{"id":37576,"date":"2015-03-25T18:43:45","date_gmt":"2015-03-25T15:43:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=37576"},"modified":"2015-03-25T18:43:45","modified_gmt":"2015-03-25T15:43:45","slug":"akkuyu-ngsdeki-ertelemeye-ragmen-reklam-gosterimi-surecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngsdeki-ertelemeye-ragmen-reklam-gosterimi-surecek\/","title":{"rendered":"(Turkish) Akkuyu NGS\u2019deki Ertelemeye Ra\u011fmen Reklam G\u00f6sterimi S\u00fcrecek&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/37576\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #000000;\"><strong>T\u00fcrkiye\u2019nin Mersin\u2019de yap\u0131lmas\u0131 planlanan ilk n\u00fckleer santraline b\u00fcrokrasi darbesi geldi. Jet \u00c7ED (\u00e7evre etki de\u011ferlendirme)s\u00fcreciyle bir an \u00f6nce kazma vurulmas\u0131 beklenen projenin, izin s\u00fcre\u00e7lerindeki t\u0131kanma nedeniyle ertelenebilece\u011fi ifade ediliyor. Televizyonlarda d\u00f6nmeye ba\u015flayan n\u00fckleer santralin cami ve T\u00fcrk bayra\u011f\u0131 temalar\u0131na yer verilen Reklam filminin ise g\u00f6sterimine devam edilece\u011fi \u00f6\u011frenildi.<\/strong><span id=\"more-70845\"><\/span><\/p>\n<p style=\"color: #000000;\">Enerji sekt\u00f6r\u00fcn\u00fcn \u00fcst d\u00fczey temsilcilerinden edinilen bilgiye g\u00f6re, Ruslar\u0131n T\u00fcrkiye\u2019de kurdu\u011fu \u015firket olan Akkuyu NGS A.\u015e., \u00c7ED raporu Rusya Devlet Ba\u015fkan\u0131 Vladimir Putin\u2019in ziyaretinden \u00f6nce jet \u015fekilde onaylanan santral i\u00e7in T\u00fcrkiye<img loading=\"lazy\" class=\"alignleft wp-image-37577 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/akkuyu-ngsdeki-ertelemeye-ragmen-reklam-gosterimi-surecek-300x199.jpg\" alt=\"akkuyu-ngsdeki-ertelemeye-ragmen-reklam-gosterimi-surecek\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/akkuyu-ngsdeki-ertelemeye-ragmen-reklam-gosterimi-surecek-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/akkuyu-ngsdeki-ertelemeye-ragmen-reklam-gosterimi-surecek-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/akkuyu-ngsdeki-ertelemeye-ragmen-reklam-gosterimi-surecek-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/akkuyu-ngsdeki-ertelemeye-ragmen-reklam-gosterimi-surecek.jpg 870w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> Atom Enerjisi Kurumu\u2019na (TAEK) ba\u015fvurdu. Ancak TAEK, ba\u015fvuruda eksiklik buldu. Akkuyu\u2019nun ba\u015fvurusu i\u00e7in revizyon talebi yap\u0131lmadan, yeniden yap\u0131lmas\u0131 istendi. Bu s\u00fcrpriz karar\u0131n ard\u0131ndan Mersin\u2019e yap\u0131lacak n\u00fckleer santralin lisans s\u00fcreci de durmu\u015f oldu. Ba\u015fvurunun de\u011ferlendirilmesi i\u00e7in TAEK yerine yeni olu\u015fturulacak N\u00fckleer D\u00fczenleme Kurumu\u2019nun inisiyatif almas\u0131n\u0131n beklendi\u011fi \u00f6\u011frenildi. Bu kurumun ise Ba\u015fbakanl\u0131k\u2019a ba\u011fl\u0131 olmas\u0131 ve bu kapsamda lisans s\u00fcrecinin tamamen de\u011fi\u015febilece\u011fi ifade edildi.<\/p>\n<h2 style=\"color: #232323;\">Sahada i\u015fler y\u00fcr\u00fcyor<\/h2>\n<p style=\"color: #000000;\">Enerji kaynaklar\u0131, finansman planlamas\u0131n\u0131n \u00f6nceden yap\u0131ld\u0131\u011f\u0131n\u0131, b\u00fcrokratik s\u00fcre\u00e7lerin tamamlanmas\u0131 halinde santral in\u015faat\u0131n\u0131n yar\u0131n ba\u015flayabilece\u011fini ifade etti. Santralin tasar\u0131mla ilgili \u00e7al\u0131\u015fmalar\u0131n\u0131n s\u00fcrd\u00fc\u011f\u00fc ve sahadaki \u00e7al\u0131\u015fmalar\u0131n durdurulmad\u0131\u011f\u0131 kaydedildi.<\/p>\n<h2 style=\"color: #232323;\">\u2018Aksama olabilir\u2019<\/h2>\n<p style=\"color: #000000;\">Enerji ve Tabii Kaynaklar Bakan\u0131 Taner Y\u0131ld\u0131z ise, santral\u0131n tamamlanmas\u0131n\u0131n takvime g\u00f6re ger\u00e7ekle\u015ftirilmeye \u00e7al\u0131\u015f\u0131laca\u011f\u0131n\u0131 belirterek \u015funlar\u0131 s\u00f6yledi: \u201c22 milyar dolarl\u0131k bir projeden bahsediyoruz, tehdit ve f\u0131rsatlar\u0131 olur demi\u015ftim. 4.800 megavatl\u0131k n\u00fckleer g\u00fc\u00e7 santralinin devreye al\u0131nmas\u0131n\u0131 takvim i\u00e7erisinde ger\u00e7ekle\u015ftirmeye \u00e7al\u0131\u015faca\u011f\u0131z, bir k\u0131s\u0131m aksamalar olabilir.\u201d<\/p>\n<h2 style=\"color: #232323;\">Bu ilk erteleme de\u011fil\u2026<\/h2>\n<p style=\"color: #000000;\">Rosatom, d\u00f6rt \u00fcniteden olu\u015facak toplam 4.800 MW kurulu g\u00fcce sahip Akkuyu N\u00fckleer Santrali\u2019ni 20 milyar dolarl\u0131k yat\u0131r\u0131mla yapacak. Santralin bin 200 megavatl\u0131k ilk \u00fcnitesinin temelinin 2015\u2019in ba\u015f\u0131nda at\u0131lmas\u0131 bekleniyordu. Santralin ilk \u00fcnitesinin devreye al\u0131nmas\u0131 i\u00e7in \u00f6ng\u00f6r\u00fclen ilk tarih de 2019\u2019du. Daha sonra 2020 olarak revize edilen tarihin iki y\u0131l daha sarkabilece\u011fi ifade ediliyor.<\/p>\n<p style=\"color: #000000;\">Haberin Devam\u0131 i\u00e7in<a style=\"color: #c75615;\" href=\"http:\/\/www.milliyet.com.tr\/ertelemeye-selam-reklama-devam-\/ekonomi\/detay\/2033576\/default.htm\" target=\"_blank\" rel=\"nofollow\">\u00a0t\u0131klay\u0131n\u0131z&gt;&gt;&gt;<\/a><\/p>\n<p style=\"color: #000000;\">Kaynak: Milliyet<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin Mersin\u2019de yap\u0131lmas\u0131 planlanan ilk n\u00fckleer santraline b\u00fcrokrasi darbesi geldi. Jet \u00c7ED (\u00e7evre etki de\u011ferlendirme)s\u00fcreciyle bir an \u00f6nce kazma vurulmas\u0131 beklenen projenin, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":37577,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,22083,22082,63,67,1009,2698,165,71,21,88,2644,4948],"views":701,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37576"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=37576"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37576\/revisions"}],"predecessor-version":[{"id":37578,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37576\/revisions\/37578"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/37577"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=37576"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=37576"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=37576"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}