{"id":37134,"date":"2015-03-10T17:18:39","date_gmt":"2015-03-10T14:18:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=37134"},"modified":"2015-03-10T17:18:39","modified_gmt":"2015-03-10T14:18:39","slug":"dicle-nehrindeki-3-hes-projesi-firmalarin-vazgecmesiyle-iptal-edildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/dicle-nehrindeki-3-hes-projesi-firmalarin-vazgecmesiyle-iptal-edildi\/","title":{"rendered":"(Turkish) Dicle Nehri&#8217;ndeki 3 HES Projesi, Firmalar\u0131n Vazge\u00e7mesiyle \u0130ptal Edildi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/37134\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #000000;\"><strong>Diyarbak\u0131r\u2019da Dicle Nehri \u00fczerinde yap\u0131lacak olan ve Enerji Piyasas\u0131 D\u00fczenleme Kurulu\u2019nca (EPDK) da onaylanan 3 HES projesi, projeyi yapacak firmalar\u0131n vazge\u00e7mesi nedeniyle Orman ve Su \u0130\u015fleri Bakanl\u0131\u011f\u0131 taraf\u0131ndan iptal edildi.<\/strong><span id=\"more-70650\"><\/span><\/p>\n<p style=\"color: #000000;\">Diyarbak\u0131r\u2019daki STK\u2019lar, Dicle Nehri\u2019nin 90 kilometre \u00fczerinde ya<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/dicle-nehrindeki-3-hes-projesi-firmalarin-vazgecmesiyle-iptal-edildi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-37135\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/dicle-nehrindeki-3-hes-projesi-firmalarin-vazgecmesiyle-iptal-edildi-300x192.jpg\" alt=\"dicle-nehrindeki-3-hes-projesi-firmalarin-vazgecmesiyle-iptal-edildi\" width=\"300\" height=\"192\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/dicle-nehrindeki-3-hes-projesi-firmalarin-vazgecmesiyle-iptal-edildi-300x192.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/dicle-nehrindeki-3-hes-projesi-firmalarin-vazgecmesiyle-iptal-edildi-500x321.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/dicle-nehrindeki-3-hes-projesi-firmalarin-vazgecmesiyle-iptal-edildi-77x50.jpg 77w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/dicle-nehrindeki-3-hes-projesi-firmalarin-vazgecmesiyle-iptal-edildi.jpg 700w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>p\u0131lacak olan 3 HES projesinin suyu kurutaca\u011f\u0131n\u0131 belirterek, olaya tepki g\u00f6stermi\u015f ve HDP Diyarbak\u0131r Milletvekili Altan Tan ile birlikte \u00c7evre Ve \u015eehircilik Bakan\u0131 \u0130dris G\u00fcll\u00fcce ile g\u00f6r\u00fc\u015fm\u00fc\u015flerdi.<\/p>\n<p style=\"color: #000000;\">Yap\u0131lmas\u0131 halinde tarihi Diyarbak\u0131r surlar\u0131n\u0131n Uluslararas\u0131 UNESCO K\u00fclt\u00fcrel Miras\u0131 listesine adayl\u0131k s\u00fcrecini de olumsuz etkileyece\u011fini savunan Diyarbak\u0131r \u0130n\u015faat M\u00fchendisleri Odas\u0131 Ba\u015fkan\u0131 Turan Kapan, HES\u2019lerin iptal edilmesinin do\u011fru bir karar oldu\u011funu s\u00f6yledi.<\/p>\n<p style=\"color: #000000;\">Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Diyarbak\u0131r\u2019da Dicle Nehri \u00fczerinde yap\u0131lacak olan ve Enerji Piyasas\u0131 D\u00fczenleme Kurulu\u2019nca (EPDK) da onaylanan 3 HES projesi, projeyi yapacak firmalar\u0131n vazge\u00e7mesi nedeniyle [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":37135,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[17360,63,67,1009,2698,749,165,750,35370,21809,1090,3447],"views":1303,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37134"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=37134"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37134\/revisions"}],"predecessor-version":[{"id":37136,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37134\/revisions\/37136"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/37135"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=37134"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=37134"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=37134"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}