{"id":37927,"date":"2020-04-13T16:05:12","date_gmt":"2020-04-13T13:05:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=37927"},"modified":"2020-04-20T02:12:54","modified_gmt":"2020-04-19T23:12:54","slug":"tedas-cati-ustu-gunes-enerjisi-sistemleri-ve-santrali-ges-projelendirme-ve-proje-basvuru-yonetimi-yapan-firmalar","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tedas-cati-ustu-gunes-enerjisi-sistemleri-ve-santrali-ges-projelendirme-ve-proje-basvuru-yonetimi-yapan-firmalar\/","title":{"rendered":"(Turkish) \u00c7at\u0131 \u00dcst\u00fc G\u00fcne\u015f Enerjisi Sistemleri ve G\u00fcne\u015f Santrali ( GES ) Projelendirme (TEDA\u015e) ve Proje Ba\u015fvuru Y\u00f6netimi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/37927\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>\u00c7at\u0131 \u00dcst\u00fc G\u00fcne\u015f Enerjisi Sistemleri ve G\u00fcne\u015f Santrali ( GES ) Projelendirme (TEDA\u015e) ve Proje Ba\u015fvuru Y\u00f6netimi<\/h1>\n<h2 style=\"text-decoration: underline;\">\u00c7at\u0131 \u00dcst\u00fc G\u00fcne\u015f Enerjisi Sistemleri ve G\u00fcne\u015f Santrali ( GES ) Projelendirme (TEDA\u015e) ve Proje Ba\u015fvuru Y\u00f6netimi Proje Ba\u015fvuru Y\u00f6netimi<\/h2>\n<p>Basamak 1.\u00a0Da\u011f\u0131t\u0131m Firmas\u0131 Onay\u0131 (\u00d6n Projelendirme)<br \/>\n<strong>Basamak 2. TEDA\u015e Proje Onay\u0131 (Kati Projelerin Haz\u0131rlanmas\u0131 ve TEDA\u015e Onay\u0131) &#8211; TEKL\u0130F KAPSAMINDA SUNULAN H\u0130ZMET BUDUR!<\/strong><br \/>\n<strong>Basamak 3.\u00a0<\/strong>Finansman sa\u011flanmas\u0131<br \/>\n<strong>Basamak 4.<\/strong> Sat\u0131n Alma ve Kurulum S\u00fcreci<br \/>\n<strong>Basamak 5.<\/strong> Devreye Alma<br \/>\n<strong><span style=\"text-decoration: underline;\">\u0130\u00c7ER\u0130K<br \/>\n<\/span><\/strong><br \/>\nT\u00fcm elektrik ve in\u015faat hesaplar\u0131n\u0131n ger\u00e7ekle\u015ftirilmesi, kurulacak yerle ilgili ba\u015fvuru belgelerinin haz\u0131rlanmas\u0131, ba\u015fvuracak yat\u0131r\u0131mc\u0131 bilgilerinin\u00a0tedarik ve y\u00f6netimi, TEDA\u015e&#8217;a bu belgelerin istenilen formatta teslim edilmesi, sonu\u00e7lar\u0131n takibi ve gerekli proje hesap revizyon taleplerinin ger\u00e7ekle\u015ftirilmesi, t\u00fcm onay mektubunun al\u0131nmas\u0131\u00a0s\u00fcre\u00e7lerini kapsayan ba\u015fvuru y\u00f6netimi partner ve \u00e7\u00f6z\u00fcm orta\u011f\u0131 firmalar\u0131m\u0131z ile g\u00fcvence alt\u0131ndad\u0131r.<\/p>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-86304\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/tedas-cati-ustu-gunes-enerjisi-sistemleri-ve-santrali-ges-projelendirme-ve-proje-basvuru-yonetimi-yapan-firmalar1-1024x532.jpg\" alt=\"\" width=\"573\" height=\"289\" \/><\/p>\n<p><strong>\u00c7at\u0131 \u00dcst\u00fc G\u00fcne\u015f Enerjisi Sistemleri ve G\u00fcne\u015f Santrali ( GES ) Projelendirme (TEDA\u015e) ve Proje Ba\u015fvuru Y\u00f6netimi PROJES\u0130\u00a0KAPSAMDAK\u0130 PAFTALAR<\/strong><\/p>\n<p>1-) Tesis Genel Yerle\u015fim Plan\u0131<br \/>\n2-) Onay kapsam\u0131ndaki yap\u0131lar\u0131n Mimari G\u00f6r\u00fcn\u00fc\u015fleri<br \/>\n3-) Onay Kapsam\u0131ndaki Yap\u0131lar\u0131n Kot Planlar\u0131<br \/>\n4-) Onay Kapsam\u0131ndaki Yap\u0131lar\u0131n Kesitleri<br \/>\n5-) Onay Kapsam\u0131ndaki Temellerin Projeleri<br \/>\n6-) Yang\u0131n Alg\u0131lama , Alarm ve S\u00f6nd\u00fcrme \u015eemas\u0131<br \/>\n7-) YG Tek Hat \u015eemas\u0131<br \/>\n\ud83d\ude0e AG Tek Hat \u015eemas\u0131<br \/>\n9-) YG\/AG Kablo Da\u011f\u0131t\u0131m Plan\u0131<br \/>\n10-) Trafolar\u0131n Plan Kesit ve G\u00f6r\u00fcn\u00fc\u015fleri<br \/>\n11-) H\u00fccre ve Panolar\u0131n Plan Kesit ve G\u00f6r\u00fcn\u00fc\u015fleri<br \/>\n12-) Topraklama ve Y\u0131ld\u0131r\u0131mdan Koruma Plan\u0131<br \/>\n13-) Ayd\u0131nlatma ve Acil Ayd\u0131nlatma Tek Hat \u015eemalar\u0131<\/p>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-86305\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/tedas-cati-ustu-gunes-enerjisi-sistemleri-ve-santrali-ges-projelendirme-ve-proje-basvuru-yonetimi-yapan-firmalar2.jpg\" alt=\"\" width=\"573\" height=\"273\" \/><\/p>\n<h2>\u00c7at\u0131 \u00dcst\u00fc G\u00fcne\u015f Enerjisi Sistemleri ve G\u00fcne\u015f Santrali ( GES ) Projelendirme (TEDA\u015e) ve Projesi Kapsam\u0131ndaki Belgeler ve Hesaplar<\/h2>\n<p>1-) Tesis Bilgi Formu<br \/>\n2-) Yetki Yaz\u0131s\u0131 ve Ekleri<br \/>\n3-) Lisans (EPDK Lisanslar\u0131 ile birlikte)<br \/>\n4-) Sistem Ba\u011flant\u0131 G\u00f6r\u00fc\u015f\u00fc<br \/>\n5-) Sistem Ba\u011flant\u0131 Anla\u015fmas\u0131<br \/>\n6-) \u00c7ED Belgesi (EDA\u015e Ba\u011flant\u0131 G\u00f6r\u00fc\u015f Onay Hizmet Kapsam\u0131ndad\u0131r, TEDA\u015e GES PROJELEND\u0130RME ve PROJE BA\u015eVURU Y\u00d6NET\u0130M\u0130 Hizmet Kapsam\u0131nda De\u011fildir)<br \/>\n7-) Fizibilite Raporu<br \/>\n\ud83d\ude0e Jeolojik Et\u00fct Raporu \/ Zemin Et\u00fct Raporu (Fiyata Dahil De\u011fildir)<br \/>\n9-) Standartlar Listesi<br \/>\n10-) (Elektromekanik Te\u00e7hizat i\u00e7in) S\u00f6zle\u015fme ve ekleri<br \/>\n11-) Tasar\u0131m Hesaplar\u0131<br \/>\n12-) Yap\u0131sal Tasar\u0131m Hesaplar\u0131 (\u0130n\u015faat)<br \/>\n13-) Santral \u00dcnitelerinin Performans E\u011frileri<\/p>\n<p><strong><span style=\"color: #993300;\">Teda\u015f \u00c7at\u0131 \u00dcst\u00fc G\u00fcne\u015f Enerjisi Sistemleri ve G\u00fcne\u015f Santrali ( GES ) Projelendirme (TEDA\u015e) ve Proje Ba\u015fvuru Y\u00f6netimi Projelendirme ve Ba\u015fvuru Y\u00f6netimi M\u00fchendislik Hizmet Bedeli:\u00a0<\/span><\/strong><span style=\"color: #000000;\">Sorun ve(ya) Fiyat Teklifi \u0130steyiniz.<\/span><\/p>\n<p><span style=\"color: #993300;\"><strong>Detayl\u0131 Bilgi \u0130\u00e7in<\/strong>&#8212;&gt;<\/span> \u0130leti\u015fim Formunu Doldurabilir ve(ya)\u00a0<a href=\"mailto:EnerjiYatirimDanismanligi@gmail.com\" target=\"_blank\" rel=\"noopener\">EnerjiYatirimDanismanligi@gmail.com<\/a> adresine mail atabilirsiniz.<\/p>\n<p><strong><span style=\"color: #993300;\">\u0130leti\u015fim Formunu Doldurun, Biz Sizi Arayal\u0131m!<\/span><\/strong><\/p>\n<div role=\"form\" class=\"wpcf7\" id=\"wpcf7-f112046-o1\" lang=\"tr-TR\" dir=\"ltr\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/en\/wp-json\/wp\/v2\/posts\/37927#wpcf7-f112046-o1\" method=\"post\" class=\"wpcf7-form init\" novalidate=\"novalidate\" data-status=\"init\">\n<div style=\"display: none;\">\n<input type=\"hidden\" name=\"_wpcf7\" value=\"112046\" \/>\n<input type=\"hidden\" name=\"_wpcf7_version\" value=\"5.5.6.1\" \/>\n<input type=\"hidden\" name=\"_wpcf7_locale\" value=\"tr_TR\" \/>\n<input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f112046-o1\" \/>\n<input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/>\n<input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<\/div>\n<p><label> Ad\u0131n\u0131z (gerekli)<br \/>\n    <span class=\"wpcf7-form-control-wrap your-name\"><input type=\"text\" name=\"your-name\" value=\"\" size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" \/><\/span> <\/label><\/p>\n<p><label> E-posta adresiniz (gerekli)<br \/>\n    <span class=\"wpcf7-form-control-wrap your-email\"><input type=\"email\" name=\"your-email\" value=\"\" size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-email wpcf7-validates-as-required wpcf7-validates-as-email\" aria-required=\"true\" aria-invalid=\"false\" \/><\/span> <\/label><\/p>\n<p><label> Konu<br \/>\n    <span class=\"wpcf7-form-control-wrap your-subject\"><input type=\"text\" name=\"your-subject\" value=\"\" size=\"40\" class=\"wpcf7-form-control wpcf7-text\" aria-invalid=\"false\" \/><\/span> <\/label><\/p>\n<p><label> \u0130letiniz<br \/>\n    <span class=\"wpcf7-form-control-wrap your-message\"><textarea name=\"your-message\" cols=\"40\" rows=\"10\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\"><\/textarea><\/span> <\/label><\/p>\n<p><input type=\"submit\" value=\"G\u00f6nder\" class=\"wpcf7-form-control has-spinner wpcf7-submit\" \/><\/p>\n<p style=\"display: none !important;\" class=\"akismet-fields-container\" data-prefix=\"_wpcf7_ak_\"><label>&#916;<textarea name=\"_wpcf7_ak_hp_textarea\" cols=\"45\" rows=\"8\" maxlength=\"100\"><\/textarea><\/label><input type=\"hidden\" id=\"ak_js_1\" name=\"_wpcf7_ak_js\" value=\"246\"\/><script>document.getElementById( \"ak_js_1\" ).setAttribute( \"value\", ( new Date() ).getTime() );<\/script><\/p><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div><\/form><\/div>\n<p><em>Detayl\u0131 <span style=\"text-decoration: underline;\">Bilgi Almak<\/span> \u0130\u00e7in <span style=\"text-decoration: underline;\">\u0130leti\u015fim Bilgileriniz \u0130le<\/span> Birlikte <span style=\"text-decoration: underline;\">Mesaj G\u00f6nderiniz<\/span> Taraf\u0131n\u0131za <span style=\"text-decoration: underline;\">24 Saat \u0130\u00e7erisinde<\/span> Geri D\u00f6n\u00fc\u015f Yap\u0131lacakt\u0131r.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u00c7at\u0131 \u00dcst\u00fc G\u00fcne\u015f Enerjisi Sistemleri ve G\u00fcne\u015f Santrali ( GES ) Projelendirme (TEDA\u015e) ve Proje Ba\u015fvuru Y\u00f6netimi \u00c7at\u0131 \u00dcst\u00fc G\u00fcne\u015f Enerjisi Sistemleri [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":37928,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4,18007],"tags":[45427,45434,45429,45428,45406,45430,19638,34980,26353,63,67,1009,2698,165,45431,45432,227,13,45433,22250,22249,22251],"views":9029,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37927"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=37927"}],"version-history":[{"count":23,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37927\/revisions"}],"predecessor-version":[{"id":74253,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37927\/revisions\/74253"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/37928"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=37927"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=37927"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=37927"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}