunes-santraliyle-23-gigavatsaat-uretim-hedefliyor-300x153.jpg\" alt=\"limak-ilk-gunes-santraliyle-23-gigavatsaat-uretim-hedefliyor\" width=\"300\" height=\"153\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/limak-ilk-gunes-santraliyle-23-gigavatsaat-uretim-hedefliyor-300x153.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/limak-ilk-gunes-santraliyle-23-gigavatsaat-uretim-hedefliyor-500x255.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/limak-ilk-gunes-santraliyle-23-gigavatsaat-uretim-hedefliyor-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/limak-ilk-gunes-santraliyle-23-gigavatsaat-uretim-hedefliyor.jpg 685w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>uarl\u0131 hidroelektrik santrallerinden olu\u015ftu\u011funu dile getirdi.<\/p>\n<p>G\u00fcne\u015f, r\u00fczgar ve jeotermal yat\u0131r\u0131mlar\u0131n\u0131n da \u00fcretim portf\u00f6ylerine eklenmesi i\u00e7in yo\u011fun bir \u00e7al\u0131\u015fma g\u00f6sterdiklerini vurgulayan Erg\u00fcven, \u015f\u00f6yle devam etti:<\/p>\n<p>&#8220;\u00dcretimdeki uzun vade hedefimiz toplam \u00fcretim portf\u00f6y b\u00fcy\u00fckl\u00fc\u011f\u00fc olarak 5000 MW seviyesine ula\u015fmakt\u0131r. Bu kapasitede hidroelektrik d\u0131\u015f\u0131 yenilenebilir yat\u0131r\u0131mlar \u00f6nemli yer tutuyor. Hidroelektirk potansiyelin limitli olmas\u0131 nedeni ile uzun vadede yat\u0131r\u0131m trendinin r\u00fczgar, g\u00fcne\u015f ve jeotermal taraf\u0131na kayaca\u011f\u0131n\u0131 \u00f6ng\u00f6r\u00fcyoruz. T\u00fcm bu alanlarda \u00fclkemizin ihtiya\u00e7lar\u0131na en uygun projerleri geli\u015ftirmek i\u00e7in faaliyetlerimize ara vermeden devam ediyoruz. G\u00fcne\u015f alan\u0131nda bu hareketin ba\u015flang\u0131\u00e7 noktas\u0131 2014 y\u0131l\u0131nda ihalesini kazand\u0131\u011f\u0131m\u0131z Apa GES projesi oldu. 13,1 MW kapasiteli Konya&#8217;da bulunan projemizin en ge\u00e7 2017 senesinde \u00e7al\u0131\u015f\u0131r duruma ge\u00e7mesini ve 23 gigavatsaat \u00fcretim yapmay\u0131 hedefliyoruz. Projenin yat\u0131r\u0131m bedeli i\u00e7in \u00f6ng\u00f6r\u00fcm\u00fcz 15 milyon dolar civar\u0131ndad\u0131r. Buna ihaledeki devlete \u00f6deyece\u011fimiz lisans bedelini de ekledi\u011fimizde rakam 22 milyon dolar seviyesine y\u00fckseliyor.&#8221;<\/p>\n<p>Erg\u00fcven, proje i\u00e7in teknoloji ve finansman konular\u0131nda \u00e7al\u0131\u015fmalar\u0131n\u0131n devam etti\u011fini ve ama\u00e7lar\u0131n\u0131n T\u00fcrkiye&#8217;ye \u00f6rnek bir g\u00fcne\u015f santrali kazand\u0131rmak oldu\u011funu ifade etti.<\/p>\n<p>Apa GES&#8217;ten \u00fcretilecek elektri\u011fin ilk 10 y\u0131l al\u0131m ve fiyat garantisi oldu\u011funu, 10 y\u0131ll\u0131k al\u0131m garantisi sona erdi\u011finde ise Limak Enerji Ticaret Grubu&#8217;nun sat\u0131\u015f kanallar\u0131nda de\u011ferlendirilece\u011fini belirten Erg\u00fcven, &#8220;Bu konuda daha \u015fimdiden \u00e7ok ciddi bir deneyime sahibiz. Bu anlamda sadece kendi yenilenebilir enerji \u00fcretim birimlerimiz i\u00e7in de\u011fil, ayn\u0131 zamanda o d\u00f6nemde 10 y\u0131ll\u0131k al\u0131m garantisi s\u00fcresinin sonuna gelmi\u015f ve \u00fcretti\u011fi enerjiyi piyasaya satmas\u0131 gereken di\u011fer t\u00fcm yat\u0131r\u0131mc\u0131lar i\u00e7in de en iyi fiyat alternatiflerini sunaca\u011f\u0131m\u0131z\u0131 \u015fimdiden s\u00f6yleyebilirim&#8221; ifadelerini kulland\u0131.<\/p>\n<p><strong>&#8216;TE\u0130A\u015e&#8217;\u0131n 4. paket yar\u0131\u015fmas\u0131nda 24 MWl\u0131k projemiz var&#8217;<\/strong><\/p>\n<p>Erg\u00fcven, g\u00fcne\u015f projelerini finanse etmek i\u00e7in pek \u00e7ok esnek mekanizma bulundu\u011funu, ancak bu konuda belirleyici unsurun santrallerin yap\u0131m y\u00f6ntemleri ve kullan\u0131lacak olan \u00fcr\u00fcnlerin men\u015fei oldu\u011funu ifade etti. Apa GES santraline ek olarak, TE\u0130A\u015e&#8217;\u0131n 4. paket yar\u0131\u015fmas\u0131nda da projeleri oldu\u011funu belirten Erg\u00fcven, \u015funlar\u0131 kaydetti:<\/p>\n<p>&#8220;Apa GES projesine ilave olarak TE\u0130A\u015e taraf\u0131ndan a\u00e7\u0131klanm\u0131\u015f olan 4. pakette yar\u0131\u015fmaya girece\u011fimiz, Nev\u015fehir&#8217;de yer alan 24 MW kapasiteli Derinkuyu GES var. Bu projemizin de hayata ge\u00e7mesi durumunda y\u0131ll\u0131k \u00fcretim miktar\u0131 toplamda 42 gigavatsaat olacak. Do\u011fru fizibilete ile geli\u015ftirilmi\u015f ve bu fizibilite de\u011ferlerinin d\u0131\u015f\u0131na \u00e7\u0131kmayan do\u011fru lisans bedelleri taahh\u00fct edilmi\u015f projelerin finansman\u0131nda bir zorluk olaca\u011f\u0131n\u0131 d\u00fc\u015f\u00fcnm\u00fcyoruz. En son a\u00e7\u0131klanan r\u00fczgar iletim kapasitesine y\u00f6nelik olarak geli\u015ftirdi\u011fimiz 400 MW RES proje saham\u0131z mevcut. Bu pakete ili\u015fkin kapasite tahsis ihalelerinin a\u00e7\u0131lmas\u0131n\u0131 bekliyoruz. Bu \u015fekilde kendi geli\u015ftirdi\u011fimiz RES projelerinin in\u015faas\u0131na da h\u0131zla ba\u015flamay\u0131 hedefliyoruz.&#8221;<\/p>\n<p>T\u00fcrkiye g\u00fcne\u015f enerjisi alan\u0131nda 64 megavat kurulu g\u00fcce sahip, bu kapasitenin tamam\u0131 lisanss\u0131z santrallerden sa\u011flan\u0131yor. TE\u0130A\u015e, ger\u00e7ekle\u015ftirdi\u011fi g\u00fcne\u015f yar\u0131\u015fmalar\u0131 ile 23 \u015firketin toplamda 230 megavat kapasite sa\u011flayacak projesini lisansland\u0131rmak i\u00e7in se\u00e7ti. TE\u0130A\u015e&#8217;\u0131n 4. ve 5. paket yar\u0131\u015fmalar\u0131 ise 28-30 Nisan tarihlerinde ger\u00e7ekle\u015fecek.<\/p>\n<p>Kaynak: D\u00fcnya<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Limak Enerji \u0130cra Kurulu Ba\u015fkan\u0131 Erg\u00fcven, &#8220;G\u00fcne\u015f alan\u0131ndaki ba\u015flang\u0131\u00e7 noktam\u0131z olan Konya&#8217;daki Apa GES projemizin, en ge\u00e7 2017&#8217;de \u00e7al\u0131\u015f\u0131r duruma ge\u00e7mesini ve 23 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":38655,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,2698,165,21886,227,2569,21768],"views":957,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38654"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=38654"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38654\/revisions"}],"predecessor-version":[{"id":38657,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38654\/revisions\/38657"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/38655"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=38654"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=38654"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=38654"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}