{"id":37664,"date":"2015-03-28T14:33:34","date_gmt":"2015-03-28T11:33:34","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=37664"},"modified":"2015-03-28T14:33:34","modified_gmt":"2015-03-28T11:33:34","slug":"gap-kapsaminda-hesler-buyuk-potansiyele-sahip","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gap-kapsaminda-hesler-buyuk-potansiyele-sahip\/","title":{"rendered":"(Turkish) GAP Kapsam\u0131nda HES`ler B\u00fcy\u00fck Potansiyele Sahip&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/37664\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>GAP kapsam\u0131nda kamu ve \u00f6zel sekt\u00f6r taraf\u0131ndan yap\u0131lmas\u0131 planlanan 17 HES tamamland\u0131\u011f\u0131nda 40 milyar kWh elektrik \u00fcretilecek.<\/strong><\/p>\n<p>Devlet Su \u0130\u015fleri (DS\u0130) resmi internet sitesinde yer alan bilgilere g\u00f6re, GAP`ta yer alan HES projeleri tamamland\u0131\u011f\u0131nda 40 milyar kWh elektrik \u00fcretimi m\u00fcmk\u00fcn hale gelecek.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/gap-kapsaminda-hesler-buyuk-potansiyele-sahip.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-37665\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/gap-kapsaminda-hesler-buyuk-potansiyele-sahip-300x199.jpg\" alt=\"gap-kapsaminda-hesler-buyuk-potansiyele-sahip\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/gap-kapsaminda-hesler-buyuk-potansiyele-sahip-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/gap-kapsaminda-hesler-buyuk-potansiyele-sahip-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/gap-kapsaminda-hesler-buyuk-potansiyele-sahip.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>GAP kapsam\u0131nda bulunan Diyarbak\u0131r, Ad\u0131yaman, \u015eanl\u0131urfa, Gaziantep, Kilis, Mardin ve \u0130l\u00e7eleri, \u015e\u0131rnak ve \u0130dil \u0130l\u00e7esi ile Siirt ve \u0130l\u00e7elerinde, planlanm\u0131\u015f olan 17 hidroelektrik santrali bulunuyor. Bunlar\u0131n toplam kurulu g\u00fcc\u00fc 7.283 MW ve toplam enerji \u00fcretim potansiyelleri 26.803,45 GWh dir.<\/p>\n<p>Bug\u00fcn i\u00e7in bu projelerin 2.000 MW toplam kurulu g\u00fcc\u00fcndeki 3 adeti (Il\u0131su Baraj\u0131, Silvan Baraj\u0131, Ko\u00e7ali Baraj\u0131) in\u015fa halinde, 270 MW toplam kurulu g\u00fcc\u00fcndeki 2 adeti (B\u00fcy\u00fck\u00e7ay Baraj\u0131 ve Cizre Baraj\u0131) planlama a\u015famas\u0131nda, geri kalan 5.614 MW toplam kurulu g\u00fcc\u00fcndeki, 21 milyar kWh elektrik \u00fcretim potansiyeline haiz 12 adeti ise i\u015fletmede bulunuyor.<\/p>\n<p>GAP Projesi kapsam\u0131ndaki i\u015fletmedeki HES projelerinin \u00fcretimi \u00fclkemizdeki HES`lerin \u00fcretiminin yakla\u015f\u0131k % 30\u2019una ve t\u00fcm elektrik \u00fcretim potansiyelimizin ise yakla\u015f\u0131k % 10\u2019una kar\u015f\u0131l\u0131k geliyor.<\/p>\n<p><strong>\u00d6ZEL SEKT\u00d6R HES YATIRIMLARI<\/strong><\/p>\n<p>GAP kapsam\u0131nda bulunan iller i\u00e7erisinde GAP projesi kapsam\u0131 d\u0131\u015f\u0131nda \u00f6zel sekt\u00f6r taraf\u0131ndan 6446 say\u0131l\u0131 Kanun kapsam\u0131nda y\u00fcr\u00fct\u00fclmekte olan projeler de bulunuyor. Bu projelerin bug\u00fcn i\u00e7in 554 MW toplam kurulu g\u00fcc\u00fcndeki 21 adeti i\u015fletmede, 1.224 MW toplam kurulu g\u00fcc\u00fcndeki 12 adeti in\u015fa halinde ve 1.967 MW toplam kurulu g\u00fcc\u00fcndeki 47 adeti ise planlama a\u015famas\u0131nda bulunuyor.<\/p>\n<p>Bu projelerle birlikte GAP b\u00f6lgesinde toplam 11.000 MW potansiyel ile yakla\u015f\u0131k 40 milyar kWh elektrik \u00fcretimi HES\u2019lerden sa\u011flanabilecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/gap-kapsaminda-hesler-buyuk-potansiyele-sahip_12854.html#.VRaVffysUuw\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.GAP kapsam\u0131nda kamu ve \u00f6zel sekt\u00f6r taraf\u0131ndan yap\u0131lmas\u0131 planlanan 17 HES tamamland\u0131\u011f\u0131nda 40 milyar kWh elektrik \u00fcretilecek. Devlet Su \u0130\u015fleri (DS\u0130) resmi internet [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":37665,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[2273,1091,68,63,67,1009,2698,165,1214,35370,20593,1090,1854],"views":1486,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37664"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=37664"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37664\/revisions"}],"predecessor-version":[{"id":37666,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37664\/revisions\/37666"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/37665"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=37664"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=37664"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=37664"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}