{"id":38563,"date":"2015-04-23T13:38:24","date_gmt":"2015-04-23T10:38:24","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=38563"},"modified":"2015-04-23T13:38:24","modified_gmt":"2015-04-23T10:38:24","slug":"2015-cinde-nukleer-yili-olacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/2015-cinde-nukleer-yili-olacak\/","title":{"rendered":"(Turkish) 2015 \u00c7in`de N\u00fckleer Y\u0131l\u0131 Olacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/38563\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u00c7in`de 2015 y\u0131l\u0131nda 8 n\u00fckleer reakt\u00f6r\u00fcn ticari faaliyete ge\u00e7ebilece\u011fi ifade edildi.<\/strong><\/p>\n<p>\u00c7in N\u00fckleer Sanayii Birli\u011fi (CNIA)`nin yay\u0131nlad\u0131\u011f\u0131 y\u0131ll\u0131k rapora g\u00f6re,2020 kapasite hedeflerine ula\u015fmak isteyen \u00c7in, bu y\u0131l tarihinin en b\u00fcy\u00fck y\u0131ll\u0131k y\u00fckseli\u015fini yakalayarak 6-8 yeni n\u00fckleer reakt\u00f6r i\u00e7in onay verecek.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/2015-cinde-nukleer-yili-olacak.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-38564\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/2015-cinde-nukleer-yili-olacak-300x170.jpg\" alt=\"2015-cinde-nukleer-yili-olacak\" width=\"300\" height=\"170\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/2015-cinde-nukleer-yili-olacak-300x170.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/2015-cinde-nukleer-yili-olacak-500x283.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/2015-cinde-nukleer-yili-olacak-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/2015-cinde-nukleer-yili-olacak.jpg 900w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Birlik Genel Sekreteri Zhang Huazhu,ayr\u0131ca \u00c7in`in, bu y\u0131l 8 n\u00fckleer reakt\u00f6r\u00fcn de ticari faaliyete ge\u00e7ebilece\u011fini ifade etti.<\/p>\n<p>\u00c7in mevcut durumda 21.4 GW kurulum kapasiteli 23 reakt\u00f6r \u00e7al\u0131\u015f\u0131r durumda. Yap\u0131m a\u015famas\u0131nda olan 26 reakt\u00f6r ile 28.5 GW ek kapasite sa\u011flanacak. Ancak Fuku\u015fima n\u00fckleer felaketi sonras\u0131 kabullerin zorla\u015fmas\u0131 nedeniyle \u00fclkenin 58 GW olan 2020 hedefine ula\u015fmas\u0131 zor olabilir.<\/p>\n<p>\u00c7in`de ge\u00e7en y\u0131l n\u00fckleer enerji sekt\u00f6r\u00fcndeki yat\u0131r\u0131mlar bir \u00f6nceki y\u0131la g\u00f6re % 6.6 azalarak 9.18 milyar dolar olarak ger\u00e7ekle\u015fti. Ayr\u0131ca ge\u00e7en y\u0131l hi\u00e7 bir n\u00fckleer proje onaylanmad\u0131.<\/p>\n<p>\u00c7in ge\u00e7en y\u0131l T\u00fcrkiye, Pakistan, Romanya, G\u00fcney Afrika, \u00c7ek Cumhuriyeti ve Suudi Arabistan ile n\u00fckleer i\u015fbirli\u011fi anla\u015fmas\u0131 imzalad\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/2015-cinde-nukleer-yili-olacak_13300.html#.VTjP-tLtmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00c7in`de 2015 y\u0131l\u0131nda 8 n\u00fckleer reakt\u00f6r\u00fcn ticari faaliyete ge\u00e7ebilece\u011fi ifade edildi. \u00c7in N\u00fckleer Sanayii Birli\u011fi (CNIA)`nin yay\u0131nlad\u0131\u011f\u0131 y\u0131ll\u0131k rapora g\u00f6re,2020 kapasite hedeflerine ula\u015fmak [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":38564,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[886,22534,63,67,1009,2698,165,71,21,14402],"views":862,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38563"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=38563"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38563\/revisions"}],"predecessor-version":[{"id":38565,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38563\/revisions\/38565"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/38564"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=38563"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=38563"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=38563"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}