{"id":35382,"date":"2015-01-14T14:53:32","date_gmt":"2015-01-14T11:53:32","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=35382"},"modified":"2015-01-14T14:55:28","modified_gmt":"2015-01-14T11:55:28","slug":"ozgul-holding-res-lisans-ihalesi-icin-4-milyar-euroluk-kaynak-ayirdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ozgul-holding-res-lisans-ihalesi-icin-4-milyar-euroluk-kaynak-ayirdi\/","title":{"rendered":"(Turkish) \u00d6zg\u00fcl Holding, RES Lisans \u0130halesi i\u00e7in 4 Milyar Euroluk Kaynak Ay\u0131rd\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/35382\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #000000;\"><strong>Enerjide yerli kaynaklara d\u00f6n\u00fclmesi yat\u0131r\u0131mc\u0131lar\u0131 harekete ge\u00e7irdi. \u00d6zg\u00fcl Holding Ba\u015fkan\u0131 \u00d6zg\u00fcl, \u201cNisandaki 4 milyar euroluk r\u00fczg\u00e2r lisans\u0131n\u0131n tamam\u0131 i\u00e7in kaynak haz\u0131r\u201d dedi.<\/strong><span id=\"more-69769\"><\/span><\/p>\n<p style=\"color: #000000;\">T\u00fcrkiye\u2019nin r\u00fczg\u00e2r enerji santralinde (RES) en b\u00fcy\u00fck lisansa sahip \u015firketi \u00d6zg\u00fcl Holding, Nisan 2015\u2019te yap\u0131lacak dev ihale i\u00e7in 4 milyar euroluk kaynak ay\u0131rd\u0131. <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/r\u00fczgar-t\u00fcrbinleri-enerji-230980231.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-35383\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/r\u00fczgar-t\u00fcrbinleri-enerji-230980231-300x220.jpg\" alt=\"r\u00fczgar-t\u00fcrbinleri-enerji-23098023\" width=\"300\" height=\"243\" \/><\/a>EPDK\u2019n\u0131n nisan ay\u0131nda yapaca\u011f\u0131 3 bin megavatl\u0131k r\u00fczg\u00e2r enerjisi santrali lisans ihalesi i\u00e7in haz\u0131rl\u0131klar\u0131n\u0131 tamamlayan \u015firkete, K\u00f6rfez, ABD ve Kanada\u2019dan \u00e7ok say\u0131da yat\u0131r\u0131mc\u0131, \u201cBirlikte hareket edelim\u201d \u00f6nerisi getirdi. T\u00fcrkiye\u2019nin enerji \u00fcretiminde y\u00f6n\u00fcn\u00fc r\u00fczgar, g\u00fcne\u015f ve n\u00fckleere \u00e7evirmesinin ard\u0131ndan enerjide b\u00fcy\u00fck yat\u0131r\u0131m hamlelerinin g\u00fcndeme geldi\u011fini s\u00f6yleyen \u00d6zg\u00fcl Holding Ba\u015fkan\u0131 \u00d6mer Faruk \u00d6zg\u00fcl, \u201cT\u00fcrkiye tarihi bir karar verdi. Art\u0131k r\u00fczg\u00e2r ve g\u00fcne\u015fe d\u00f6nmeye ba\u015flad\u0131k. Bu nedenle yat\u0131r\u0131ma ge\u00e7meyen lisanslar iptal edilerek, ger\u00e7ek yat\u0131r\u0131mc\u0131lara verilmeli. Nisanda yap\u0131lacak 3 bin megavatl\u0131k r\u00fczgar lisans\u0131 ihalesinde 3 bin megavatl\u0131k teklif verece\u011fiz\u201d dedi.<\/p>\n<p style=\"color: #000000;\">\u015eARTLAR ESNEMES\u0130N<\/p>\n<p style=\"color: #000000;\">7 y\u0131ld\u0131r 8 bin megavatl\u0131k lisans\u0131n ise bo\u015f bekledi\u011fini vurgulayan \u00d6zg\u00fcl, \u201cBu lisanslar\u0131n hayata ge\u00e7meyenlerinin de iptal edilmesi gerekir\u201d diye konu\u015ftu. RES\u2019te \u015fartlar\u0131n a\u011f\u0131rla\u015ft\u0131r\u0131ld\u0131\u011f\u0131n\u0131 belirten \u00d6zg\u00fcl, \u015funlar\u0131 anlatt\u0131: \u201cSadece haz\u0131rl\u0131k i\u00e7in 40 milyon lira harcad\u0131k. \u00c7\u00fcnk\u00fc kriterler zorla\u015ft\u0131. Umar\u0131z bu \u015fartlar esnetilmez.\u201d<\/p>\n<p style=\"color: #000000;\">YATIRIMI \u00c7ANTACI ENGELL\u0130YOR<\/p>\n<p style=\"color: #000000;\">T\u00fcrkiye\u2019de 11 bin megavatl\u0131k r\u00fczg\u00e2r enerjisi lisans\u0131 oldu\u011funu, bunun sadece 3 binlik k\u0131sm\u0131n\u0131n \u00e7al\u0131\u015ft\u0131\u011f\u0131n\u0131 s\u00f6yleyen \u00d6zg\u00fcl, \u201cElinde lisans olan baz\u0131 yat\u0131r\u0131mc\u0131lar, i\u015f yapm\u0131yor, yapan\u0131 da engelliyor\u201d dedi. \u00d6zg\u00fcl, lisans al\u0131nd\u0131ktan sonra yat\u0131r\u0131m\u0131n bitmesi i\u00e7in 5 y\u0131ll\u0131k bir s\u00fcrenin oldu\u011funu ama ger\u00e7ek yat\u0131r\u0131mc\u0131n\u0131n santrali en k\u00f6t\u00fc \u015fartlarda 3 y\u0131lda bitirebilece\u011fini vurgulad\u0131. \u015eu an T\u00fcrkiye\u2019nin en b\u00fcy\u00fck portf\u00f6y\u00fcn\u00fcn kendilerinde oldu\u011funu s\u00f6yleyen \u00d6zg\u00fcl, s\u00f6zlerini \u015f\u00f6yle s\u00fcrd\u00fcrd\u00fc: \u201c3 bin 900 megavatl\u0131k ba\u015fvurunun mali b\u00fcy\u00fckl\u00fc\u011f\u00fc 3.9 milyar euroya denk geliyor. Finans s\u0131k\u0131nt\u0131m\u0131z yok. D\u00fcnyadaki en b\u00fcy\u00fck yenilebilir i\u015f geli\u015ftirme \u015firketiyiz. \u015eu anda 100 civar\u0131nda \u00f6l\u00e7\u00fcm istasyonu kurduk. Bunun haricinde bin 400 megavat da g\u00fcne\u015f enerjisi ba\u015fvurusu olacak.\u201d<\/p>\n<p style=\"color: #000000;\">Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerjide yerli kaynaklara d\u00f6n\u00fclmesi yat\u0131r\u0131mc\u0131lar\u0131 harekete ge\u00e7irdi. \u00d6zg\u00fcl Holding Ba\u015fkan\u0131 \u00d6zg\u00fcl, \u201cNisandaki 4 milyar euroluk r\u00fczg\u00e2r lisans\u0131n\u0131n tamam\u0131 i\u00e7in kaynak haz\u0131r\u201d dedi. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":35383,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[63,18,750,19301,20789,233,16,20790],"views":880,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/35382"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=35382"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/35382\/revisions"}],"predecessor-version":[{"id":35385,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/35382\/revisions\/35385"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/35383"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=35382"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=35382"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=35382"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}