{"id":35742,"date":"2015-01-25T13:27:02","date_gmt":"2015-01-25T10:27:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=35742"},"modified":"2015-01-25T13:27:02","modified_gmt":"2015-01-25T10:27:02","slug":"suudi-arabistan-gunes-elektrigi-hedeflerini-oteledi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/suudi-arabistan-gunes-elektrigi-hedeflerini-oteledi\/","title":{"rendered":"(Turkish) Suudi Arabistan G\u00fcne\u015f Elektri\u011fi Hedeflerini \u00d6teledi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/35742\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Suudi Arabistan\u2019\u0131n 2032 i\u00e7in belirledi\u011fi 41 GW\u2019l\u0131k g\u00fcne\u015f elektri\u011fi kurulu g\u00fc\u00e7 hedefini 2040 y\u0131l\u0131na \u00f6teledi\u011fi a\u00e7\u0131kland\u0131. A\u00e7\u0131klama \u00fclkenin yenilenebilir ve n\u00fckleer enerji yat\u0131r\u0131mlar\u0131n\u0131 y\u00f6nlendirmesi amac\u0131 ile kurulan Kral Abdullah Atom ve Yenilenebilir Enerji \u015eehri (KA-CARE) direkt\u00f6r\u00fc Ha\u015fim bin Abdullah Yemeni taraf\u0131ndan yap\u0131ld\u0131.<\/strong><\/p>\n<p>Abu Dabi\u2019de d\u00fczenlenen bir konferansta konu\u015fan Yemeni karar\u0131n gerek\u00e7esi hakk\u0131nda a\u00e7\u0131klamada bulunmazken, \u00fclkenin ilk g\u00fcne\u015f elektri\u011fi veya n\u00fckleer enerji santralinin ne zaman devreye girece\u011fi konusunda da bir bilgi payla\u015fmad\u0131.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/suudi-arabistan-gunes-elektrigi-edeflerini-oteledi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-35743\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/suudi-arabistan-gunes-elektrigi-edeflerini-oteledi-300x163.jpg\" alt=\"suudi-arabistan-gunes-elektrigi-edeflerini-oteledi\" width=\"300\" height=\"163\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/suudi-arabistan-gunes-elektrigi-edeflerini-oteledi-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/suudi-arabistan-gunes-elektrigi-edeflerini-oteledi-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/suudi-arabistan-gunes-elektrigi-edeflerini-oteledi.jpg 460w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Ha\u015fim Yemeni konu\u015fmas\u0131nda ama\u00e7lar\u0131n\u0131n Suudi Arabistan i\u00e7in en uygun teknolojiyi bulmak oldu\u011funu s\u00f6yledi.<\/p>\n<p>Ger\u00e7ekle\u015ftirilecek g\u00fcne\u015f elektri\u011fi santrallerinin y\u00fczde 80 oran\u0131nda yerli \u00fcretim ekipman kullanmas\u0131n\u0131 hedeflediklerini de kaydeden Yemeni bu sayede Suudi Arabistan\u2019\u0131n yenilenebilir enerji teknolojisi ihra\u00e7 edebilecek b\u00f6lgesel bir merkez haline gelebilece\u011fini kaydetti.<\/p>\n<p>KA-CARE taraf\u0131ndan 2012 y\u0131l\u0131nda yap\u0131lan bir a\u00e7\u0131klamada Suudi Arabistan\u2019\u0131n 2032 y\u0131l\u0131nda g\u00fcne\u015f elektri\u011finde 41 GW, r\u00fczgar ve jeotermal enerji alanlar\u0131nda ise 21 GW\u2019l\u0131k g\u00fcce ula\u015fmas\u0131n\u0131n hedefledi\u011fi duyurulmu\u015ftu.<\/p>\n<p>Bununla birlikte \u0130ngiltere merkezli d\u00fc\u015f\u00fcnce kurulu\u015fu Chatham House taraf\u0131ndan 2011 y\u0131l\u0131nda yay\u0131nlanan bir \u00e7al\u0131\u015fmada ise \u00fclkenin mevcut enerji politikalar\u0131n\u0131n s\u00fcrd\u00fcr\u00fclemez oldu\u011fu iddia edilmi\u015fti.<\/p>\n<p>\u00c7al\u0131\u015fmaya g\u00f6re petrol \u00fcretiminin d\u00f6rtte birini i\u00e7 enerji t\u00fcketimi i\u00e7in harcayan Suudi Arabistan, bu durumu de\u011fi\u015ftirmedi\u011fi takdirde 2038 y\u0131l\u0131na gelindi\u011finde petrol ihra\u00e7 etmek zorunda kalabilecek.<\/p>\n<p>\u00c7al\u0131\u015fmadaki tespitlere g\u00f6re n\u00fcfusu son 40 y\u0131lda d\u00f6rt katan artan \u00fclkenin enerji talebi de y\u0131ll\u0131k y\u00fczde 8\u2019lik ortalama ile art\u0131yor ve \u00fclke 2011 y\u0131l\u0131 itibari ile bu talebi kar\u015f\u0131lamak i\u00e7in g\u00fcnl\u00fck 2,8 milyon varil petrol kullan\u0131yor. \u00dclkenin ki\u015fi ba\u015f\u0131 enerji t\u00fcketimi de ABD ile ayn\u0131 d\u00fczeyde iken, Japonya\u2019n\u0131n ise iki kat\u0131.<\/p>\n<p>Suudi Arabistan y\u00f6netimi bu talebi kar\u015f\u0131lamak i\u00e7in n\u00fckleer enerji alan\u0131nda da \u00e7al\u0131\u015fmalar y\u00fcr\u00fctmekte. \u00dclke 2030 y\u0131l\u0131nda toplamda 14 GW kurulu g\u00fcce sahip 16 n\u00fckleer enerji reakt\u00f6r\u00fcn\u00fc devreye almay\u0131 planl\u0131yor. \u00dclke y\u00f6netimi bu hedef do\u011frultusunda Fransa ve G\u00fcney Kore ile 2011 y\u0131l\u0131nda, \u00c7in ile de 2012 y\u0131l\u0131nda anla\u015fma imzalam\u0131\u015ft\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.yesilekonomi.com\/gunes-elektrigi\/suudi-arabistan-gunes-elektrigi-hedeflerini-oteledi\" target=\"_blank\" rel=\"nofollow\">Ye\u015fil Ekonomi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Suudi Arabistan\u2019\u0131n 2032 i\u00e7in belirledi\u011fi 41 GW\u2019l\u0131k g\u00fcne\u015f elektri\u011fi kurulu g\u00fc\u00e7 hedefini 2040 y\u0131l\u0131na \u00f6teledi\u011fi a\u00e7\u0131kland\u0131. A\u00e7\u0131klama \u00fclkenin yenilenebilir ve n\u00fckleer enerji yat\u0131r\u0131mlar\u0131n\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":35743,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[21000,63,67,1009,2698,165,227,1169,13,21002,21001,1463,105],"views":717,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/35742"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=35742"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/35742\/revisions"}],"predecessor-version":[{"id":35744,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/35742\/revisions\/35744"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/35743"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=35742"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=35742"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=35742"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}