{"id":38493,"date":"2015-04-21T13:36:12","date_gmt":"2015-04-21T10:36:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=38493"},"modified":"2015-05-23T14:35:12","modified_gmt":"2015-05-23T11:35:12","slug":"kurulu-gucumuze-12-yilda-38-bin-megavat-ekledik","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kurulu-gucumuze-12-yilda-38-bin-megavat-ekledik\/","title":{"rendered":"(Turkish) \u201cKurulu G\u00fcc\u00fcm\u00fcze 12 Y\u0131lda 38 Bin Megavat Ekledik&#8230;\u201d"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/38493\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #363636;\"><strong>Enerji ve Tabii Kaynaklar Bakan\u0131 Taner Y\u0131ld\u0131z, \u201c12 y\u0131l \u00f6nce, ilk 100 y\u0131lda yap\u0131lan 31 bin 800 megavatl\u0131k kurulu g\u00fcce son 12 y\u0131lda 38 bin 800 megavat daha ekledik. \u015eu an T\u00fcrkiye\u2019de 70 bin 550 megavat kurulu g\u00fc\u00e7 oldu. Amac\u0131m\u0131z 2023 y\u0131l\u0131na 110 bin megavatlarla girmek\u201d dedi.<\/strong><\/p>\n<p style=\"color: #363636;\">Y\u0131ld\u0131z, Kayseri Organize Sanayi B\u00f6lgesi (KOSB) G\u00fcne\u015f Enerjisi Santrali\u2019nin a\u00e7\u0131l\u0131\u015f t\u00f6reninde, y\u0131llardan<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/kurulu-gucumuze-12-yilda-38-bin-megavat-ekledik.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-38494\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/kurulu-gucumuze-12-yilda-38-bin-megavat-ekledik.jpg\" alt=\"kurulu-gucumuze-12-yilda-38-bin-megavat-ekledik\" width=\"327\" height=\"236\" \/><\/a> bu yana u\u011fra\u015ft\u0131klar\u0131 konular\u0131n meyvesini almaya ba\u015flad\u0131klar\u0131n\u0131 s\u00f6yledi.<\/p>\n<p style=\"color: #363636;\">T\u00fcrkiye\u2019nin enerji ihtiyac\u0131n\u0131n yenilenebilir kaynaklardan kar\u015f\u0131lanma oran\u0131n\u0131n gittik\u00e7e artt\u0131\u011f\u0131n\u0131 belirten Y\u0131ld\u0131z, daha da art\u0131rmaya \u00e7al\u0131\u015ft\u0131klar\u0131n\u0131 vurgulad\u0131.<\/p>\n<p style=\"color: #363636;\">Y\u0131ld\u0131z, T\u00fcrkiye\u2019nin yenilenebilir enerji kaynaklar\u0131ndan faydalanma oran\u0131n\u0131n AB \u00fcyesi \u00fclkelerden daha fazla oldu\u011funu vurgulayarak, \u015funlar\u0131 kaydetti:<\/p>\n<p style=\"color: #363636;\">\u201cAB \u00fcyesi \u00fclkelerin su, r\u00fczgar, g\u00fcne\u015f, jeotermal, biyok\u00fctle gibi yenilenebilir enerji kaynaklar\u0131ndan yararlanma oranlar\u0131 13,5 civar\u0131nda. T\u00fcrkiye\u2019de bu, y\u00fczde 25-26\u2032lar seviyesinde. Almanya, bug\u00fcn enerjiyi y\u00fczde 51\u2032den fazla k\u00f6m\u00fcrden \u00fcretme karar\u0131 ald\u0131. 2021 y\u0131l\u0131nda haz\u0131rl\u0131klar\u0131n\u0131 buna g\u00f6re yap\u0131yor ama bizdeki Almanya alg\u0131s\u0131 ne? \u2018Her taraf ye\u015fillik, r\u00fczgarlardan, g\u00fcne\u015f kolekt\u00f6rlerinden enerji elde ediliyor\u2019 \u015feklinde. \u015eimdi parayla yerli kaynaklar aras\u0131nda \u00e7ok \u00f6nemli bir ba\u011f var. E\u011fer g\u00fcne\u015f kolekt\u00f6rleriyle alakal\u0131 yat\u0131r\u0131m\u0131 daha \u00f6nce yapsayd\u0131k, \u015fu anda buradan elde edece\u011fimiz elektri\u011fin tam \u00fc\u00e7 kat\u0131 olacakt\u0131. 12 y\u0131l \u00f6nce ilk 100 y\u0131lda yap\u0131lan 31 bin 800 megavatl\u0131k kurulu g\u00fcce son 12 y\u0131lda 38 bin 800 megavat daha ekledik. \u015eu an T\u00fcrkiye\u2019de 70 bin 550 megavat kurulu g\u00fc\u00e7 oldu. Amac\u0131m\u0131z 2023 y\u0131l\u0131na 110 bin megavatlarla girmek. \u0130n\u015fallah bunu ger\u00e7ekle\u015ftiririz.\u201d<\/p>\n<p style=\"color: #363636;\"><strong>KOSB Y\u00f6netim Kurulu Ba\u015fkan\u0131 Hasy\u00fcnc\u00fc<\/strong><\/p>\n<p style=\"color: #363636;\">KOSB Y\u00f6netim Kurulu Ba\u015fkan\u0131 Ahmet Hasy\u00fcnc\u00fc Kayseri\u2019de g\u00fcne\u015ften yararlanma s\u00fcresinin bin 550 saati yakalad\u0131\u011f\u0131n\u0131 belirterek s\u00f6zlerini \u015f\u00f6yle s\u00fcrd\u00fcrd\u00fc:<\/p>\n<p style=\"color: #363636;\">\u201cO kadar sanayicinin riskini almamak i\u00e7in \u00f6nce kendi firmamda bir megavat lisanss\u0131z g\u00fcne\u015f enerjisi sistemi kurdum ve T\u00fcrkiye\u2019de ilk defa bir megavat lisanss\u0131z enerji \u00fcretimine ba\u015flad\u0131k. Bir y\u0131l\u0131 doldurdu\u011fu andan itibaren bin 560 saati yakalad\u0131k. \u00c7at\u0131 yerine araziye kurdu\u011fumuzda bin 800 saati yakalayaca\u011f\u0131m\u0131z\u0131 d\u00fc\u015f\u00fcn\u00fcyoruz. B\u00f6lgemizde de 400 bin metrekarelik alan\u0131n tamam\u0131n\u0131 g\u00fcne\u015f enerjisi santraline ay\u0131rm\u0131\u015f olduk. Devreye alaca\u011f\u0131m\u0131z 7 megavat\u0131n tamam\u0131 b\u00f6lgemiz taraf\u0131ndan finanse edilmi\u015f, herhangi bir kredi ve te\u015fvik kullan\u0131lmam\u0131\u015ft\u0131r. Yapm\u0131\u015f oldu\u011fumuz hesaba g\u00f6re maliyeti bize 6,5 milyon dolar olan tesisten y\u0131lda 1,5 milyon dolarl\u0131k enerji elde edece\u011fiz.\u201d<\/p>\n<p style=\"color: #363636;\">Kaynak: AA<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji ve Tabii Kaynaklar Bakan\u0131 Taner Y\u0131ld\u0131z, \u201c12 y\u0131l \u00f6nce, ilk 100 y\u0131lda yap\u0131lan 31 bin 800 megavatl\u0131k kurulu g\u00fcce son 12 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":38494,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[710,1678,63,67,1009,2698,165,227,2569,58,12865,1663,69,99,667,4198],"views":995,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38493"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=38493"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38493\/revisions"}],"predecessor-version":[{"id":38495,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38493\/revisions\/38495"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/38494"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=38493"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=38493"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=38493"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}