{"id":38584,"date":"2015-04-24T12:32:37","date_gmt":"2015-04-24T09:32:37","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=38584"},"modified":"2015-04-24T12:32:37","modified_gmt":"2015-04-24T09:32:37","slug":"turk-akiminda-artik-top-turkiyede","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turk-akiminda-artik-top-turkiyede\/","title":{"rendered":"(Turkish) T\u00fcrk Ak\u0131m\u0131\u2019nda Art\u0131k Top T\u00fcrkiye\u2019de!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/38584\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #000000;\"><strong>Rusya Enerji Bakanl\u0131\u011f\u0131 Ulusal \u0130\u015fbirli\u011fi Direkt\u00f6r\u00fc Ilya Galkin, T\u00fcrk Ak\u0131m\u0131 anla\u015fmas\u0131 i\u00e7in \u201cB\u00fct\u00fcn evraklar\u0131 tamamlad\u0131k, g\u00f6nderdik. Art\u0131k top T\u00fcrk taraf\u0131nda\u201d dedi.<\/strong><\/p>\n<p style=\"color: #000000;\">Ilya Galkin Moskova\u2019da T\u00fcrk gazetecilerin sorular\u0131n\u0131 yan\u0131tlad\u0131.<span id=\"more-71257\"><\/span>\u00a0Petrol fiyat d\u00fc\u015fmesi ile Rusya\u2019da ya\u015fanan ekonomik sorunlar\u0131n T\u00fcrk ak\u0131m\u0131 ve Akkuyu n\u00fckleer santrali gibi projelerde gecikme yaratmayaca\u011f\u0131n\u0131 belirten Galkin, \u201cAkkuyu\u2019da Rosatom bir yat\u0131r\u0131mc\u0131 ancak devlet deste\u011fi alacaklar ve zaman\u0131nda tamamlanacak. T\u00fcrk Ak\u0131m\u0131 \u00e7ok daha basit bir kon<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/budapestede-turk-akimi-zirvesi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-38007\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/budapestede-turk-akimi-zirvesi-300x169.jpg\" alt=\"turk-akimi\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/budapestede-turk-akimi-zirvesi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/budapestede-turk-akimi-zirvesi-500x282.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/budapestede-turk-akimi-zirvesi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/budapestede-turk-akimi-zirvesi.jpg 513w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>u. Yat\u0131r\u0131m ile ilgili durumlar b\u00fcy\u00fck oranda \u00e7\u00f6z\u00fcme kavu\u015ftu. En \u00f6nemli unsur Rus taraf\u0131ndaki pompa istasyonu in\u015faat\u0131. Yat\u0131r\u0131m ruble cinsinden yap\u0131lacak bu nedenle s\u0131k\u0131nt\u0131yla kar\u015f\u0131la\u015f\u0131lmas\u0131 m\u00fcmk\u00fcn de\u011fil. B\u00fct\u00fcn borular \u015fu anda sat\u0131n al\u0131nd\u0131. Bir tak\u0131m ek masraflar s\u00f6z konusu olacak ama bu ek masraflar\u0131n mevcut projeyi geciktirmesi m\u00fcmk\u00fcn de\u011fil\u201d dedi.<\/p>\n<p style=\"color: #000000;\">H\u00fck\u00fcmetler aras\u0131nda T\u00fcrk Ak\u0131m\u0131 anla\u015fmas\u0131 i\u00e7in tarih olup olmad\u0131\u011f\u0131n\u0131 sordu\u011fumuzda, Galkin, \u015funlar\u0131 s\u00f6yledi:<\/p>\n<p style=\"color: #000000;\">\u201cPek \u00e7ok \u015fey bizden ziyade T\u00fcrk taraf\u0131na ba\u011fl\u0131. Biz kendi a\u00e7\u0131m\u0131zdan b\u00fct\u00fcn evraklar\u0131 tamamlad\u0131k, Enerji Bakan\u0131 Taner Y\u0131ld\u0131z\u2019a g\u00f6nderdik. Bir nevi top art\u0131k T\u00fcrk taraf\u0131nda. S\u00f6z konusu anla\u015fma y\u00fcr\u00fcrl\u00fc\u011fe girdikten sonra t\u00fcm y\u00fck\u00fcml\u00fcl\u00fckleri h\u0131zl\u0131 bir \u015fekilde yerine getirmeye haz\u0131r\u0131z.\u201d<\/p>\n<p style=\"color: #000000;\">T\u00fcrk taraf\u0131ndan herhangi bir itilaf\u0131n \u015fu an i\u00e7in s\u00f6z konusu olmad\u0131\u011f\u0131n\u0131 belirten Galkin, \u201cProjeyi g\u00f6ndermemizin \u00fczerinden uzun bir zaman ge\u00e7medi. \u0130ncelendikten sonra bu konuyu g\u00f6r\u015febiliriz. Ama \u015fu an Bota\u015f ve Gazprom teknik haz\u0131rl\u0131klar\u0131 yapabilir. B\u00fcrokratik s\u00fcreci beklemek zorunda de\u011filler\u201d dedi. Galkin, Yunanistan\u2019\u0131n ise projede da\u011f\u0131t\u0131m merkezi de\u011fil, ge\u00e7i\u015f noktas\u0131 ve transfer altyap\u0131s\u0131 olaca\u011f\u0131n\u0131 s\u00f6yledi.<\/p>\n<p style=\"color: #000000;\">Kaynak:\u00a0<a style=\"color: #c75615;\" href=\"http:\/\/www.milliyet.com.tr\/turk-akimi-nda-top-turkiye-de\/ekonomi\/detay\/2048840\/default.htm\" target=\"_blank\" rel=\"nofollow\">milliyet<\/a><\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Rusya Enerji Bakanl\u0131\u011f\u0131 Ulusal \u0130\u015fbirli\u011fi Direkt\u00f6r\u00fc Ilya Galkin, T\u00fcrk Ak\u0131m\u0131 anla\u015fmas\u0131 i\u00e7in \u201cB\u00fct\u00fcn evraklar\u0131 tamamlad\u0131k, g\u00f6nderdik. Art\u0131k top T\u00fcrk taraf\u0131nda\u201d dedi. Ilya [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":38007,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[1026,92,226,63,67,1009,2698,165,22538,2587,4221,885,20076,846],"views":645,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38584"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=38584"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38584\/revisions"}],"predecessor-version":[{"id":38585,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38584\/revisions\/38585"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/38007"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=38584"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=38584"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=38584"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}