{"id":37788,"date":"2015-04-01T15:49:07","date_gmt":"2015-04-01T12:49:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=37788"},"modified":"2015-04-01T15:49:07","modified_gmt":"2015-04-01T12:49:07","slug":"elektrik-kesintisinin-saatlik-zarari-100-milyon-dolar","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/elektrik-kesintisinin-saatlik-zarari-100-milyon-dolar\/","title":{"rendered":"(Turkish) Elektrik Kesintisinin Saatlik Zarar\u0131 100 Milyon Dolar&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/37788\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #000000;\"><strong>Elektrik kesintisi, \u00fcr\u00fcnlerin tam zaman\u0131nda teslimi anlam\u0131na gelen \u2018Just in Time\u2019da aksamaya neden oldu. Jenerat\u00f6rler \u00e7aresiz kald\u0131. A\u011f\u0131r sanayinin kalbi Kocaeli\u2019nde 6 bin firmada \u00fcretim durdu. Saatlik zarar 100 milyon dolar\u2026<\/strong><span id=\"more-70958\"><\/span><\/p>\n<p style=\"color: #000000;\">T\u00fcrkiye\u2019de 79 ilde ya\u015fanan elektrik kesintisi sanayiyi de olumsuz etkiledi. Ba\u015fta \u0130stanbul, Bursa, Kocaeli, Tekirda\u011f, Konya ve Gaziantep olmak \u00fczere T\u00fcrkiye\u2019nin dev sanayi kentlerinde uzun s\u00fcre \u00e7arklar durdu. Baz\u0131 fabrikalar jenerat\u00f6rler yard\u0131m\u0131yla \u00fcretime devam etmeye \u00e7al\u0131\u015ft\u0131. Elektrik kesintisinin en a\u011f\u0131r faturas\u0131 ise otomotiv ve demir-\u00e7elik gibi <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/elektrik-kesintisinin-saatlik-zarari-100-milyon-dolar.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-37789 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/elektrik-kesintisinin-saatlik-zarari-100-milyon-dolar-300x128.jpg\" alt=\"elektrik-kesintisinin-saatlik-zarari-100-milyon-dolar\" width=\"300\" height=\"128\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/elektrik-kesintisinin-saatlik-zarari-100-milyon-dolar-300x128.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/elektrik-kesintisinin-saatlik-zarari-100-milyon-dolar-500x214.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/elektrik-kesintisinin-saatlik-zarari-100-milyon-dolar-80x34.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/elektrik-kesintisinin-saatlik-zarari-100-milyon-dolar.jpg 870w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>a\u011f\u0131r sanayi tesislerinde ya\u015fand\u0131. Y\u00fcksek voltajda elektri\u011fe ihtiya\u00e7 duyan fabrikalarda jenerat\u00f6rler de \u00e7aresiz kal\u0131nca 10 saati a\u015fan \u00fcretim kesintileri ger\u00e7ekle\u015fti.<\/p>\n<p style=\"color: #000000;\">Kesintinin otomotiv sekt\u00f6r\u00fc i\u00e7in s\u0131k\u0131nt\u0131 yaratt\u0131\u011f\u0131n\u0131 belirten Ta\u015f\u0131t Ara\u00e7lar\u0131 Yan Sanayicileri Derne\u011fi Genel Koordinat\u00f6r\u00fc S\u00fcheyl Baybal\u0131, \u201cA\u011f\u0131rl\u0131kl\u0131 olarak Kocaeli, \u0130stanbul, Bursa, \u0130zmir ve Manisa\u2019da yo\u011funla\u015fan otomotiv sanayimizde \u00fcretimin durmas\u0131na sebep olan elektrik kesintisi, Just in Time (tam zaman\u0131nda \u00fcretim) ilkesini de kesintiye u\u011fratt\u0131\u201d dedi. En a\u011f\u0131r fatura da 6 bin fabrikan\u0131n \u00fcretim yapt\u0131\u011f\u0131 Kocaeli\u2019ne \u00e7\u0131kt\u0131. B\u00f6lgedeki fabrikalar\u0131 arayarak bilgi ald\u0131klar\u0131n\u0131 s\u00f6yleyen Kocaeli Sanayi Odas\u0131 Ba\u015fkan\u0131 Ayhan Zeytino\u011flu, \u201cB\u00fct\u00fcn hatlar kapal\u0131 oldu\u011fu i\u00e7in \u00fcretim yap\u0131lam\u0131yor. Enerji \u00fcretenler de enerji \u00fcretmiyor. Enerji de yok maalesef. \u00c7ok zor bir durum. Tam olarak ne oldu\u011funu da bilmiyoruz\u201d diye konu\u015ftu.<\/p>\n<p style=\"color: #000000;\">Ankara Sanayi Odas\u0131 Ba\u015fkan\u0131 Nurettin \u00d6zdebir ise elektrik kesintilerinin T\u00fcrkiye\u2019ye maliyetinin saatte 100 milyon dolar oldu\u011funu s\u00f6yledi. \u00d6zdebir, \u201cT\u00fcrkiye\u2019nin bir y\u0131ll\u0131k milli gelir \u00fcretimi 800 milyar dolar. Bunu 365 g\u00fcne b\u00f6lelim (ki tatil g\u00fcnlerini \u00e7\u0131karmam\u0131z gerekir ama \u00e7\u0131karmayal\u0131m), g\u00fcnl\u00fck \u00fcretim 2.2 milyar dolar oluyor. B\u00f6ylece kesinti nedeniyle 1 saatte T\u00fcrkiye\u2019nin ya\u015fad\u0131\u011f\u0131 \u00fcretim kayb\u0131 yakla\u015f\u0131k 100 milyon dolar oluyor\u201d \u015feklinde konu\u015ftu. Kesinti, Gaziantep\u2019te de \u00fcretimi durdurdu, binlerce i\u015f\u00e7i evlerine g\u00f6nderildi. U\u015fak\u2019ta ise 496 firma \u00fcretime ara vermek zorunda kald\u0131.<\/p>\n<p style=\"color: #000000;\">Kesintinin ard\u0131ndan Bulgaristan\u2019dan sa\u011flanan elektrikle \u00fcretime ilk ge\u00e7en santralin Limak Grubu\u2019na ait Hamitabat Do\u011falgaz \u00c7evrim Santrali oldu\u011fu \u00f6\u011frenildi. Saat 10:36\u2019da ya\u015fanan kesintinin ard\u0131ndan TE\u0130A\u015e\u2019\u0131n y\u00f6nlendirmesiyle Hamitabat\u2019a Bulgaristan 1 hatt\u0131ndan saat 11:14\u2019te elektrik sa\u011fland\u0131. Saat 11:39\u2019da Hamitabat A2 \u00fcnitesinde elektrik \u00fcretimi ba\u015flad\u0131, b\u00f6ylece di\u011fer \u00fcniteler de devreye girdi. Saat 13:20\u2019de 9 \u00fcnite devreye al\u0131narak sisteme 810 mw g\u00fc\u00e7 verildi. Bu sayede Trakya B\u00f6lgesi elektriksiz kalmad\u0131.<\/p>\n<p style=\"color: #000000;\">T\u00fcrkiye genelinde ya\u015fanan elektrik kesintisi Batman\u2019da petrol \u00fcretimini de durdurdu. TPAO Batman B\u00f6lge M\u00fcd\u00fcr\u00fc G\u00f6khan Ak\u0131n, uzun kesintiler y\u00fcz\u00fcnden petrol \u00fcretilemedi\u011fini s\u00f6yledi.<\/p>\n<p style=\"color: #000000;\">Maliye Bakanl\u0131\u011f\u0131\u2019n\u0131n a\u00e7\u0131klamas\u0131na g\u00f6re, elektrik kesintileri nedeniyle 2014\u2019e ait y\u0131ll\u0131k gelir vergisi beyannamelerinin verilmesi ve birinci taksit \u00f6demeleri i\u00e7in 2 Nisan Per\u015fembe g\u00fcn\u00fcne kadar s\u00fcre tan\u0131nd\u0131. (Sabah)<\/p>\n<p style=\"color: #000000;\">Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Elektrik kesintisi, \u00fcr\u00fcnlerin tam zaman\u0131nda teslimi anlam\u0131na gelen \u2018Just in Time\u2019da aksamaya neden oldu. Jenerat\u00f6rler \u00e7aresiz kald\u0131. A\u011f\u0131r sanayinin kalbi Kocaeli\u2019nde 6 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":37789,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[68,61,140,63,67,1009,2698,165,21047,22186,22187,22188],"views":844,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37788"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=37788"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37788\/revisions"}],"predecessor-version":[{"id":37790,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37788\/revisions\/37790"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/37789"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=37788"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=37788"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=37788"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}