{"id":36603,"date":"2015-02-22T18:26:59","date_gmt":"2015-02-22T15:26:59","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=36603"},"modified":"2015-02-22T18:26:59","modified_gmt":"2015-02-22T15:26:59","slug":"mainstream-afrika-genelinde-res-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/mainstream-afrika-genelinde-res-kuracak\/","title":{"rendered":"(Turkish) Mainstream Afrika Genelinde RES Kuracak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/36603\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Afrika genelinde 2018 y\u0131l\u0131na kadar 700 MW ile 900 MW aras\u0131nda r\u00fczgar enerji kurulumu ger\u00e7e<\/strong><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/02\/mainstream-afrika-genelinde-res-kuracak.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-36604 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/02\/mainstream-afrika-genelinde-res-kuracak-300x215.jpg\" alt=\"mainstream-afrika-genelinde-res-kuracak\" width=\"300\" height=\"215\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/02\/mainstream-afrika-genelinde-res-kuracak-300x215.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/02\/mainstream-afrika-genelinde-res-kuracak-69x50.jpg 69w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/02\/mainstream-afrika-genelinde-res-kuracak.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><strong>kle\u015ftirilecek.<\/strong><\/p>\n<p>Global r\u00fczgar ve g\u00fcne\u015f enerjisi \u015firketi Mainstream Renewable Power, 1.9 milyar dolarl\u0131k pan-Afrikan Yenilenebilir Enerji Platformu projesi geli\u015ftirecek.<\/p>\n<p>Lekela Power ba\u015fl\u0131kl\u0131 proje kapsam\u0131nda, Afrika genelinde 2018 y\u0131l\u0131na kadar 700 MW ile 900 MW aras\u0131nda r\u00fczgar enerji kurulumu ger\u00e7ekle\u015ftirilecek.<\/p>\n<p>Mainstream ge\u00e7en hafta yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, G\u00fcney Afrika`da kurulacak olan 360 MW`l\u0131k \u00fc\u00e7 adet r\u00fczgar santrali i\u00e7in gerekli olan finansal ihtiyac\u0131n \u00f6zel \u015firket Actis ile i\u015fbirli\u011fi \u00e7er\u00e7evesinde kar\u015f\u0131land\u0131\u011f\u0131n\u0131 belirtti.<\/p>\n<p>\u015eirket ayr\u0131ca, Gana`da projeler y\u00fcr\u00fctt\u00fcklerini ve di\u011fer Afrika`n\u0131n di\u011fer b\u00f6lgelerinde de yat\u0131r\u0131m olanaklar\u0131n\u0131 de\u011ferlendirdiklerini belirtti.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/mainstream-afrika-genelinde-res-kuracak_12354.html\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Afrika genelinde 2018 y\u0131l\u0131na kadar 700 MW ile 900 MW aras\u0131nda r\u00fczgar enerji kurulumu ger\u00e7ekle\u015ftirilecek. Global r\u00fczgar ve g\u00fcne\u015f enerjisi \u015firketi Mainstream Renewable [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":36604,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[1976,63,67,1009,2698,165,21529,21530,474,69,16],"views":703,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/36603"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=36603"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/36603\/revisions"}],"predecessor-version":[{"id":36605,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/36603\/revisions\/36605"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/36604"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=36603"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=36603"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=36603"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}