{"id":37284,"date":"2015-03-15T18:47:39","date_gmt":"2015-03-15T15:47:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=37284"},"modified":"2015-03-15T18:47:39","modified_gmt":"2015-03-15T15:47:39","slug":"aksa-enerji-2151-mw-kurulu-guce-ulasti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-enerji-2151-mw-kurulu-guce-ulasti\/","title":{"rendered":"(Turkish) Aksa Enerji 2151 MW Kurulu G\u00fcce Ula\u015ft\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/37284\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Aksa Enerji`nin K\u0131y\u0131k\u00f6y r\u00fczg\u00e2r park\u0131ndaki kurulu g\u00fc\u00e7, kalan 3 MW`lik k\u0131sm\u0131n devreye girmesiyle 27 MW`ye \u00e7\u0131kt\u0131. Aksa`n\u0131n toplam kurulu g\u00fcc\u00fc ise 2151 MW`ye ula\u015ft\u0131.<\/strong><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/aksa-enerji-2151-mw-kurulu-guce-ulasti.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-37285 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/aksa-enerji-2151-mw-kurulu-guce-ulasti-300x205.jpg\" alt=\"aksa-enerji-2151-mw-kurulu-guce-ulasti\" width=\"300\" height=\"205\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/aksa-enerji-2151-mw-kurulu-guce-ulasti-300x205.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/aksa-enerji-2151-mw-kurulu-guce-ulasti-72x50.jpg 72w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/aksa-enerji-2151-mw-kurulu-guce-ulasti.jpg 468w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Aksa Enerji, K\u0131rklareli`nin K\u0131y\u0131k\u00f6y Beldesi yak\u0131nlar\u0131ndaki r\u00fczg\u00e2r park\u0131ndaki kurulu g\u00fc\u00e7le ilgili bir a\u00e7\u0131klama yapt\u0131. A\u00e7\u0131klamaya g\u00f6re, EPDK taraf\u0131ndan verilen 04\/04\/2007 tarih, E\u00dc\/1149-3\/823 numaral\u0131 \u00fcretim lisans\u0131 kapsam\u0131ndaki r\u00fczg\u00e2r park\u0131n\u0131n 3 MW`l\u0131k k\u0131sm\u0131n\u0131n Bakanl\u0131k kabul\u00fc yap\u0131ld\u0131. B\u00f6ylece Aksa Enerji K\u0131y\u0131k\u00f6y R\u00fczg\u00e2r Enerji Santrali`nin toplam 27 MW kurulu g\u00fcce ula\u015ft\u0131.<\/p>\n<p>Aksa Enerji, son ilaveyle birlikte toplam elektrik kurulu g\u00fcc\u00fcn\u00fc 2 bin 151 MW`a y\u00fckseltti. Aksa Enerji`nin toplam kurulu g\u00fc\u00e7 i\u00e7erisindeki r\u00fczg\u00e2r park\u0131 kapasitesi 250 MW`a, toplam yenilenebilir kapasitesi ise 278 MW`a y\u00fckseldi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/aksa-enerji-2151-mw-kurulu-guce-ulasti_12711.html\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Aksa Enerji`nin K\u0131y\u0131k\u00f6y r\u00fczg\u00e2r park\u0131ndaki kurulu g\u00fc\u00e7, kalan 3 MW`lik k\u0131sm\u0131n devreye girmesiyle 27 MW`ye \u00e7\u0131kt\u0131. Aksa`n\u0131n toplam kurulu g\u00fcc\u00fc ise 2151 MW`ye [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":37285,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[1571,68,19,63,67,1009,2698,165,3955,21908,474,69,16,231,21909],"views":1030,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37284"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=37284"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37284\/revisions"}],"predecessor-version":[{"id":37286,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37284\/revisions\/37286"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/37285"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=37284"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=37284"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=37284"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}