{"id":35778,"date":"2015-01-26T22:00:12","date_gmt":"2015-01-26T19:00:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=35778"},"modified":"2015-01-26T22:00:12","modified_gmt":"2015-01-26T19:00:12","slug":"gunes-ve-ruzgara-2-958-mw-trafo-kapasitesi-tahsis-edildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gunes-ve-ruzgara-2-958-mw-trafo-kapasitesi-tahsis-edildi\/","title":{"rendered":"(Turkish) G\u00fcne\u015f ve R\u00fczgara 2.958 MW Trafo Kapasitesi Tahsis Edildi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/35778\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e) yay\u0131nlad\u0131\u011f\u0131 duyuru ile G\u00fcne\u015f Enerjisi ve R\u00fczgar Enerjisi sa<\/strong><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/gunes-ruzgar-enerjisi-teias-trafo-merkezi-kapasiteleri-res-ges-trafo-merkezleri.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-35779\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/gunes-ruzgar-enerjisi-teias-trafo-merkezi-kapasiteleri-res-ges-trafo-merkezleri-300x190.jpg\" alt=\"gunes-ruzgar-enerjisi-teias-trafo-merkezi-kapasiteleri-res-ges-trafo-merkezleri\" width=\"300\" height=\"190\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/gunes-ruzgar-enerjisi-teias-trafo-merkezi-kapasiteleri-res-ges-trafo-merkezleri-300x190.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/gunes-ruzgar-enerjisi-teias-trafo-merkezi-kapasiteleri-res-ges-trafo-merkezleri-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/gunes-ruzgar-enerjisi-teias-trafo-merkezi-kapasiteleri-res-ges-trafo-merkezleri.jpg 480w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><strong>ntralleri i\u00e7in tahsis edilen trafo merkezi kapasitelerini a\u00e7\u0131klad\u0131.<\/strong><\/p>\n<p>T\u00fcrkiye genelinde GES+RES toplam <strong>2.958 MW<\/strong> kapsasite tahsis edilirken, maksimum kapasite <strong>4.457 MW<\/strong> olarak belirlendi.\u00a0Tabloyu a\u015fa\u011f\u0131da bulabilirsiniz.<\/p>\n<p><strong>PDF format\u0131nda<\/strong> indirmek i\u00e7in <a title=\"teia\u015f ges res kapasite\" href=\"http:\/\/www.teias.gov.tr\/\/Duyurular\/Lisanss%C4%B1z%20Tahsis%20Edilen%20GES-RES%20Kapasiteleri.pdf\" target=\"_blank\" rel=\"nofollow\">t\u0131klay\u0131n\u0131z&gt;&gt;&gt;<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e) yay\u0131nlad\u0131\u011f\u0131 duyuru ile G\u00fcne\u015f Enerjisi ve R\u00fczgar Enerjisi santralleri i\u00e7in tahsis edilen trafo merkezi kapasitelerini a\u00e7\u0131klad\u0131. T\u00fcrkiye genelinde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":35779,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,50],"tags":[63,67,1009,2698,165,227,13,69,16,1582,21024,4309],"views":1053,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/35778"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=35778"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/35778\/revisions"}],"predecessor-version":[{"id":35780,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/35778\/revisions\/35780"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/35779"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=35778"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=35778"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=35778"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}