{"id":38203,"date":"2015-04-14T12:19:46","date_gmt":"2015-04-14T09:19:46","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=38203"},"modified":"2015-04-14T12:19:46","modified_gmt":"2015-04-14T09:19:46","slug":"yildiz-akkuyu-nukleer-santrali-takviminde-degisiklik-yok","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yildiz-akkuyu-nukleer-santrali-takviminde-degisiklik-yok\/","title":{"rendered":"(Turkish) Y\u0131ld\u0131z: \u201cAkkuyu N\u00fckleer Santrali Takviminde De\u011fi\u015fiklik Yok&#8230;\u201d"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/38203\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Enerji ve Tabii Kaynaklar Bakan\u0131 Y\u0131ld\u0131z, Akkuyu n\u00fckleer santralinin tamamlanmas\u0131 ile ilgili, \u201c\u015eu anda takvimde Rosatom taraf\u0131ndan, taraf\u0131m\u0131za \u00f6ng\u00f6r\u00fclm\u00fc\u015f bir de\u011fi\u015fiklik bulunmamaktad\u0131r\u201d dedi.<\/strong><\/p>\n<p>Y\u0131ld\u0131z, Ankara, Hacettepe ve \u0130stanbul Teknik \u00dcniversitesi ile Rusya\u2019n\u0131n Mephi \u00dcniversitesi aras\u0131nda n\u00fckleer enerji e\u011fitimi alan\u0131nda i\u015fbirli\u011fi anla\u015fmalar\u0131n\u0131n imzalanmas\u0131n\u0131n ard\u0131ndan bas\u0131n mensuplar\u0131n\u0131n sorular\u0131n\u0131 yan\u0131tlad\u0131.<span id=\"more-71121\"><\/span><\/p>\n<p>Y\u0131ld\u0131z, \u00fclke genelinde ya\u015fanan elektrik kesintilerine y\u00f6nelik soru \u00fczerine, \u201cHerhangi bir \u015firketin \u2018Ben elektri\u011fi <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/yildiz-akkuyu-nukleer-santrali-takviminde-degisiklik-yok.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-38204 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/yildiz-akkuyu-nukleer-santrali-takviminde-degisiklik-yok-300x200.jpg\" alt=\"yildiz-akkuyu-nukleer-santrali-takviminde-degisiklik-yok\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/yildiz-akkuyu-nukleer-santrali-takviminde-degisiklik-yok-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/yildiz-akkuyu-nukleer-santrali-takviminde-degisiklik-yok-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/yildiz-akkuyu-nukleer-santrali-takviminde-degisiklik-yok-74x50.jpg 74w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/yildiz-akkuyu-nukleer-santrali-takviminde-degisiklik-yok.jpg 775w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\u015fu anda veriyorum, 3 saat sonra vermiyorum\u2019 deme yetkisi bulunmamaktad\u0131r. Bunun bir mekanizmas\u0131 var\u201d kar\u015f\u0131l\u0131\u011f\u0131n\u0131 verdi.<\/p>\n<p>\u00dcretim santrallerinin g\u00fcn \u00f6ncesinde verdikleri fiyat tekliflerine g\u00f6re s\u0131raland\u0131klar\u0131n\u0131 anlatan Y\u0131ld\u0131z, \u015funlar\u0131 s\u00f6yledi:<\/p>\n<p>\u201cBu asl\u0131nda T\u00fcrkiye\u2019deki arz\u0131n talepten daha \u00e7ok oldu\u011funu g\u00f6steriyor. B\u00f6lge olarak, stratejik olarak 1 nolu talimat dedi\u011fimiz konu kar\u015f\u0131s\u0131nda arkada\u015flar\u0131m\u0131z gerekli \u00f6nlemleri ald\u0131lar. Amac\u0131m\u0131z \u00f6zel sekt\u00f6r i\u00e7in ne \u00e7ok a\u015f\u0131r\u0131 kar etmek ne de zarar etmek. Her ikisi de olmas\u0131n, makul fiyatla versinler ve T\u00fcrkiye\u2019nin enerjiyle alakal\u0131 b\u00fct\u00fcn yap\u0131lanmas\u0131n\u0131 hep beraber sa\u011flam\u0131\u015f olsunlar.\u201d<\/p>\n<p>Y\u0131ld\u0131z, son iki y\u0131ldan beri T\u00fcrkiye\u2019de elektrik \u00fcretim \u015firketlerinin arz fazlal\u0131\u011f\u0131 bulundu\u011funa dikkati \u00e7ekti.<\/p>\n<p>Bu y\u0131l ya\u011f\u0131\u015f oranlar\u0131n\u0131n artt\u0131\u011f\u0131n\u0131 belirten Y\u0131ld\u0131z, \u015funlar\u0131 kaydetti:<\/p>\n<p>\u201c\u015eu anda \u00fclkemizin ald\u0131\u011f\u0131 ya\u011f\u0131\u015flar, \u00f6zellikle HES\u2019lerin \u00e7al\u0131\u015f\u0131lmas\u0131na d\u00f6n\u00fckt\u00fcr. 2014 y\u0131l\u0131ndan daha fazla HES \u00e7al\u0131\u015f\u0131l\u0131yor. Su kaynaklar\u0131ndan elde etti\u011fimiz HES\u2019ler, asl\u0131nda tercih etti\u011fimiz do\u011falgaz ithalat\u0131ndan daha \u00f6nceki \u00fcretimlerdir. Suyun enerjisini almadan ak\u0131tmamal\u0131y\u0131z. Sudan elektrik elde ettikten sonra ak\u0131tmal\u0131y\u0131z.<\/p>\n<p>Do\u011falgaz santrallerinin HES\u2019lerle rekabet edemedi\u011fi bug\u00fcn\u00fcn ger\u00e7e\u011fi de\u011fildir. 10 y\u0131l \u00f6nce de 30 y\u0131l \u00f6nce de b\u00f6yleydi. Biz b\u00fct\u00fcn santrallerin, rekabet ortam\u0131nda bu piyasay\u0131 olu\u015fturmas\u0131n\u0131 istiyoruz. Genellikle \u00fcretim santralleri i\u00e7in elektrik fiyatlar\u0131n\u0131n y\u00fckselmemesi laz\u0131m geldi\u011fini s\u00f6yleyen kamuoyu, \u015fu anda \u2018ni\u00e7in elektrik fiyatlar\u0131 d\u00fc\u015f\u00fck\u2019 tarz\u0131nda davran\u0131yor.\u201d<\/p>\n<p><strong>\u201cAkkuyu n\u00fckleer santrali takviminde de\u011fi\u015fiklik yok\u201d<\/strong><\/p>\n<p>Y\u0131ld\u0131z, Akkuyu n\u00fckleer santralinin in\u015fas\u0131nda gecikme olup olmayaca\u011f\u0131na y\u00f6nelik soru \u00fczerine, \u201c\u015eu anda takvimde Rosatom taraf\u0131ndan, taraf\u0131m\u0131za \u00f6ng\u00f6r\u00fclm\u00fc\u015f bir de\u011fi\u015fiklik bulunmamaktad\u0131r\u201d yan\u0131t\u0131n\u0131 verdi.<\/p>\n<p>Akkuyu\u2019da, T\u00fcrkiye\u2019nin en b\u00fcy\u00fck projesini ger\u00e7ekle\u015ftirdiklerini vurgulayan Y\u0131ld\u0131z, \u201cKar\u015f\u0131l\u0131kl\u0131 gerek\u00e7eler var. Malum, biz gerek k\u0131y\u0131 \u015feridi gerekse enerji piyasas\u0131 ile alakal\u0131 kanuni d\u00fczenlemelerle ilgili kanun tasar\u0131s\u0131n\u0131 TBMM\u2019nin onay\u0131na sunmu\u015ftuk. Kanun tasar\u0131s\u0131 yeti\u015fmedi. Meclis a\u00e7\u0131ld\u0131ktan sonra g\u00fcndeme gelecek ilk kanun tasar\u0131s\u0131 olur\u201d diye konu\u015ftu.<\/p>\n<p>Y\u0131ld\u0131z, \u015funlar\u0131 belirtti:<\/p>\n<p>\u201cEn \u00f6nemli ba\u015fl\u0131\u011f\u0131n g\u00fcvenlik k\u0131sm\u0131 oldu\u011funa inan\u0131yorum. Fuku\u015fima\u2019dan sonra, g\u00fcvenlik \u00f6nlemlerinin \u00e7ok daha art\u0131r\u0131ld\u0131\u011f\u0131n\u0131 ve bunla alakal\u0131 bir k\u0131s\u0131m proje de\u011fi\u015fikli\u011fine gidildi\u011fini kamuoyuyla payla\u015fm\u0131\u015ft\u0131k. Her iki \u00fclkenin de menfaatine olan, bu projenin bir an \u00f6nce bitmesidir. Biz, Rosatom\u2019la beraber, birbirimizin i\u015fini kolayla\u015ft\u0131raca\u011f\u0131z ve riskleri olabildi\u011fince azaltaca\u011f\u0131z.\u201d<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Enerji ve Tabii Kaynaklar Bakan\u0131 Y\u0131ld\u0131z, Akkuyu n\u00fckleer santralinin tamamlanmas\u0131 ile ilgili, \u201c\u015eu anda takvimde Rosatom taraf\u0131ndan, taraf\u0131m\u0131za \u00f6ng\u00f6r\u00fclm\u00fc\u015f bir de\u011fi\u015fiklik bulunmamaktad\u0131r\u201d dedi. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":38204,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[1026,2674,710,63,67,1009,2698,165,22375,35370,7728,22376,71,21,7033,2587,22377,667],"views":940,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38203"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=38203"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38203\/revisions"}],"predecessor-version":[{"id":38205,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38203\/revisions\/38205"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/38204"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=38203"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=38203"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=38203"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}