{"id":36396,"date":"2015-02-14T15:14:13","date_gmt":"2015-02-14T12:14:13","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=36396"},"modified":"2015-02-14T15:14:13","modified_gmt":"2015-02-14T12:14:13","slug":"rwe-900-mwlik-res-projesinin-yarisini-statkrafta-satti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/rwe-900-mwlik-res-projesinin-yarisini-statkrafta-satti\/","title":{"rendered":"(Turkish) RWE, 900 MW`l\u0131k RES Projesinin Yar\u0131s\u0131n\u0131 Statkraft`a Satt\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/36396\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>RWE, \u0130ngilte a\u00e7\u0131klar\u0131ndaki Kuzey Denizi`nde bulunan 900 MW`l\u0131k Triton Knoll a\u00e7\u0131k deniz r\u00fczgar santralinin yar\u0131s\u0131n\u0131 4 milyar Sterlin`e Statkraft`a satt\u0131.<\/strong><\/p>\n<p>RWE bir bas\u0131n a\u00e7\u0131klamas\u0131 yaparak, \u0130ngiltere a\u00e7\u0131klar\u0131ndaki Kuzey Denizi`nde yapmay\u0131 planlad\u0131\u011f\u0131 900 MW`l\u0131k Trit<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/02\/rwe-900-mwlik-res-projesinin-yarisini-statkrafta-satti.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-36397 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/02\/rwe-900-mwlik-res-projesinin-yarisini-statkrafta-satti-300x150.jpg\" alt=\"rwe-900-mwlik-res-projesinin-yarisini-statkrafta-satti\" width=\"300\" height=\"150\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/02\/rwe-900-mwlik-res-projesinin-yarisini-statkrafta-satti-300x150.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/02\/rwe-900-mwlik-res-projesinin-yarisini-statkrafta-satti-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/02\/rwe-900-mwlik-res-projesinin-yarisini-statkrafta-satti.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>on Knoll a\u00e7\u0131k deniz r\u00fczgar santralinin yar\u0131s\u0131n\u0131 Norve\u00e7li enerji \u015firketi Statkraft`a satt\u0131\u011f\u0131n\u0131 duyurdu.<\/p>\n<p>RWE a\u00e7\u0131klamas\u0131nda projenin yap\u0131m ve geli\u015ftirme \u00e7al\u0131\u015fmalar\u0131n\u0131n Statkraft \u00f6nc\u00fcl\u00fc\u011f\u00fcnde RWE\/ Statkraft ortak proje timi taraf\u0131ndan ger\u00e7ekle\u015ftirilece\u011fini ifade etti.<\/p>\n<p>RWE CEO`su Hans Bunting, Triton Knoll benzeri bir proje i\u00e7in g\u00fcvenilir ortakl\u0131\u011f\u0131n yenilenebilir stratejileri a\u00e7\u0131s\u0131ndan kilit \u00f6nemde oldu\u011funu belirterek, Statkraft ile ger\u00e7ekle\u015ftirdikleri ortakl\u0131\u011f\u0131n a\u00e7\u0131k deniz r\u00fczgar yat\u0131r\u0131mlar\u0131n\u0131n cazibesini artt\u0131rd\u0131\u011f\u0131n\u0131 s\u00f6yledi.<\/p>\n<p>Santralin 2017 y\u0131l\u0131nda \u00fcretime ge\u00e7mesi planlan\u0131yor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/rwe-900-mwlik-res-projesinin-yarisini-statkrafta-s_12251.html\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.RWE, \u0130ngilte a\u00e7\u0131klar\u0131ndaki Kuzey Denizi`nde bulunan 900 MW`l\u0131k Triton Knoll a\u00e7\u0131k deniz r\u00fczgar santralinin yar\u0131s\u0131n\u0131 4 milyar Sterlin`e Statkraft`a satt\u0131. RWE bir bas\u0131n [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":36397,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[63,67,1009,2698,165,21407,69,16,3242,2679,17574,21406],"views":818,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/36396"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=36396"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/36396\/revisions"}],"predecessor-version":[{"id":36398,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/36396\/revisions\/36398"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/36397"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=36396"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=36396"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=36396"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}