{"id":37048,"date":"2015-03-09T01:54:40","date_gmt":"2015-03-08T22:54:40","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=37048"},"modified":"2015-03-09T01:54:40","modified_gmt":"2015-03-08T22:54:40","slug":"yumurtalika-815-mwe-gucunde-termik-santral-geliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yumurtalika-815-mwe-gucunde-termik-santral-geliyor\/","title":{"rendered":"(Turkish) Yumurtal\u0131k\u2019a 815 MWe G\u00fcc\u00fcnde Termik Santral Geliyor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/37048\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Adana\u2019n\u0131n Yumurtal\u0131k \u0130l\u00e7esi Sug\u00f6z\u00fc Mahallesi sahiline, 815 MWe g\u00fcc\u00fcnde termik santral kuracak.<\/strong><\/p>\n<p>Ayas Enerji A.\u015e. firmas\u0131nca yap\u0131lmas\u0131 planlanan\u201dMisis Termik Santrali\u201d \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) T<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/yumurtalika-815-mwe-gucunde-termik-santral-geliyor.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-37049\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/yumurtalika-815-mwe-gucunde-termik-santral-geliyor.jpg\" alt=\"yumurtalika-815-mwe-gucunde-termik-santral-geliyor\" width=\"300\" height=\"206\" \/><\/a>oplant\u0131s\u0131 Sug\u00f6z\u00fc K\u00f6y Kona\u011f\u0131nda ger\u00e7ekle\u015ftirildi. Toplant\u0131ya santrali yapacak Ayas A.\u015e.\u2019nin yetkilileri \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131 CED \u0130zin Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, Do\u011fa Koruma Milli Parklar B\u00f6lge M\u00fcd\u00fcrl\u00fc\u011f\u00fc, Metroloji Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, Adana G\u0131da, Tar\u0131m ve Hayvanc\u0131l\u0131k M\u00fcd\u00fcrl\u00fc\u011f\u00fc, Adana \u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc ve Halk Sa\u011fl\u0131\u011f\u0131 M\u00fcd\u00fcrl\u00fc\u011f\u00fc g\u00f6revlileri ile vatanda\u015flar kat\u0131ld\u0131.<\/p>\n<p>Yat\u0131r\u0131mc\u0131 firma yetkilileri, bu projenin en son teknoloji oldu\u011funu Avrupa Birli\u011fi ve t\u00fcm d\u00fcnya taraf\u0131ndan kabul edilen, en yeni, en \u00e7evreci ve en verimli teknoloji oldu\u011funu anlatt\u0131.<\/p>\n<p>Ayas Enerji A\u015e. yetkilileri Sosyal Yat\u0131r\u0131m ve Destek Projeleri kapsam\u0131nda Misis Termik Santralinin in\u015faat\u0131nda 1200 ki\u015fi, i\u015fletme a\u015famas\u0131nda ise 300 ki\u015fi istihdam edilece\u011fini ve i\u015f g\u00fcc\u00fcn\u00fc m\u00fcmk\u00fcn oldu\u011funca b\u00f6lge insan\u0131ndan kar\u015f\u0131layacaklar\u0131n\u0131 ve b\u00f6lgede i\u015fsizli\u011fe de b\u00fcy\u00fck katk\u0131 sa\u011flayacaklar\u0131n\u0131 s\u00f6yledi.<\/p>\n<p>Misis Termik Santrali\u2019nde saatte 290 ton k\u00f6m\u00fcr, saniyede 250 ton denizden su de\u015farj\u0131 yap\u0131laca\u011f\u0131 ve santralde kullan\u0131lan k\u00f6m\u00fcr\u00fcn k\u00fcllerinin ise \u00e7imento fabrikalar\u0131na verilece\u011fi kaydedildi.<\/p>\n<p>Kaynak: \u0130HA<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Adana\u2019n\u0131n Yumurtal\u0131k \u0130l\u00e7esi Sug\u00f6z\u00fc Mahallesi sahiline, 815 MWe g\u00fcc\u00fcnde termik santral kuracak. Ayas Enerji A.\u015e. firmas\u0131nca yap\u0131lmas\u0131 planlanan\u201dMisis Termik Santrali\u201d \u00c7evresel Etki De\u011ferlendirme [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":37049,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[3272,63,67,1009,2698,165,438,21770],"views":1444,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37048"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=37048"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37048\/revisions"}],"predecessor-version":[{"id":37050,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/37048\/revisions\/37050"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/37049"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=37048"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=37048"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=37048"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}