{"id":37877,"date":"2015-04-04T16:58:55","date_gmt":"2015-04-04T13:58:55","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=37877"},"modified":"2015-04-04T16:58:55","modified_gmt":"2015-04-04T13:58:55","slug":"akkuyu-hidroteknik-ihalesinde-4-firma-kaldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-hidroteknik-ihalesinde-4-firma-kaldi\/","title":{"rendered":"(Turkish) Akkuyu Hidroteknik \u0130halesinde 4 Firma Kald\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/37877\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Akkuyu N\u00fckleer A\u015e.\u2019nin deniz hidroteknik yap\u0131lar\u0131n\u0131n \u2018anahtar teslimi\u2019 projelendirilmesi ve in\u015fas\u0131 ihalesinde 4 grupla pazarl\u0131k a\u015famas\u0131na ge\u00e7ildi.<\/strong><\/p>\n<p>Akkuyu N\u00fckleer A\u015e\u2019den yap\u0131lan yaz\u0131l\u0131 a\u00e7\u0131klamaya g\u00f6re, ihale komisyonu gelen tekliflerin incelenme a\u015famas\u0131n\u0131 t<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/akkuyu-hidroteknik-ihalesinde-4-firma-kaldi.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-37878\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/akkuyu-hidroteknik-ihalesinde-4-firma-kaldi.jpg\" alt=\"akkuyu-hidroteknik-ihalesinde-4-firma-kaldi\" width=\"300\" height=\"220\" \/><\/a>amamlad\u0131.<\/p>\n<p>Hidroteknik yap\u0131lar i\u00e7in teklif veren 9 firma ve ortak giri\u015fim grubundan 4 tanesinden 7 Nisan saat 17.00\u2032a kadar yeni teklif al\u0131nmas\u0131 kararla\u015ft\u0131r\u0131ld\u0131.<\/p>\n<p>Pazarl\u0131k a\u015famas\u0131na kalan firmalar \u015funlar:<\/p>\n<p>&#8211; STFA \u2013 Makyol \u2013 R\u00f6nesans Ortak Giri\u015fim Grubu<\/p>\n<p>Kolin \u0130n\u015faat Turizm Sanayi ve Ticaret A\u015e<\/p>\n<p>Cengiz \u0130n\u015faat Sanayi ve Ticaret A\u015e<\/p>\n<p>IC \u0130\u00e7ta\u015f \u0130n\u015faat Sanayi ve Ticaret A\u015e<\/p>\n<p>\u0130hale konusu i\u015fler aras\u0131nda Akkuyu n\u00fckleer santralinin liman\u0131 ve di\u011fer hidroteknik yap\u0131lar\u0131n\u0131n projelendirilmesi ve in\u015fas\u0131n\u0131 kaps\u0131yor.<\/p>\n<p>Kaynak: AA<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Akkuyu N\u00fckleer A\u015e.\u2019nin deniz hidroteknik yap\u0131lar\u0131n\u0131n \u2018anahtar teslimi\u2019 projelendirilmesi ve in\u015fas\u0131 ihalesinde 4 grupla pazarl\u0131k a\u015famas\u0131na ge\u00e7ildi. Akkuyu N\u00fckleer A\u015e\u2019den yap\u0131lan yaz\u0131l\u0131 a\u00e7\u0131klamaya [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":37878,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[5145,19126,63,67,1009,2698,165,2054,71,21,3154],"views":751,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37877"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=37877"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37877\/revisions"}],"predecessor-version":[{"id":37879,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37877\/revisions\/37879"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/37878"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=37877"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=37877"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=37877"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}