{"id":34798,"date":"2014-12-25T18:15:40","date_gmt":"2014-12-25T15:15:40","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=34798"},"modified":"2014-12-25T18:17:48","modified_gmt":"2014-12-25T15:17:48","slug":"alstom-turkiyede-uretilen-en-buyuk-genarator-transformatorunu-teslim-etti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/alstom-turkiyede-uretilen-en-buyuk-genarator-transformatorunu-teslim-etti\/","title":{"rendered":"(Turkish) Alstom, T\u00fcrkiye\u2019de \u00dcretilen En B\u00fcy\u00fck Genarat\u00f6r Transformat\u00f6r\u00fcn\u00fc Teslim Etti&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/34798\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #000000;\"><strong>Alstom Grid T\u00fcrkiye, S\u0131rbistan\u2019da Nikola Tesla Enerji Santrali Tent-B\u2019de kullan\u0131lmak \u00fczere PE EPS\u2013S\u0131rbistan (Public Enterprise- Electric Power Industry of Serbia\/Kamu Kurulu\u015fu \u2013 S\u0131rbistan Elektrik Enerji End\u00fcstrisi) i\u00e7in \u00fcretti\u011fi generat\u00f6r transformat\u00f6r\u00fcn\u00fcn sevkiyat\u0131n\u0131 ba\u015far\u0131yla ger\u00e7ekle\u015ftirdi.<\/strong><\/p>\n<p style=\"color: #000000;\"><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/Nicola-Tesla-Power-Transformers.jpg\"><img loading=\"lazy\" class=\"aligncenter  wp-image-34799\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/Nicola-Tesla-Power-Transformers-271x300.jpg\" alt=\"Nicola-Tesla-Power-Transformers\" width=\"460\" height=\"270\" \/><\/a><\/p>\n<p style=\"color: #000000;\">\u015eimdiye kadar T\u00fcrkiye\u2019de tasarlanan ve \u00fcretilen en b\u00fcy\u00fck transformat\u00f6r olma \u00f6zelli\u011fini ta\u015f\u0131yan 725 MVA, 21\/410 kV y\u00fckseltici transformat\u00f6r, ayn\u0131 zamanda Alstom \u2018un T\u00fcrkiye\u2019den S\u0131rbistan\u2019a yapt\u0131\u011f\u0131 ilk ihracat.<\/p>\n<p style=\"color: #000000;\">S\u0131rbistan\u2019\u0131n en b\u00fcy\u00fck enerji santrali kompleksi Nikola Tesla Enerji Santrali , senelik 18 TWh elektrik \u00fcretimiyle neredeyse \u00fclkenin yar\u0131s\u0131n\u0131n enerji ihtiyac\u0131n\u0131 kar\u015f\u0131l\u0131yor. Alstom\u2019un y\u00fckseltici transformat\u00f6r\u00fc, generat\u00f6rden elde edilen elektri\u011fi y\u00fcksek gerilim nakil hatt\u0131 ile t\u00fcketim yerine kadar ula\u015ft\u0131racak.. Transformat\u00f6r, enerji santralinin, 400 kV S\u0131rbistan iletim \u015febekesine ba\u011flanmas\u0131nda kritik bir rol oynayacak.<\/p>\n<p style=\"color: #000000;\">Bu tip transformat\u00f6rler i\u015fletme \u00f6m\u00fcrleri boyunca a\u015f\u0131r\u0131 uyar\u0131lma, y\u00fcklenme ve \u0131s\u0131nmaya maruz kal\u0131rlar. Kesintisiz g\u00fc\u00e7 iletimi sa\u011flamak i\u00e7in Alstom, kulland\u0131\u011f\u0131 en son teknolojiyle t\u00fcm bu parametreleri tasar\u0131m ve \u00fcretim s\u00fcre\u00e7lerine entegre eder. Bu transformat\u00f6r, MS-3000 on-line durum izleme sistemi ile donat\u0131lm\u0131\u015ft\u0131r ve Nicola Tesla Enerji Santraline, g\u00fc\u00e7 transformat\u00f6r\u00fcn\u00fcn performans\u0131n\u0131 ve g\u00fcvenli i\u015fletim ko\u015fullar\u0131n\u0131 on-line de\u011ferlerdirme imkan\u0131 sunar.<\/p>\n<p style=\"color: #000000;\"><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/Alstom-Grid-Gebze-Factory.reduce-size1.jpg\"><img loading=\"lazy\" class=\"aligncenter  wp-image-34801\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/Alstom-Grid-Gebze-Factory.reduce-size1-300x200.jpg\" alt=\"Alstom-Grid-Gebze-Factory.reduce-size1\" width=\"455\" height=\"254\" \/><\/a><\/p>\n<p style=\"color: #000000;\">Alstom Grid T\u00fcrkiye G\u00fc\u00e7 Transformat\u00f6r\u00fc Genel M\u00fcd\u00fcr\u00fc Hakan Karado\u011fan; \u201cS\u0131rbistan\u2019\u0131n en b\u00fcy\u00fck enerji \u00fcretim \u015firketi PE-EPS ile \u00e7al\u0131\u015fmaktan dolay\u0131 son derece memnunuz. Bu projeyle bu alandaki teknik bilgimiz, y\u00fcksek kalite standartlar\u0131m\u0131z ve deneyimimiz d\u00fcnya genelinde bir kez daha kan\u0131tland\u0131. Bu y\u00fckseltici transformat\u00f6r ve en son teknoloji \u00fcr\u00fcn\u00fc on-line izleme sistemi ile Nicola Tesla Santrali, t\u00fcketicilerine istikrarl\u0131 ve g\u00fcvenilir y\u00fcksek gerilim sistemi sunabilecek ve santralin verimlili\u011fini otomatik olarak artt\u0131racakt\u0131r\u201d dedi.<\/p>\n<p style=\"color: #000000;\">Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Alstom Grid T\u00fcrkiye, S\u0131rbistan\u2019da Nikola Tesla Enerji Santrali Tent-B\u2019de kullan\u0131lmak \u00fczere PE EPS\u2013S\u0131rbistan (Public Enterprise- Electric Power Industry of Serbia\/Kamu Kurulu\u015fu \u2013 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":34799,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4],"tags":[9503,68,19590,19638,63,3136,1009,20426,20427,846],"views":1295,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/34798"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=34798"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/34798\/revisions"}],"predecessor-version":[{"id":34803,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/34798\/revisions\/34803"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/34799"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=34798"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=34798"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=34798"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}