{"id":35879,"date":"2015-01-29T14:13:53","date_gmt":"2015-01-29T11:13:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=35879"},"modified":"2015-01-29T14:13:53","modified_gmt":"2015-01-29T11:13:53","slug":"yorum-akkuyu-nukleer-santrali-gecikiyor-mu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yorum-akkuyu-nukleer-santrali-gecikiyor-mu\/","title":{"rendered":"(Turkish) Yorum: Akkuyu N\u00fckleer Santrali Gecikiyor mu?"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/35879\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #000000;\"><strong>Akkuyu N\u00fckleer Santrali\u2019nin in\u015faat\u0131 bir t\u00fcrl\u00fc ba\u015flayam\u0131yor. Son olarak Ruslar\u0131n Akkuyu\u2019da (Mersin) yapaca\u011f\u0131 n\u00fckleer santral projesinde ba\u015fvuru sorunu ya\u015fan\u0131yor.<\/strong><span id=\"more-69969\"><\/span><\/p>\n<p style=\"color: #000000;\">Enerji Y\u00f6netimi kaynaklar\u0131ndan aktar\u0131lan bilgilere g\u00f6re Rus \u015firketi Akkuyu N\u00fckleer A\u015e, in\u015faat i\u015flemlerine ba\u015flamak i\u00e7in T\u00fcrkiye Atom Enerjisi Kurumu\u2019na (TAEK) ba\u015fvuru yapt\u0131. \u015eirket bunun i\u00e7in gerekli ba\u015fvuru bedeli-harc\u0131 da yat\u0131rd\u0131. Ancak TAEK s\u00fcrpriz bir \u015fekilde ba\u015fvuru eksikliklerini gerek\u00e7e g\u00f6stererek Akkuyu \u015firketinden ba\u015fvurunun geri al\u0131nmas\u0131n\u0131 istedi. TAEK\u2019in bu tavr\u0131na satral in\u015faat\u0131 i\u00e7in olumsuz bir geli\u015fme ve kriz olarak bak\u0131labilir. \u00c7\u00fcnk\u00fc, Ener<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/yorum-akkuyu-nukleer-santrali-gecikiyor-mu.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-35880\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/yorum-akkuyu-nukleer-santrali-gecikiyor-mu-300x199.jpg\" alt=\"yorum-akkuyu-nukleer-santrali-gecikiyor-mu\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/yorum-akkuyu-nukleer-santrali-gecikiyor-mu-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/yorum-akkuyu-nukleer-santrali-gecikiyor-mu-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/yorum-akkuyu-nukleer-santrali-gecikiyor-mu-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/yorum-akkuyu-nukleer-santrali-gecikiyor-mu.jpg 870w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ji Bakan\u0131 Taner Y\u0131ld\u0131z, aral\u0131k ay\u0131 sonunda \u2018Akkuyu in\u015faat\u0131n\u0131n Mart 2015\u2019te ba\u015flayaca\u011f\u0131\u2019 a\u00e7\u0131klamas\u0131 yapm\u0131\u015ft\u0131. Akkuyu \u015firketi, \u2018Ba\u015fvuru ve TAEK cevab\u0131\u2019 konusunda bir bilgilendirme yapmad\u0131. Ancak, s\u00fcrecte s\u0131k\u0131nt\u0131lar ya\u015fand\u0131\u011f\u0131 bir ger\u00e7ek.<\/p>\n<p style=\"color: #000000;\">Bilindi\u011fi gibi Akkuyu N\u00fckleer Santrali, T\u00fcrkiye\u2019nin Akdeniz k\u0131y\u0131s\u0131ndaki Mersin\u2019de in\u015fa ediliyor. Santral i\u00e7in 12 May\u0131s 2010\u2019da \u201cT\u00fcrkiye Cumhuriyeti h\u00fck\u00fcmeti ile Rusya Federasyonu h\u00fck\u00fcmeti aras\u0131nda T\u00fcrkiye Cumhuriyeti\u2019nde Akkuyu sahas\u0131nda bir n\u00fckleer g\u00fc\u00e7 santralinin tesisine ve i\u015fletimine dair i\u015fbirli\u011fine ili\u015fkin anla\u015fma\u201d imzaland\u0131. Her biri 1.200 megawat (MW) kurulu g\u00fcc\u00fcnde 4 \u00fcniteden olu\u015facak santral faaliyete ge\u00e7tikten sonra yakla\u015f\u0131k 35 milyar kilowatssat (kWh) elektrik enerjisi \u00fcretimi s\u00f6z konusu olacak. Akkuyu Santrali\u2019nin i\u015fletme \u00f6mr\u00fc 60 y\u0131l olup ilk \u00fcretim i\u00e7in 15 y\u0131ll\u0131k al\u0131m garantisi s\u00f6z konusu. Projenin yakla\u015f\u0131k 20 milyar dolara tamamlanmas\u0131 planlan\u0131rken Rusya\u2019n\u0131n Ankara B\u00fcy\u00fckel\u00e7isi Vladimir Ivanovski\u2019nin Moskova\u2019da yapt\u0131\u011f\u0131 a\u00e7\u0131klamadan sonra \u2018Akkuyu\u2019da in\u015fa edilecek n\u00fckleer santralin 20 milyar dolar olarak belirlenen maliyetinin 25 milyar dolara \u00e7\u0131kabilece\u011fi\u2019 a\u00e7\u0131klamas\u0131 yapm\u0131\u015ft\u0131.<\/p>\n<p style=\"color: #000000;\"><strong>RUSLAR \u015eA\u015eKIN<\/strong><\/p>\n<p style=\"color: #000000;\">Ya\u015fad\u0131klar\u0131 ekonomik krizre ra\u011fmen ilgin\u00e7 bir \u015fekilde Akkuyu N\u00fckleer Santrali\u2019ni g\u00fcndeme alan Ruslar\u0131n, in\u015faat \u00e7al\u0131\u015fmalar\u0131na ba\u015flayabilmek i\u00e7in TAEK\u2019e ba\u015fvurdu\u011fu ortaya \u00e7\u0131kt\u0131. Ancak Ruslar, TAEK\u2019in \u2018Ba\u015fvuru eksikliklikleri var\u2019 cevab\u0131yla \u015foke oldu. Rus \u015firketi; \u00c7ED raporu, ba\u015fvuru bedeli gibi gerekli prosed\u00fcrlerin tamamland\u0131\u011f\u0131n\u0131 ileri s\u00fcrerek gerekli iznin verilmesi konusunda \u0131srarl\u0131. Ruslar\u0131n \u0131srar\u0131 \u00fczerine TAEK, resm\u00ee bir yaz\u0131yla Ruslara eksiklikler var gerek\u00e7esiyle ba\u015fvurunun geri \u00e7ekilip sonradan yap\u0131lmas\u0131n\u0131 istiyor. Ruslar, TAEK yaz\u0131s\u0131n\u0131n \u015fa\u015fk\u0131nl\u0131\u011f\u0131n\u0131 ya\u015farken bu konuda ilgin\u00e7 de\u011ferlendirmeler de yap\u0131l\u0131yor: TAEK, gerekli izinleri vermezse n\u00fckleer santralde s\u00fcre\u00e7 daha da uzayacak. \u0130zinlerin verilebilmesi i\u00e7in ba\u015fvurular\u0131n al\u0131nmas\u0131 ve zaman\u0131nda cevap verilmesi gerekiyor. Bunun i\u00e7in TAEK altyap\u0131s\u0131 tamam de\u011fil. Bunun yan\u0131nda \u2018TAEK\u2019in yeni olu\u015fturulacak N\u00fckleer D\u00fczenleme Kurumu\u2019yla s\u00fcrecin ba\u015flat\u0131lmas\u0131, y\u00f6netimin g\u00f6revden al\u0131nacak olmas\u0131 nedeniyle risk almak istememeleri, Ruslar\u0131n santral tasar\u0131m\u0131n\u0131 sunmamalar\u0131 da s\u00fcreci geciktiren di\u011fer iddialar olarak \u00f6ne \u00e7\u0131k\u0131yor. Buna bir de h\u00fck\u00fcmetin Haziran 2015 se\u00e7imlerinden \u00f6nce n\u00fckleer santralin temelini atma hedefini eklemek laz\u0131m. Ama, konu n\u00fckleer santral oldu\u011fundan her y\u00f6netici ve kurumun \u00e7ok dikkatli ve tedbirli olmas\u0131 gerekiyor.<\/p>\n<p style=\"color: #000000;\"><em><strong>Yazan: \u0130smail Altunsoy<\/strong><\/em><\/p>\n<p style=\"color: #000000;\"><em><strong>Kaynak:\u00a0<a style=\"color: #c75615;\" href=\"http:\/\/www.zaman.com.tr\/ekonomi_akkuyu-nukleer-santrali-gecikiyor-mu_2273774.html\" target=\"_blank\" rel=\"nofollow\">Zaman<\/a><\/strong><\/em><\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Akkuyu N\u00fckleer Santrali\u2019nin in\u015faat\u0131 bir t\u00fcrl\u00fc ba\u015flayam\u0131yor. Son olarak Ruslar\u0131n Akkuyu\u2019da (Mersin) yapaca\u011f\u0131 n\u00fckleer santral projesinde ba\u015fvuru sorunu ya\u015fan\u0131yor. Enerji Y\u00f6netimi kaynaklar\u0131ndan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":35880,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[21092,19126,1026,2878,68,19590,19638,63,67,1009,165,71,21,2644,667,4948],"views":914,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/35879"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=35879"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/35879\/revisions"}],"predecessor-version":[{"id":35881,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/35879\/revisions\/35881"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/35880"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=35879"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=35879"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=35879"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}