{"id":36687,"date":"2015-02-24T16:41:29","date_gmt":"2015-02-24T13:41:29","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=36687"},"modified":"2015-02-24T16:41:29","modified_gmt":"2015-02-24T13:41:29","slug":"guris-holding-329-mwlik-arpa-hesi-satin-alarak-santral-sayisini-14e-cikardi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/guris-holding-329-mwlik-arpa-hesi-satin-alarak-santral-sayisini-14e-cikardi\/","title":{"rendered":"(Turkish) G\u00fcri\u015f Holding, 32,9 MW\u2019l\u0131k Arpa HES\u2019i Sat\u0131n Alarak Santral Say\u0131s\u0131n\u0131 14\u2019e \u00c7\u0131kard\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/36687\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #000000;\"><strong>G\u00fcri\u015f Holding, Artvin\u2019in Bor\u00e7ka il\u00e7esindeki Arpa Hidroelektrik Santralini (HES) sat\u0131n alarak elektrik \u00fcretim santral say\u0131s\u0131n\u0131 14\u2019e <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/02\/guris-holding-arpa-hes-artvin-857x550.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-36688\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/02\/guris-holding-arpa-hes-artvin-857x550-300x192.jpg\" alt=\"guris-holding-arpa-hes-artvin-857x550\" width=\"300\" height=\"243\" \/><\/a>\u00e7\u0131kard\u0131.<\/strong><\/p>\n<p style=\"color: #000000;\">Holdingden yap\u0131lan yaz\u0131l\u0131 a\u00e7\u0131klamada, Bor\u00e7ka il\u00e7esi Arpa deresi \u00fczerinde yer alan santralin 32,9 megavat kurulu g\u00fcce sahip oldu\u011fu belirtildi.<span id=\"more-70460\"><\/span>\u00a0Holdingin 2015 sonu itibariyle y\u0131ll\u0131k elektrik \u00fcretiminin 2 milyar 600 milyon kilovatsaate ula\u015faca\u011f\u0131 ifade edilen a\u00e7\u0131klamada, sadece HES\u2019lerden y\u0131ll\u0131k 300 milyon kilovatsaat enerji \u00fcretilece\u011fi bildirildi.<\/p>\n<p style=\"color: #000000;\">G\u00fcri\u015f \u0130n\u015faat ve M\u00fchendislik A\u015e\u2019nin Y\u00f6netim Kurulu Ba\u015fkan\u0131 M\u00fc\u015ffik Yamant\u00fcrk, yenilenebilir enerji kaynaklar\u0131n\u0131n tek bir \u00e7at\u0131 alt\u0131nda toplanmas\u0131n\u0131n, etkin kaynak y\u00f6netimi ve dengeleme a\u00e7\u0131s\u0131ndan b\u00fcy\u00fck \u00f6nem arz etti\u011fini kaydetti. Yamant\u00fcrk, \u201cTamam\u0131 yenilenebilir enerji kayna\u011f\u0131na dayal\u0131 473 megavatl\u0131k kurulu g\u00fc\u00e7, \u00fclkemizin artan enerji ihtiyac\u0131n\u0131n kar\u015f\u0131lanmas\u0131nda \u00e7ok \u00f6nemli bir katk\u0131 sa\u011flamaktad\u0131r. Bu ba\u011flamda G\u00fcri\u015f Holding\u2019in yurt i\u00e7i ve yurt d\u0131\u015f\u0131ndaki yenilebilir enerji alan\u0131ndaki yat\u0131r\u0131mlar\u0131 h\u0131z kesmeden devam edecektir\u201d ifadesini kulland\u0131.<\/p>\n<p style=\"color: #000000;\">Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. G\u00fcri\u015f Holding, Artvin\u2019in Bor\u00e7ka il\u00e7esindeki Arpa Hidroelektrik Santralini (HES) sat\u0131n alarak elektrik \u00fcretim santral say\u0131s\u0131n\u0131 14\u2019e \u00e7\u0131kard\u0131. Holdingden yap\u0131lan yaz\u0131l\u0131 a\u00e7\u0131klamada, Bor\u00e7ka [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":36688,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[21578,21579,21580,6320,105],"views":1634,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/36687"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=36687"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/36687\/revisions"}],"predecessor-version":[{"id":36689,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/36687\/revisions\/36689"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/36688"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=36687"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=36687"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=36687"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}