{"id":37910,"date":"2015-04-05T17:09:53","date_gmt":"2015-04-05T14:09:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=37910"},"modified":"2015-04-05T17:10:53","modified_gmt":"2015-04-05T14:10:53","slug":"konar-enerjinin-ges-projesine-yapi-kredi-leasing-destegi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/konar-enerjinin-ges-projesine-yapi-kredi-leasing-destegi\/","title":{"rendered":"(Turkish) Konar Enerji`nin GES Projesine Yap\u0131 Kredi Leasing Deste\u011fi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/37910\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Konar Enerji`nin Konya, Karaman ve Burdur`da yap\u0131lacak 20 MW`l\u0131k GES projesine Yap\u0131 Kredi Leasing finansman sa\u011flayacak.<\/strong><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/konar-enerjinin-ges-projesine-yapi-kredi-leasing-destegi.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-37911\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/konar-enerjinin-ges-projesine-yapi-kredi-leasing-destegi-300x224.jpg\" alt=\"konar-enerjinin-ges-projesine-yapi-kredi-leasing-destegi\" width=\"274\" height=\"195\" \/><\/a><\/p>\n<p>Enerji y\u00f6netim ve m\u00fchendislik \u015firketi Konar Enerji, Konya, Karaman ve Burdur`da ger\u00e7ekle\u015ftirece\u011fi20 MWp g\u00fcc\u00fcnde lisanss\u0131z g\u00fcne\u015f enerjisi projesinin ilk etab\u0131 olan 12 Mwp`l\u0131k k\u0131sm\u0131 i\u00e7in 18.9 milyon dolarl\u0131k finansman sa\u011flayacak Yap\u0131 Kredi Leasing ile anla\u015fma imzalad\u0131.<\/p>\n<p>Yap\u0131 Kredi Leasing ile Konar Enerji aras\u0131nda imzalanan finansal kiralama s\u00f6zle\u015fmesi ile Konya, Karaman ve Burdur`da yap\u0131lacak lisanss\u0131z g\u00fcne\u015f enerjisi yat\u0131r\u0131m\u0131n\u0131n 18.9 milyon dolarl\u0131k b\u00f6l\u00fcm\u00fc Yap\u0131 Kredi Leasing taraf\u0131ndan finanse edilecek.<\/p>\n<p>S\u00f6z konusu finansman, leasing ile g\u00fcne\u015f enerjisine y\u00f6nelik en b\u00fcy\u00fck tutarl\u0131 i\u015flem olma \u00f6zelli\u011fi ta\u015f\u0131yor.<\/p>\n<p>Yay\u0131nc\u0131: <a href=\"https:\/\/www.enerjigazetesi.ist\" target=\"_blank\">Enerji Gazetesi<\/a><\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Konar Enerji`nin Konya, Karaman ve Burdur`da yap\u0131lacak 20 MW`l\u0131k GES projesine Yap\u0131 Kredi Leasing finansman sa\u011flayacak. Enerji y\u00f6netim ve m\u00fchendislik \u015firketi Konar Enerji, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":19347,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[4100,63,67,1009,2698,165,22244,1265,2326,7440,227,13,2569,1679,22243,2441,18193],"views":893,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37910"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=37910"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37910\/revisions"}],"predecessor-version":[{"id":37912,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37910\/revisions\/37912"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/19347"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=37910"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=37910"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=37910"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}