{"id":37236,"date":"2015-03-13T14:25:22","date_gmt":"2015-03-13T11:25:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=37236"},"modified":"2015-03-13T14:25:22","modified_gmt":"2015-03-13T11:25:22","slug":"abd-gunes-elektriginde-20-gwa-ulasti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/abd-gunes-elektriginde-20-gwa-ulasti\/","title":{"rendered":"(Turkish) ABD G\u00fcne\u015f Elektri\u011finde 20 GW\u2019a Ula\u015ft\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/37236\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>G\u00fcne\u015f elektri\u011fi ABD\u2019de ge\u00e7en y\u0131l devreye giren yeni elektrik \u00fcretim kapasitesinin y\u00fczde 32\u2019sini olu\u015fturdu.<\/strong><\/p>\n<p style=\"color: #444444;\">ABD\u2019nin g\u00fcne\u015f elektri\u011fi kurulu g\u00fcc\u00fcn\u00fcn 2014 y\u0131l\u0131nda 7 GW\u2019a yak\u0131n art\u0131\u015f ile 20 GW d\u00fczeyine ula\u015ft\u0131\u011f\u0131 bildirildi.<\/p>\n<p style=\"color: #444444;\">ABD merkezli ara\u015ft\u0131rma kurulu\u015fu GTM Research ve G\u00fcne\u015f Enerjisi Sekt\u00f6r<br \/>\n\u00fc Derne\u011fi (SEIA) taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamaya g\u00f6re \u00fclkede ge\u00e7en y\u0131l devr<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/abd-gunes-elektriginde-20-gwa-ulasti.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-37238\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/abd-gunes-elektriginde-20-gwa-ulasti-300x163.jpg\" alt=\"abd-gunes-elektriginde-20-gwa-ulasti\" width=\"300\" height=\"163\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/abd-gunes-elektriginde-20-gwa-ulasti-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/abd-gunes-elektriginde-20-gwa-ulasti-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/abd-gunes-elektriginde-20-gwa-ulasti.jpg 460w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>eye giren yeni g\u00fcne\u015f elektri\u011fi kurulu g\u00fcc\u00fc bir \u00f6nceki y\u0131la g\u00f6re y\u00fczde 30 oran\u0131nda art\u0131\u015f g\u00f6sterdi.<\/p>\n<p style=\"color: #444444;\">A\u00e7\u0131klamadaki verilere g\u00f6re 2014 y\u0131l\u0131ndaki art\u0131\u015f\u0131n 6.201 MW\u2019l\u0131k b\u00f6l\u00fcm\u00fc fotovoltaik sistem kurulumlar\u0131nda ger\u00e7ekle\u015firken, 767 MW\u2019l\u0131k b\u00f6l\u00fcm\u00fc ise konsantre g\u00fcne\u015f enerjisi (CSP) alan\u0131nda sa\u011fland\u0131.<\/p>\n<p style=\"color: #444444;\">2014 y\u0131l\u0131 kurulumlar\u0131 ile birlikte \u00fclkenin fotovoltaik alan\u0131ndaki kurulu g\u00fcc\u00fc 18,3 GW\u2019a, konsantre g\u00fcne\u015f enerjisi (CSP) alan\u0131ndaki kurulu g\u00fcc\u00fc ise 1,7 GW\u2019a ula\u015ft\u0131.<br \/>\nG\u00fcne\u015f enerjisi\u2019nin \u00fclkenin yeni elektrik yat\u0131r\u0131mlar\u0131ndaki pay\u0131 2014 y\u0131l\u0131nda da y\u00fckselmeye devam etti.<\/p>\n<p style=\"color: #444444;\">ABD\u2019de ge\u00e7en y\u0131l devreye giren yeni elektrik \u00fcretim kapasitesinde g\u00fcne\u015f enerjisi yat\u0131r\u0131mlar\u0131 y\u00fczde 32\u2019lik oranla, do\u011fal gaz santrallerinden sonra ikinci s\u0131rada yer ald\u0131. Ayn\u0131 oran 2012 y\u0131l\u0131nda y\u00fczde 10, 2013 y\u0131l\u0131nda ise y\u00fczde 29 olmu\u015ftu.<\/p>\n<p style=\"color: #444444;\">\u00c7al\u0131\u015fmadaki dikkat \u00e7ekici bir di\u011fer noktaya g\u00f6re ise ge\u00e7en y\u0131l \u00fclkenin konut sekt\u00f6r\u00fcnde ger\u00e7ekle\u015fen 1,2 GW\u2019l\u0131k kurulumun 500 MW\u2019tan fazla b\u00f6l\u00fcm\u00fcn\u00fcn herhangi bir te\u015fvik uygulamas\u0131na ihtiya\u00e7 duymadan devreye girmi\u015f olmas\u0131 oldu.<\/p>\n<p style=\"color: #444444;\">\u00c7al\u0131\u015fman\u0131n 2015 y\u0131l\u0131 \u00f6ng\u00f6r\u00fcs\u00fcne g\u00f6re ise ABD\u2019nin yaln\u0131zca fotovoltaik alan\u0131ndaki kurulu g\u00fcc\u00fc bu y\u0131l 8,1 GW artabilecek.<\/p>\n<p style=\"color: #444444;\">G\u00fcne\u015f elektri\u011fi alan\u0131ndaki ilk ticari \u00e7al\u0131\u015fmalar\u0131n 1954 y\u0131l\u0131nda ba\u015flad\u0131\u011f\u0131 ABD,\u00a0 2013\u2019\u00fcn ilk yar\u0131s\u0131nda 10 GW\u2019l\u0131k g\u00fcce ula\u015fabilmi\u015fti.<\/p>\n<p style=\"color: #444444;\">Kaynak: <a href=\"http:\/\/www.yesilekonomi.com\/gunes-elektrigi\/abd-gunes-elektriginde-20-gwa-ulasti\" target=\"_blank\" rel=\"nofollow\">Ye\u015fil Ekonomi<\/a><\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.G\u00fcne\u015f elektri\u011fi ABD\u2019de ge\u00e7en y\u0131l devreye giren yeni elektrik \u00fcretim kapasitesinin y\u00fczde 32\u2019sini olu\u015fturdu. ABD\u2019nin g\u00fcne\u015f elektri\u011fi kurulu g\u00fcc\u00fcn\u00fcn 2014 y\u0131l\u0131nda 7 GW\u2019a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":37238,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[1198,19,63,67,1009,165,21886,227,1169,18797,13,2569,21768],"views":730,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37236"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=37236"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37236\/revisions"}],"predecessor-version":[{"id":37239,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37236\/revisions\/37239"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/37238"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=37236"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=37236"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=37236"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}