{"id":38081,"date":"2015-04-10T08:35:00","date_gmt":"2015-04-10T05:35:00","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=38081"},"modified":"2015-04-10T08:35:00","modified_gmt":"2015-04-10T05:35:00","slug":"ardahandaki-akinci-hes-kapasite-artiriyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ardahandaki-akinci-hes-kapasite-artiriyor\/","title":{"rendered":"(Turkish) Ardahan`daki Ak\u0131nc\u0131 HES Kapasite Art\u0131r\u0131yor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/38081\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><span style=\"color: #000000;\"><strong>Pelin Enerji taraf\u0131ndan Ardahan`da in\u015fa edilmekte olan 77,5 MW`l\u0131k Ak\u0131nc\u0131 (Kayabeyi) HES kapasite artt\u0131racak.<\/strong>\u00a0<\/span><br style=\"color: #000000;\" \/><br style=\"color: #000000;\" \/><span style=\"color: #000000;\">Pelin Enerji Yat\u0131r\u0131m \u00dcretim ve Tic. A.\u015e. taraf\u0131ndan Ardahan ili \u00c7\u0131ld\u0131r il\u00e7esi s\u0131n\u0131rlar\u0131 i\u00e7inde Aras Nehri\u2019nin kollar\u0131ndan Kura Nehri \u00fczerinde kurulan 77,5 MW kurulum kapasitesine sahip Kayabeyi Baraj\u0131 ve Ak\u0131nc\u0131 HES kapasite art\u0131\u015f\u0131na gidiyor.\u00a0<\/span><br style=\"color: #000000;\" \/><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/ardahandaki-akinci-hes-kapasite-artiriyor.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-38082\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/ardahandaki-akinci-hes-kapasite-artiriyor-300x173.jpg\" alt=\"ardahandaki-akinci-hes-kapasite-artiriyor\" width=\"300\" height=\"173\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/ardahandaki-akinci-hes-kapasite-artiriyor-300x173.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/ardahandaki-akinci-hes-kapasite-artiriyor-80x46.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/ardahandaki-akinci-hes-kapasite-artiriyor.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><br style=\"color: #000000;\" \/><span style=\"color: #000000;\">T\u00fcrkerler \u0130n\u015faat taraf\u0131ndan yap\u0131m\u0131 \u00fcstlenilen Kayabeyi Baraj\u0131 ve Ak\u0131nc\u0131 HES`in, y\u0131lda yakla\u015f\u0131k 300 GWh elektrik \u00fcretmesi hedeflenmi\u015fti. 2008 y\u0131l\u0131nda lisans\u0131 al\u0131nan projenin in\u015faat\u0131na, 2010 y\u0131l\u0131nda ba\u015flanm\u0131\u015ft\u0131r ve 2014 y\u0131l\u0131nda tamamlanmas\u0131 planlanan projenin yap\u0131m\u0131 halen devam ediyor.\u00a0<\/span><br style=\"color: #000000;\" \/><br style=\"color: #000000;\" \/><strong><span style=\"color: #000000;\">\u00c7ED S\u00dcREC\u0130 BA\u015eLADI<\/span><\/strong><br style=\"color: #000000;\" \/><br style=\"color: #000000;\" \/><span style=\"color: #000000;\">\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fcn\u00fcn internet sitesinde konu ile ilgili yap\u0131lan a\u00e7\u0131klamada, kapasite art\u0131\u015f projesiyle ilgili \u00c7ED S\u00fcreci`nin ba\u015flad\u0131\u011f\u0131 belirtildi.\u00a0<\/span><br style=\"color: #000000;\" \/><br style=\"color: #000000;\" \/><span style=\"color: #000000;\">A\u00e7\u0131klamada, &#8220;Kayabeyi Baraj\u0131 ve Ak\u0131nc\u0131 HES Kapasite Art\u0131\u015f\u0131 projesi ile ilgili olarak ARDAHAN Valili\u011fimize sunulan dosyay\u0131 PTD Dosyas\u0131 \u00c7evresel Etki De\u011ferlendirmesi Y\u00f6netmeli\u011fi`nin 17. maddesi do\u011frultusunda incelenmi\u015f ve uygun bulunmu\u015f olup, projeye ili\u015fkin \u00c7ED S\u00fcreci ba\u015flam\u0131\u015ft\u0131r.&#8221; denildi.<\/span><\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/ardahandaki-akinci-hes-kapasite-artiriyor_13123.html#.VSdlNdysUuw\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Pelin Enerji taraf\u0131ndan Ardahan`da in\u015fa edilmekte olan 77,5 MW`l\u0131k Ak\u0131nc\u0131 (Kayabeyi) HES kapasite artt\u0131racak.\u00a0Pelin Enerji Yat\u0131r\u0131m \u00dcretim ve Tic. A.\u015e. taraf\u0131ndan Ardahan ili [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":38082,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[22330,7836,5927,63,67,1009,2698,165,35370,1090,10764,22331],"views":1998,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38081"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=38081"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38081\/revisions"}],"predecessor-version":[{"id":38083,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/38081\/revisions\/38083"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/38082"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=38081"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=38081"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=38081"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}