{"id":38633,"date":"2015-04-25T16:56:31","date_gmt":"2015-04-25T13:56:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=38633"},"modified":"2015-04-25T16:56:31","modified_gmt":"2015-04-25T13:56:31","slug":"zimbabwe-570-milyon-dolarlik-gunes-enerjisi-yatirimi-yapacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/zimbabwe-570-milyon-dolarlik-gunes-enerjisi-yatirimi-yapacak\/","title":{"rendered":"(Turkish) Zimbabwe 570 Milyon Dolarl\u0131k G\u00fcne\u015f Enerjisi Yat\u0131r\u0131m\u0131 Yapacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/38633\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Zimbabwe Elektrik \u015eirketi (ZPC) 570 milyon dolar de\u011ferinde g\u00fcne\u015f enerjisi yat\u0131r\u0131m\u0131 ger\u00e7ekle\u015ftirecek.<\/strong><\/p>\n<p>Elektrik s\u0131k\u0131nt\u0131s\u0131 ya\u015fayan Afrika \u00fclkesi Zimbabwe yenilenebilir kaynaklara yat\u0131r\u0131m yaparak bu s\u0131k\u0131nt\u0131s\u0131n\u0131 <img loading=\"lazy\" class=\"alignright  wp-image-38634\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/zimbabwe-570-milyon-dolarlik-gunes-enerjisi-yatirimi-yapacak-300x224.jpg\" alt=\"zimbabwe-570-milyon-dolarlik-gunes-enerjisi-yatirimi-yapacak\" width=\"300\" height=\"194\" \/>gide<br \/>\nrmeyi ama\u00e7l\u0131yor. Zimbabwe Elektrik \u015eirketi (ZPC) Genel M\u00fcd\u00fcr\u00fc Noah Gwariro, \u00fclkede ger\u00e7ekle\u015ftirecekleri 570 milyon dolar de\u011ferinde g\u00fcne\u015f enerjisi yat\u0131r\u0131m\u0131 i\u00e7in ihale d\u00fczenleyeceklerini a\u00e7\u0131klad\u0131.<\/p>\n<p>\u00d6n eleme ile 4 \u015firketin yar\u0131\u015faca\u011f\u0131 ihalenin Haziran ay\u0131na kadar tamamlanmas\u0131 bekleniyor. Gwanda, Plumtree and Munyati \u015fehirlerinde kurulacak G\u00fcne\u015f Santrallerinin dokuz ay i\u00e7inde kurulmas\u0131 ve her birinin 100 MW kurulum kapasitesinde olmas\u0131 bekleniyor.<\/p>\n<p>G\u00fcne\u015f enerjisi projesi \u00fclkenin 5-6 y\u0131l i\u00e7inde toplam 3500 MW`\u0131n \u00fczerinde bir kapasite yakalamay\u0131 hedefleyen 5 milyar dolarl\u0131k bir projenin par\u00e7as\u0131 olarak hayata ge\u00e7irilecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/zimbabwe-570-milyon-dolarlik-gunes-yatirimi-yapaca_13328.html#.VTug0dLtmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Zimbabwe Elektrik \u015eirketi (ZPC) 570 milyon dolar de\u011ferinde g\u00fcne\u015f enerjisi yat\u0131r\u0131m\u0131 ger\u00e7ekle\u015ftirecek. Elektrik s\u0131k\u0131nt\u0131s\u0131 ya\u015fayan Afrika \u00fclkesi Zimbabwe yenilenebilir kaynaklara yat\u0131r\u0131m yaparak bu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":38634,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,165,2326,21886,227,13,2569,21768,431,2054,22561,1286,22560],"views":896,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38633"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=38633"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38633\/revisions"}],"predecessor-version":[{"id":38635,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38633\/revisions\/38635"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/38634"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=38633"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=38633"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=38633"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}