{"id":36877,"date":"2015-03-03T11:34:13","date_gmt":"2015-03-03T08:34:13","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=36877"},"modified":"2015-03-03T11:34:13","modified_gmt":"2015-03-03T08:34:13","slug":"almanyadan-sasirtan-dev-termik-yatirimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/almanyadan-sasirtan-dev-termik-yatirimi\/","title":{"rendered":"(Turkish) Almanya`dan \u015ea\u015f\u0131rtan Dev Termik Yat\u0131r\u0131m\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/36877\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Almanya`da 827 MW`l\u0131k Moorburg k\u00f6m\u00fcr yak\u0131tl\u0131 termik santralinin ilk blo\u011fu test \u00fcretimini tamamlayarak \u015febekeye ba\u011fland\u0131.<\/strong><\/p>\n<p>Vattenfall \u015firketi, Almanya`n\u0131n Hamburg kentinde yakla\u015f\u0131k bir y\u0131l s\u00fcren test \u00fcretimini tamamlad\u0131\u011f\u0131 827 MW`l\u0131k Moorburg k\u00f6<img loading=\"lazy\" class=\"alignleft wp-image-36878 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/almanyadan-sasirtan-dev-termik-yatirimi-300x172.jpg\" alt=\"almanyadan-sasirtan-dev-termik-yatirimi\" width=\"300\" height=\"172\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/almanyadan-sasirtan-dev-termik-yatirimi-300x172.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/almanyadan-sasirtan-dev-termik-yatirimi-80x46.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/almanyadan-sasirtan-dev-termik-yatirimi.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>m\u00fcr yak\u0131tl\u0131 termik santralinin ilk blo\u011funun \u015febeke ba\u011flant\u0131s\u0131n\u0131 Cumartesi ak\u015fam\u0131 ger\u00e7ekle\u015ftirdi.<\/p>\n<p>Santralin ikinci blo\u011funun ise yaz aylar\u0131nda \u015febekeye ba\u011flanmas\u0131 planlan\u0131yor.<\/p>\n<p><strong>\u00c7EVREC\u0130LER KARA G\u00dcN \u0130LAN ETT\u0130<\/strong><\/p>\n<p>\u00d6te yandan yenilenebilir enerji te\u015fvikleriyle \u00f6n planda olan Almanya`da b\u00f6ylesi b\u00fcy\u00fck kapasiteli bir k\u00f6m\u00fcr projesinin hayata ge\u00e7irilmesi \u00e7evrecilerin tepkisini \u00e7ekti. \u00c7evreciler santralin \u015febekeye ba\u011fland\u0131\u011f\u0131 g\u00fcn\u00fc iklim de\u011fi\u015fikli\u011fi a\u00e7\u0131s\u0131ndan kara g\u00fcn ilan ettiler.<\/p>\n<p>Santralin her y\u0131l 8 ila 9 milyon ton karbondioksit sal\u0131m\u0131na neden olaca\u011f\u0131 hesaplan\u0131yor.<\/p>\n<p>2010`da Alman h\u00fck\u00fcmeti \u201cENERGIEWENDE\u201d diye adland\u0131rd\u0131\u011f\u0131 bir `Enerji Devrimi`ni ba\u015flatt\u0131\u011f\u0131n\u0131 ilan etmi\u015f ve \u00e7er\u00e7evedekarbondioksit gibi sera gaz\u0131 sal\u0131n\u0131mlar\u0131n\u0131 1990\u2019lardaki seviyelerden 2020\u2019ye kadar %40 oran\u0131nda 2050\u2019lere kadar ise %80 oran\u0131nda azaltmay\u0131 ama\u00e7lam\u0131\u015ft\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/almanyadan-sasirtan-dev-termik-yatirimi_12509.html#.VPVxMvmsV8E\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Almanya`da 827 MW`l\u0131k Moorburg k\u00f6m\u00fcr yak\u0131tl\u0131 termik santralinin ilk blo\u011fu test \u00fcretimini tamamlayarak \u015febekeye ba\u011fland\u0131. Vattenfall \u015firketi, Almanya`n\u0131n Hamburg kentinde yakla\u015f\u0131k bir y\u0131l [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":36878,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[929,63,67,1009,2698,165,1999,1675,21678,438,16949],"views":744,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/36877"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=36877"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/36877\/revisions"}],"predecessor-version":[{"id":36879,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/36877\/revisions\/36879"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/36878"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=36877"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=36877"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=36877"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}