{"id":35035,"date":"2015-01-03T23:33:02","date_gmt":"2015-01-03T20:33:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=35035"},"modified":"2015-01-03T23:34:14","modified_gmt":"2015-01-03T20:34:14","slug":"ozyegin-denizliye-10-mwlik-ges-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ozyegin-denizliye-10-mwlik-ges-kuracak\/","title":{"rendered":"(Turkish) \u00d6zye\u011fin, Denizli`ye 10 MW`lik GES Kuracak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/35035\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>H\u00fcsn\u00fc \u00d6zye\u011fin`in patronu oldu\u011fu Fiba Grubu`nun \u015firketi Fina Enerji, Denizli`de 10 MW`ye yak\u0131n g\u00fcne\u015fe dayal\u0131 lisanss\u0131z elektrik \u00fcretim tesisi kuracak.<\/strong><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/ozyegin-denizliye-10-mwlik-ges-kuracak.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-35036 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/ozyegin-denizliye-10-mwlik-ges-kuracak-300x199.jpg\" alt=\"ozyegin-denizliye-10-mwlik-ges-kuracak\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/ozyegin-denizliye-10-mwlik-ges-kuracak-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/ozyegin-denizliye-10-mwlik-ges-kuracak-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/ozyegin-denizliye-10-mwlik-ges-kuracak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/ozyegin-denizliye-10-mwlik-ges-kuracak.jpg 637w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Enerji G\u00fcnl\u00fc\u011f\u00fc`n\u00fcn edindi\u011fi bilgilere g\u00f6re, T\u00fcrkiye`nin en zengin i\u015fadamlar\u0131ndan, eski \u00fcnl\u00fc bankac\u0131 H\u00fcsn\u00fc \u00d6zye\u011fin, lisanss\u0131z elektrik \u00fcretim yat\u0131r\u0131mlar\u0131 alan\u0131ndaki \u00e7al\u0131\u015fmalar\u0131n\u0131 h\u0131zland\u0131rd\u0131.<\/p>\n<p>Bu kapsamda Fina Enerji taraf\u0131ndan Denizli`deki \u00c7ardak Havaliman\u0131 yak\u0131nlar\u0131nda kurulan 700 kW`l\u0131k lisanss\u0131z tesis ge\u00e7ti\u011fimiz g\u00fcnlerde ge\u00e7ici kabul alarak \u00fcretime ge\u00e7ti.<\/p>\n<p>Fina Enerji`nin Denizli s\u0131n\u0131rlar\u0131 i\u00e7indeki yeni GES geli\u015ftirme \u00e7al\u0131\u015fmalar\u0131 da devam ediyor. \u015eirket Ac\u0131payam ve Honaz il\u00e7e s\u0131n\u0131rlar\u0131 i\u00e7inde toplam 9 MW`lik GES kurmaya yetecek b\u00fcy\u00fckl\u00fckte araziler sat\u0131n ald\u0131.<\/p>\n<p>Fina Enerji Ac\u0131payam`daki araziye toplam 4 MW`lik d\u00f6rt GES kurmaya haz\u0131rlan\u0131yor.<\/p>\n<p>Yazan: Mehmet KARA<\/p>\n<p><strong>Haberin <a href=\"http:\/\/enerjigunlugu.net\/ozyegin-denizliye-10-mwlik-ges-kuracak_11556.html\" target=\"_blank\" rel=\"nofollow\">Devam\u0131 \u0130\u00e7in TIKLAYINIZ&gt;&gt;&gt;<\/a><\/strong><\/p>\n<p>Kaynak: Enerji G\u00fcnl\u00fc\u011f\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.H\u00fcsn\u00fc \u00d6zye\u011fin`in patronu oldu\u011fu Fiba Grubu`nun \u015firketi Fina Enerji, Denizli`de 10 MW`ye yak\u0131n g\u00fcne\u015fe dayal\u0131 lisanss\u0131z elektrik \u00fcretim tesisi kuracak. Enerji G\u00fcnl\u00fc\u011f\u00fc`n\u00fcn edindi\u011fi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":35036,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[845,63,67,1009,165,12054,2326,227,13,2569,3138,12159,3235],"views":783,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/35035"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=35035"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/35035\/revisions"}],"predecessor-version":[{"id":35039,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/35035\/revisions\/35039"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/35036"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=35035"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=35035"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=35035"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}