{"id":37525,"date":"2015-03-24T13:01:24","date_gmt":"2015-03-24T10:01:24","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=37525"},"modified":"2015-03-24T13:01:24","modified_gmt":"2015-03-24T10:01:24","slug":"ruslar-paraya-sikisti-akkuyu-ngs-2-yil-gecikecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ruslar-paraya-sikisti-akkuyu-ngs-2-yil-gecikecek\/","title":{"rendered":"(Turkish) Ruslar Paraya S\u0131k\u0131\u015ft\u0131; Akkuyu NGS 2 Y\u0131l Gecikecek&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/37525\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #000000;\"><strong>Akkuyu Santrali\u2019nde daha \u00f6nce 2020 y\u0131l\u0131na ertelenen ilk \u00fcretiminin en erken 2022 y\u0131l\u0131nda yap\u0131labilece\u011fi belirtiliyor. \u00c7\u00fcnk\u00fc AB ve ABD yapt\u0131r\u0131mlar\u0131yla petrol fiyatlar\u0131ndaki d\u00fc\u015f\u00fc\u015f\u00fcn Rusya\u2019ya maliyeti y\u00fcz\u00fcnden projeye kaynak aktar\u0131lam\u0131yor.<\/strong><span id=\"more-70812\"><\/span><\/p>\n<p style=\"color: #000000;\">T\u00fcrkiye\u2019nin ilk n\u00fckleer santrali olacak Mersin Akkuyu Santrali i\u00e7in planlanan s\u00fcre\u00e7ler \u00f6ng\u00f6r\u00fclerin gerisinde kal\u0131rken, ilk \u00fcr<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/ruslar-paraya-sikisti-akkuyu-ngs-2-yil-gecikecek.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-37526 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/ruslar-paraya-sikisti-akkuyu-ngs-2-yil-gecikecek-300x133.jpg\" alt=\"ruslar-paraya-sikisti-akkuyu-ngs-2-yil-gecikecek\" width=\"300\" height=\"133\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/ruslar-paraya-sikisti-akkuyu-ngs-2-yil-gecikecek-300x133.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/ruslar-paraya-sikisti-akkuyu-ngs-2-yil-gecikecek-500x221.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/ruslar-paraya-sikisti-akkuyu-ngs-2-yil-gecikecek-80x35.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/ruslar-paraya-sikisti-akkuyu-ngs-2-yil-gecikecek.jpg 870w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>etimin daha \u00f6nce ertelenen 2020\u2019den en erken 2 y\u0131l sonra 2022\u2019de ger\u00e7ekle\u015ftirilebilece\u011fi belirtiliyor. Reuters\u2019a bilgi veren yetkililer ve konu hakk\u0131nda bilgi sahibi kaynaklar, K\u0131r\u0131m\u2019\u0131 ilhak\u0131ndan sonra AB ve ABD\u2019nin yapt\u0131r\u0131mlar\u0131 ile petrol fiyatlar\u0131ndaki d\u00fc\u015f\u00fc\u015f\u00fcn Rusya ekonomisine getirdi\u011fi maliyetin projeye kaynak aktar\u0131lmas\u0131n\u0131 yava\u015flatt\u0131\u011f\u0131n\u0131, Akkuyu NGS i\u00e7in \u00f6ng\u00f6r\u00fclen i\u015flemlerin zaman\u0131nda tamamlanamamas\u0131n\u0131n yan\u0131 s\u0131ra T\u00fcrkiye\u2019deki idari ve hukuki s\u00fcre\u00e7lerin bitirilememi\u015f olmas\u0131n\u0131n gecikmede b\u00fcy\u00fck etkisinin oldu\u011funu bildirdi.<\/p>\n<p style=\"color: #000000;\">Enerji ve Tabii Kaynaklar Bakan\u0131 Taner Y\u0131ld\u0131z ise Mersin Akkuyu N\u00fckleer Santrali\u2019nin T\u00fcrkiye a\u00e7\u0131s\u0131ndan son derece \u00f6nemli oldu\u011funu belirterek, \u201cS\u00fcre\u00e7lerin h\u0131zland\u0131r\u0131lmas\u0131 gerekiyor\u201d dedi.<\/p>\n<h2 style=\"color: #232323;\">Ekonomik s\u0131k\u0131nt\u0131 etkili oldu<\/h2>\n<p style=\"color: #000000;\">Petrol ve do\u011falgazda y\u00fczde 90\u2019\u0131n \u00fczerinde d\u0131\u015fa ba\u011f\u0131ml\u0131 olan T\u00fcrkiye yerli ve yenilenebilir enerji kaynaklar\u0131n\u0131n yan\u0131 s\u0131ra n\u00fckleer santral projelerini hayata ge\u00e7irerek arz g\u00fcvenli\u011fi ve \u00e7e\u015fitlili\u011fi sa\u011flamay\u0131 hedefliyor. Bu kapsamda Rusya\u2019ya ilk n\u00fckleer santralini yapt\u0131racak olan T\u00fcrkiye, ikinci santrali Japonya-Fransa ortakl\u0131\u011f\u0131 ile Sinop\u2019a yapt\u0131rmay\u0131 planl\u0131yor. \u00dcst d\u00fczey bir yetkili, Rusya\u2019ya y\u00f6nelik yapt\u0131r\u0131mlar ve petrol fiyatlar\u0131ndaki gerilemenin yaratt\u0131\u011f\u0131 ekonomik s\u0131k\u0131nt\u0131n\u0131n ard\u0131ndan n\u00fckleer santrale ayr\u0131lan kaynak konusunda baz\u0131 sorunlar\u0131 g\u00fcndeme getirdi\u011fini belirterek, \u201cBunun yan\u0131 s\u0131ra T\u00fcrkiye\u2019deki b\u00fcrokratik s\u00fcre\u00e7lerin istenilen h\u0131zda tamamlanamamas\u0131 ve baz\u0131 izinlerin hen\u00fcz al\u0131namamas\u0131 s\u00fcrecin yava\u015flamas\u0131nda etkili oldu. Bunun sonucunda ilk elektrik \u00fcretimi en az 2 y\u0131l daha gecikecek. Bu da 2022\u2019ye kar\u015f\u0131l\u0131k geliyor\u201d dedi.<\/p>\n<h2 style=\"color: #232323;\">S\u00fcre\u00e7 takvimin gerisinde kald\u0131<\/h2>\n<p style=\"color: #000000;\">T\u00fcrkiye ile Rusya aras\u0131nda sa\u011flanan mutabakat kapsam\u0131nda Rusya, 4 \u00fcniteden olu\u015facak toplam 4.800 MW kurulu g\u00fcce sahip Akkuyu N\u00fckleer Santralini 20 milyar dolarl\u0131k yat\u0131r\u0131mla yapacak. Santralin ilk \u00fcnitesinin 2019\u2019da devreye al\u0131nmas\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyordu ancak bu tarih daha sonra 2020\u2019ye \u00f6telenmi\u015fti. Bir enerji yetkilisi, \u201cTemel at\u0131ld\u0131ktan sonra yedi y\u0131l sonra ilk \u00fcnite devreye girecek. Buna g\u00f6re zaten 2020 y\u0131l\u0131nda Akkuyu\u2019nun devreye girmesi m\u00fcmk\u00fcn de\u011fil. S\u00fcre\u00e7ler \u00f6ng\u00f6r\u00fclen takvimin olduk\u00e7a gerisinde kal\u0131yor. \u015eu an bile birinci reakt\u00f6r i\u00e7in devreye al\u0131nma tarihi 2022 g\u00f6r\u00fcn\u00fcyor\u201d dedi.<\/p>\n<p style=\"color: #000000;\">Rosatom Overseas Ba\u015fkan Yard\u0131mc\u0131s\u0131 Milko Kovachev Reuters\u2019a yapt\u0131\u011f\u0131 de\u011ferlendirmede, projenin zaman\u0131nda tamamlanaca\u011f\u0131n\u0131 savundu ancak herhangi bir tarih vermedi. Kovachev, \u201cN\u00fckleer santral i\u00e7in belirlenen programda tarihler net \u015fekilde belirlendi. Taahh\u00fctlerimizin planland\u0131\u011f\u0131 gibi tamamen kar\u015f\u0131lanaca\u011f\u0131na inan\u0131yorum\u201d dedi.<\/p>\n<h2 style=\"color: #232323;\">Ba\u015f\u0131ndan beri h\u0131zl\u0131 de\u011fildi<\/h2>\n<p style=\"color: #000000;\">Akkuyu NGS santral i\u00e7in zorunluluk olan \u00c7ED raporunu en ge\u00e7 2013 y\u0131l\u0131 sonunda almay\u0131 planl\u0131yordu ancak bunu 2014 sonunda alabildi. \u0130ngiliz savunma ve g\u00fcvenlik d\u00fc\u015f\u00fcnce kurulu\u015fu Royal United Services Institute\u2019den Aaron Stein, Akkuyu Santrali i\u00e7in yap\u0131lan takvimin ge\u00e7mi\u015fte oldu\u011fu gibi bug\u00fcn de ger\u00e7ek\u00e7i olmad\u0131\u011f\u0131n\u0131 belirterek, Rus ekonomisindeki geli\u015fmelerin de projeye olumsuz etkisinin olaca\u011f\u0131n\u0131n alt\u0131n\u0131 \u00e7izdi. Yetkililer, Akkuyu taraf\u0131ndan a\u00e7\u0131lan hidroteknik yap\u0131lara dair ihale sonu\u00e7lar\u0131n\u0131n resmi a\u00e7\u0131klamalara g\u00f6re 15 \u015eubat\u2019ta bitirilmesi gerekirken bu konunun 31 Mart\u2019a ertelendi\u011fini de belirtiyorlar. Proje hakk\u0131nda bilgi sahibi bir yetkili, Akkuyu NGS\u2019nin halen \u00c7ED ve ard\u0131ndan lisanslamaya kadar olan s\u00fcre\u00e7ler dahil hukuki i\u015flemlerin de bitmesinin bekledi\u011finin alt\u0131n\u0131 \u00e7izerek, \u201cYat\u0131r\u0131m\u0131n tam olarak ba\u015flamas\u0131 i\u00e7in belli s\u00fcre\u00e7lerin bitmesi gerekiyor. Proje ba\u015flad\u0131\u011f\u0131ndan bu yana taraflar s\u00fcre\u00e7leri \u00e7ok h\u0131zl\u0131 i\u015fletemedi. Bunlar\u0131n etkisi oluyor\u201d dedi.<\/p>\n<h2 style=\"color: #232323;\">\u2018Ortak bulam\u0131yor\u2019 iddias\u0131<\/h2>\n<p style=\"color: #000000;\">Bir\u00a0yetkili, projeye ortak olmak i\u00e7in yerli ve yabanc\u0131 \u015firketlerin ortal\u0131k talep ve niyetlerinin halen bulundu\u011funu, belli lisans i\u015flemleri tamamlanmadan ortal\u0131k i\u00e7in g\u00f6r\u00fc\u015fmelerin bekleyece\u011fini kaydetti ve, \u201cBu yat\u0131r\u0131m\u0131n yap\u0131lmas\u0131n\u0131n \u00f6n\u00fcnde hukuki olarak herhangi bir engel kalmad\u0131\u011f\u0131n\u0131n g\u00f6r\u00fclmesi gerekir, yat\u0131r\u0131mc\u0131lar da bunu istiyor\u201d dedi. Royal United Services Institute\u2019den Aaron Stein ise Rosatom\u2019un ortakl\u0131k i\u00e7in yat\u0131r\u0131mc\u0131 bulamad\u0131\u011f\u0131n\u0131 iddia ederek, \u201cBu temel olarak proje finansman\u0131yla ilgili olarak sorunlardan kaynaklan\u0131yor. Bu konu ruble de\u011fer kayb\u0131ndan sonra daha acil bir sorun haline geldi. T\u00fcrk ekonomisindeki yava\u015flama daha az elektrik t\u00fcketimi anlam\u0131na gelecek. Bu; projede elektrik i\u00e7in hesaplanan maliyet varsay\u0131mlar\u0131n\u0131n daha fazla ge\u00e7erli olmad\u0131\u011f\u0131n\u0131 g\u00f6steriyor\u201d dedi.<\/p>\n<p style=\"color: #000000;\">Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Akkuyu Santrali\u2019nde daha \u00f6nce 2020 y\u0131l\u0131na ertelenen ilk \u00fcretiminin en erken 2022 y\u0131l\u0131nda yap\u0131labilece\u011fi belirtiliyor. \u00c7\u00fcnk\u00fc AB ve ABD yapt\u0131r\u0131mlar\u0131yla petrol fiyatlar\u0131ndaki [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":37526,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[1026,4403,5465,63,67,1009,2698,165,71,21,347,885,17118,667,1452],"views":655,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37525"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=37525"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37525\/revisions"}],"predecessor-version":[{"id":37527,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37525\/revisions\/37527"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/37526"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=37525"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=37525"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=37525"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}